ML18093B309

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-272/88-19 & 50-311/88-20 on 880927-1107.No Violations Noted
ML18093B309
Person / Time
Site: Salem  
Issue date: 11/21/1988
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Miltenberger S
Public Service Enterprise Group
Shared Package
ML18093B311 List:
References
NUDOCS 8811290404
Download: ML18093B309 (2)


See also: IR 05000272/1988019

Text

.

. .,.

Docket Nos.

50-272

50-311

Public Service Electric and Gas Company

ATTN:

Mr. Steven E. Miltenberger

21 NOV 1988

Vice President and Chief Nuclear Officer

P. 0. Box 236

Hancocks Bridge, New Jersey 08038

Gentlemen:

Subject:

Combined Inspection 50-272/88-19 and 50-311/88-20

This transmits the findings of the routine resident safety inspection by

Mr. R. Borchardt and Mrs.

K~ Halvey Gibson, of this office, on September 27,

1988 to November 7, *1988, at the Salem Nuclear Generating Station, Hancocks

Bridge, New Jersey.

The inspection ~onsisted of do~ument reviews, interviews,

and observation of activities.

The findings were discussed with

Mr. L. K. Miller, of your.staff.

Within the scope of this inspection, no violations were observed.

However,

your attention is directed to paragraph 7 of this report which discusses a

number of problems identified regarding the proper establishment and implemen-

tation of procedures at Salem.

You are ~equested to provide a written response

detailing your assessment of these concerns, and those corrective actions you

plan to take to resolve them. Please provide the requested response within 30

days of receipt of this letter.

This letter also acknowledges receipt of your respon?e dated October 19, 1988

to the violation cited in .NRC combined inspection report 50-272/88-16 and

50-311/88-16.

Your response and corrective actions are being reviewed and will

be discussed in a future inspection report.

Your cooperation with us is appreciated.

Sincerely,

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosure:

NRC Combined Report 50-272/88-19 and 50-311/88-20

8811290404 881171

F.1.'DR

ADOCK 05006~72

PDC

OFFICIAL RECORD COPY

CIR SALEM 88-19/20 - 0001.0.0

11111188 ~ f-o I ~

L

Public Service Electric

and Gas Company

cc:

21NOV1988

-2-

Jack Urban, General Manager, Fuel Department, Delmarva Power & Light Co.

L. K. Miller, General Manager - Salem Operations

B. A. Preston, Manager, Nuclear Licensing and Regulations

General Manager, Nuclear Safety Review

M. J. Wetterhahn, Esquire

R. Fryling, Jr., Esquire

.Scott B. Ungerer, Manager, Joint Generation Projects Department,

Atlantic Electric

Licensing Project Manager, NRR

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center

NRC Resident Inspector

. State of New Jersey

bee:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

J. C. Stone, NRR Licensing Project Manager

Robert J. Bores, DRSS.

B. Clayton, EDO

G. W. Meyer, Senior Resident Inspector; Hope Creek

L. W. Rossbach, Senior Resident Inspector, Indian Point 2

E. Conner, RI:TSSS (Section 9, only)

if!

Swetland/rhl

>

11/1 l/88

d, 7

mer

11~//88

OFFICIAL RECORD COPY

CIR SALEM 88-19/20 - 0002.0.0

11/16/88