Forwards Response to NRC Bulletin 88-003 Re Potential Inadequate Latch Engagement in GE Hfa latching-type Relays. Results of Review of Relays Found Satisfactory
ML18093B296
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/14/1988
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
IEB-88-003, IEB-88-3, NLR-N88189, NUDOCS 8811220290
Download: ML18093B296 (3)


Text

Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236: Hancocks Bridge, NJ 08038 609-339-4800 V:ce Pres:cent - Nuclear Operations NOV 1 4 1988 NLR-N88189 United states Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

RESPONSE TO NRC BULLETIN 88-03 SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 Public Service Electric and Gas Company {PSE&G) has received the subject NRC Bulletin regarding potential inadequate latch engagement in GE HFA latching-type relays.

The information requested by this Bulletin as it relates to Salem Unit 2 is provided in the enclosure to this letter.

Should you have any questions with regard to this transmittal, please do not hesitate to contact us.

c Mr. J. c. Stone Licensing Project Manager Ms. K. Halvey Gibson,_ Acting senior Resident Inspector Sincerely, Mr. w. T. Russell, Administrator Region I Ms. J. Moon, Interim Chief

.New.Jersey Department of Environmental Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 8811220290 881114 PDR ADOCK 05000311 G

PNU Protection

.rc11

-'I I

STATE OF NEW JERSEY COUNTY OF SALEM

)

SS.

)

REF: RESPONSE TO NRC BULLETIN 88-03 Stanley LaBruna, being duly sworn-according to law deposes and says:

I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated October 14, 1988

, concerning the Salem Generating Station, Unit No. 2, are true to the best of my knowledge, information and belief.

Subscribed and sworn t~ befo7e me thiJJ /.fwd-day of..;..~------"-'

~t../.

--~L 1988

~L'i:ofNew Jersey lARAINE Y. BEARD Notary Public of New Jeraey My Commission Expires May 1, 1991 My commission 'expires on --~~~~~~~~~~~~~--

I RESPONSE TO BULLETIN 88-03 SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 ENCLOSURE The purpose of this bulletin was to request licensees to perform inspections to ensure that all GE latching-type HFA relays installed in safety-related applications have adequate latch engagement and that those relays which fail to meet acceptance criteria be repaired or replaced.

The bulletin requested a letter of confirmation that the inspection had been completed and a summary of the number of relays inspected and any corrective actions taken.

This information is presented below as it relates to Salem Unit 2.

RESPONSE

The NRC Bulletin 88-03 GE HFA latching-type relay inspection for Salem Unit 2 was performed in October 1988 during the Fourth Refueling outage.

Documentation reviews and field examination revealed twenty-one (21) HFA latching-type relays, seven in each of the three emergency diesel generator control cabinets.

The relays all have *the Model No. 12HFA54Hl87H.

All of these relays were checked in accordance with a special test procedure (T-233) written to address those criteria noted in the Actions Requested portion of the NRC Bulletin 88-03.

The results of the examinations of all the relays were found to be satisfactory~ The Procedure T-233 data sheets are available onsite for inspection, if requested.

Until alternatively designed relays are made available which remedy the problem noted in NRC Bulletin 88-03, spare GE HFA latching-type relays of the model noted above have been ordered for replacement-in-kind applications, if replacement should be necessary in the future.

These spare relays will be inspected in accordance with the criteria of NRC Bulletin 88-03 upon receipt.