Requests Relief from ASME Section XI Requirement to Use Form NIS-2 in Order to Use Natl Board Form NR-1 to Document Repairs & Replacements During Inservice Insp Program.Fee Paid
ML18093A982
Person / Time
Site: Salem, Hope Creek, 05000000
Issue date: 07/21/1988
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLR-N87232, NUDOCS 8808020054
Download: ML18093A982 (9)


Text

,*

Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4199 Vice President and Chief Nuclear Officer July 21, 1988 NLR-N87232 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

INSERVICE INSPECTION PROGRAM RELIEF REQUESTS AND ASME SECTION XI CODE CASE APPLICATIONS SALEM GENERATING STATION UNIT NOS. l AND 2 DOCKET NOS. 50-272 AND 50-311 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Recent Inservice Inspection (IS!) Program submittals for Salem Unit l and Hope Creek incorporate the requirements of the 1983 Edition of Section XI, Division l of the ASME Boiler and Pressure Vessel Code with addenda through the Summer 1983 Addenda. Under the 1983 Edition of ASME Section XI, the use of Form NIS-2 for repairs or replacements becomes mandatory. Additionally, those NIS-2 forms which are generated for the repair or replacement of ASME Code Class l and 2 pressure retaining components and their supports must be included in the inservice inspection summary report that must be filed within 90 days of completion of inservice inspections conducted during a refueling outage. The use of Form NIS-2 was not required under the earlier editions of ASME Section XI to which Salem and Hope Creek were previously committed.

Presently, PSE&G possesses a National Board of Boiler and Pressure Vessel Inspectors (National Board) "NR" Certificate of Authorization, which is required by New Jersey state law (New Jersey Administrative Code 12:90). In accordance with the National Board Inspection Code and New Jersey state requirements, all repairs and replacements performed under the NR Certificate of Authorization must be done under the provisions of ASME Section XI and must be documented on the National Board Form NR-1.

3808(~>:20054 88()721 PDR ADOCK 05000272 Q PDC i

Document Control .Desk 2 07-21-88 PSE&G requests relief from the Section XI requirement to use the NIS-2 form and proposes the use of National Board Form NR-1 to document repairs and replacements performed under the provisions of ASME Section XI. These NR-1 forms would be used in the generation of the inservice inspection summary reports. To generate both documents is essentially a duplication of effort, and creates the possibility of inconsistencies between two forms that would be describing the same repair/replacement. Both forms require the involvement and subsequently the signature of an Authorized Nuclear Inspector. Both forms require certification by the Owner, by signature, that work has met the requirements of the ASME Code. In addition, unlike Form NIS-2, a copy of Form NR-1 must be submitted upon completion to the National Board and to the State of New Jersey. Copies of the NR-1 and NIS-2 forms are attached for your review.

Related to this matter, PSE&G intends to employ ASME Section XI Code Case N-389 for Salem Unit 2. This NRC approved code case (see NRC Reg. Guide 1.147, Rev. 5, 8/86) permits repairs and replacements to be made to later Editions/Addenda of ASME Section XI than that specified in the Inservice Inspection Program. In accordance with NRC Regulatory Guide 1.147, PSE&G is providing formal notification to NRC, via this letter, of* our intention to use ASME Section XI Code Case N-389. In particular, with the exception of preservice inspection requirements, PSE&G will use the repair and replacement rules of the 1983 Edition of ASME Section XI through the Summer 1983 Addenda in its employment of N-389 for the Salem Unit 2 ISI Program. Preservice and inservice inspections will continue to meet the requirements of the 1974 Edition of ASME Section XI through Summer 1975 Addenda.

With NRC approval of the relief request noted above and the subsequent employment of ASME Section XI Code Case N-389 for Salem Unit 2, the Salem Unit 1, Salem Unit 2 and Hope Creek ISI programs will all use Form NR-1 in lieu of ASME Form NIS-2.

Additionally, PSE&G requests NRC approval for the use of ASME Section XI, Division 1 Code Cases N-448, "Qualification of VT-2 and VT-3 Visual Examination Personnel" and N-449, "Qualification of VT-4 Visual Examination Personnel" dated July 27, 1987 and Code Case N-356, "Certification Period for Level III NDE Personnel" dated July 16, 1982. Code Cases N-448 and N-449 indicate that personnel performing VT-2, VT-3 and VT-4 visual examinations may be qualified in accordance with ASME Section XI, Articles IWA-2300 (a) and (b) in lieu of IWA-2300 (c). Code Case N-356 indicates that the certification period for Level III NDE personnel may be extended to five years. PSE&G concurs with these assessments and believes that the use of these code cases would provide an acceptable level of quality and safety.

Document Control Desk 3 07-21-88 In accordance with the requirements of 10CFR170.21, a check in the amount of $150.00 is enclosed.

Should you have any questions regarding this transmittal, please do not hesitate to contact us. Your attention to these matters is appreciated.

Sincerely, Attachments C Mr. G. w. Rivenbark USNRC Licensing Project Manager - Hope Creek Mr. G. w. Meyer USNRC Senior Resident Inspector - Hope Creek Mr. D. C. Fischer USNRC Licensing Project Manager - Salem Mr. R. w. Borchardt USNRC Senior Resident Inspector - Salem Mr. W. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628

FORM NIS-2 OWNER'S REPORT FOR REPAms OR REPLACEMENTS As Required by the Provisions ot the ASME Code Section XI Sheet _ _ _ _ of_ _ _ _ _ _ _ _ _ _ _ __

Addrea

2. Plant. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Unit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Name Repair Organlutlon P.O. No., Job No., etc.

3. Work P11rfonned by _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Type Code Symbol Stamp _ _ _,,__ _ _ _ _ __

Ne me Addrea 4, Identification of System _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __..:

._ _ _ _ _ _ Code Case 5.

ASME Code Repaired, Stamped

. Nameof Nam11of Other Year Replaced, (Yes Component Manufacturar Identification Built or Replacement or Nol

7. Detcription of Work. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
8. Tests Conducted: Hydrostatic 0 Pneumatic 0 Nominal Operating Prassure 0 OtherO Pressure _ _ _ _ _ psi TestTemp. °F NOTE: Supplemental sheets in form of liru, sketches, or drawings may be used, provided (1 I size it 8% in. x 11 in., 121 informa-tion in items 1 through 6 on thit report is included on each sheet, and 131 each sheet is numbered and the number of sheets is recorded at the top of thit fonn.

This Form (E00030) may be obtained from the Order Oept.,ASME, 345 E. 47th St., New York:N.Y. 10017 .

FORM NIS-2 (Back}

We ce"ify that the statements made in the report are correct a conforms to the rules of the ASME Code,Section XI.

e National Board of Boiler end Pressure Vessel Inspectors and the State ployed by of

~i11Pll .--'l...- - - - - - - - - - - - h e v e inspected th* components described in this Owner's Report duri to 1111d state that to the best of my knowledge ind belief e Owner has performed examinations and taken corrective measures described in this Owner's Report in ac'.:cordance with t quirements of the ASME Code,Section XI.

By signing this ce"ificate neither the Inspector nor his employer makes anv werrantv, expressed or implied, concerning the examinations ind corrective mel!Sllres described in this Owner's Report. Furthermore, neither the Inspector nor his employer.

shall be liable in any manner for lll1V personlll injury or prop@r.y damage or 11 loss of eny kind arising from or connected with this inspection, Date_ _ _ _ _ _ _ _ _ _ _ _ _1,9._ _ __

FORM NR*1 REPORT OF RE~R c:J MODIFICATION ~ OR INSTALl&ION OF REPLACEMENT(S)

  • TO NUCLEAR C.PONENTS AND SYSTEMS IN NUCLE.WPOWER PLANTS
1. Work performed by------------------=~----------:----:----:--:~~-------

(name) (repair organization's P.O. no., job no., etc.)

(address)

2. Owner _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -=-:-=-:::-------------------------

(name)

(address)

3. Name, address and identitrcation of nuclear power plant - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4. Identification of system _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
5. a: Identification of component repaired, modified or replaced _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

b: Name of m a n u f a c t u r e r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

c: Identifying nos . _ _ _ _ _ _ _ _ _ - - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - -

(mfr:s serial no.) (Nat'I. Bd. no.) Uurisdictional no.) (other) (year built)

6. Applicable section(s) of ASME Code, 19_ _ edition, _ _ _ __ addend....__ _ _ __ Code Case._ _ _ _ __
7. Design responsibilities
8. Tests conducted: hydrostatic D pneumatic D design pressure D pressure,_ _ _ _ psi.
9. Description of work (use of additional sheet(s) or sketch(es) is acceptable if properly identified)
10. R e m a r k s = - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that all design, material and workmanship on t h i s - - - - - - - - - -

(repair, modification or replacement) conforms to the applicable section of the ASME Code.

Certificate of Authorization no. _____ to use the "NR" stamp expires,_ _ _ _ _ _ _ 19._ __

Signed _ _ _ _ _ _ _ _ _ _ _ __ - - - -

  • 19_ _

(repair organization) (authorized representative) (title) (date)

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by The National Board of Boiler and Pressure Vessel Inspectors, and certificate of com-petency issued by the state or province of and employed by_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ of have inspected the repair, modification or replacement described in this report on , 19_ _ and state that to the best of my knowledge and belief, this repair, modification or replacement has been made or constructed in accordance with Section XI and Section Ill of the ASME Code and the National Board rules as defined in the publications NB-65 and NB-102, current editions. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or im-plied, concerning the repair, modification or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner tor any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date _____ , 19__Signed_ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Commissions. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

(Authorized Inspector) (Nat'I. Bd. no. (including endorsements) state or province and number!

This form may be obtained from The National Board of Boiler and Pressure Vessel Inspectors, 1055 Crupper Ave., Columbus, OH 43229 NB-81 Rev. 4

FORM NIS-2 OWNER'S REPORT FOR REPAlnS OR REPLACEMENTS As Required by the Provisions ot the ASME Code Section XI Sheet _ _ _ _ of_ _ _ _ _ _ _ _ _ _ _ __

Addrea Unit _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

2. P l a n t * - - - - - - - - - - . , . , - - - - - - - - - - - -

Nam*

Repair Organl:retlon P.O. No., Job No., etc.

3. Work P1rfonned by _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Type Code Symbol Stemp _ _ _ _ _ _ _ _ __

Name Addrea

4. Identification of System _ _ _ _ _ _ _ _ _..;..._ _ _ _ _ _ _ _ _ __;

_ _ _ _ _ _Code Case s.

ASME Code Rep1ired, Stamped

. Nameof Name of Other Var Replaced, IYes Component Manufacturer Identification Built or Replacement or Nol

7. Description of Work _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
8. Tests Conducted: Hydrostatic 0 Pneumatic D Nominal O~rating Pressure 0 Other 0 Pressure _ _ _ _ _ psi Test Temp. 0 f

NOTE: Supplement.i sheets in form of lisu, sketches, or drawings may be used, provided 11Isizeis8~ in. x 11 in., (21 informa-tion in items 1 through 6 on this repon is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

This Form (E000301 may be obtained from the Order Dept., ASME, 345 E. 47th St., New York,'N.Y. 10017 .

FORM NIS-2 (Back)

Applicable Manufacturer's Oita Aeporu to be attached We certify that the statements made in the report are correct a conforms to the rules of the ASME Code,Section XI.

11 Nation1I Bo1rd of.Boiler and Preuure Vessel lruipectors mnd the State ployed by of

,.....~p..------------h- Inspected th* components described in this Owner's Report duri to the best of my knowledge ind belief e Owner has performed examinations and tll<en corrective measures described in this Owner's Report in accordance with t quirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any W1rt1nty, mxpressed or implied, concerning the examinations ind corrective measures described in this Owner's Report. Furthermore, neither the fospector nor his employer shall be liable in any m1nn1r for 111\' person.i injury or proper:y damage or a loss of any kind arising from or connected with this inspection.

Inspector'1 Signature Oat11_ _ _ _ _ _ _ _ _ _ _ _ _19_ _ __

~QRM NR-1 REPORT OF RE~R CJ MODIFICATION CJ OR INSTALl&ION OF REPLACEMENT(S) =

} .

  • TO NUCLEAR C.PONENTS AND SYSTEMS IN NUCLE9'POWER PLANTS
1. Work performed by------------------~=----------:----:-----:---:--,---------

(name> (repair organization's P.O. no., job no., etc.)

(address)

2. Owner _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _- : : - : - - : - : : - - - - - - - - - - - - - - - - - - - - - - - - _ . : _ -

(name)

(address)

3. Name, address and identifi'cation of nuclear power plant - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4. Identification of system _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
5. a: Identification of component repaired, modified or replaced, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

b: Nameofmanufacturer _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

c: Identifying nos . _________ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

(mfr. *s serial no.) (Nat' I. Bd. no.) Ourisdlctional no.) (other) (year built)

6. Applicable section(s),_ _ _ __ of ASME Code, 19_ _ edition, _ _ _ __ addend..__ _ _ __ Code Case_ _ _ _ __
7. Design responsibilities - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
8. Tests conducted: hydrostatic D pneumatic D design pressure D pressure._ _ _ _ psl.
9. Description of work _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

(use of additional sheet(s) or sketch(es) Is acceptable if properly identified)

10. R e m a r k s = - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that all design, material an_d workmanship on t h i s - - - - - - - - - -

(repair, modification or replacement) conforms to the applicable section of the ASME Code.

Certificate of Authorization no . _____ to use the "NA" stamp expires,_ _ _ _ _ _ _ 19,_ __

Signed _ _ _ _ _ _ _ _ _ _ _ _ __

- - - -

  • 19_ _

(repair organization) (authorized representative) (!Ille) (date)

CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by The National Board of Boiler and Pressure Vessel Inspectors, and certificate of com-petency issued by the state or province of and employed b Y * - - - - - - - - - - - - - - - - - - - -

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _of have inspected the repair, modification or replacement described in this report on , 19_ _and state that to the best of my knowledge and belief, this repair, modification or replacement has been made or constructed in accordance with Section XI and Section Ill of the ASME Code and the National Board rules as defined in the publications NB-65 and NB-102, current editions. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or im-plied, concerning the repair, modification or replacement described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date_____ , 19__Signed. _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Commissions. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-,---,--

(Authorized Inspector) (Nat'I. Bd. no. (including endorsements) state or province and number)

This form may be obtained from The National Board of Boller and Pressure Vessel Inspectors, 1055 Crupper Ave., Columbus, OH 43229 NB-81 Rev. 4