AVERAGE DAILY UNIT POWER LEVEL Completed by Pell White Docket No.

Unit Name Date Telephone Extension Month JUNE 1988 Day Aver age Daily Power (MWe-NET) 1 1051 2

1060 3

1107 4

1106 5

1067 6

1095 7

10 7 7 8

1101 9

10 93 10 1098 11 1089 12 1090 13 1087 14 1106 15 1087 i6 1032 Pg. 8.1-7 Rl 71 -*(")*-*,.-.

_
=:06::::0 8:30 b...,:tl;t*=:

F'(IR ADOCK 05000311 PDC R

Level Day Average Daily (MWe-NET) 17 84 3

-l 8 879 19 1060 20 1093 21 1072 22 457 23 0

24 214 25 10 25 26 1076 27 1074 28 1062 29 762 30 408 31 50-311 Salem II 2 July 10, 1988 "609-935-6000 4451 Power Level

e OPERATING DATA REPORT 50-311 July 10, 1988 935-6000 Completed by Pell White Docket No.

Date Telephone Extension 4451 Operating Status Unit Name Salem No. 2 Notes Reporting Period June 1988 Licensed Thermal Power (MWt) 3411 Nameplate Rating (Gross MWe) 1170 Design Electrical Rating (Net MWe) 1115 Maximum Dependable Capacity(Gross MWe)1149 Maximum Dependable Capacity (Net MWe) 1106

1.
2.
3.

4.

5

  • 6
  • 7.

8.

If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A

~~~~~~~~~~~~~~~~~~~~~~----~~~~~~~

9.

Power Level to Which Restricted, if any (Net MWe)

N/A

~~~'--~~~~~~~~

10. Reasons for Restrictions, if any N/A

~~~~~~~~~~~~~~~~~~~~~~

This Month Year to Date Cumulative

11. Hours in Reporting Period 720 4367 58872
12. No. of Hrs. Reactor was Critical 679.2 4244.7 36607.6
13. Reactor Reserve Shutdown Hrs.

0 0

0

14. Hours Generator On-Line 667.9 4199.1 35480.8
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2170375.2 14064007.2 59714528.2
17. Gross Elec. Energy Generated (MWH) 711750 4679310 36308780
18. Net Elec. Energy Generated (MWH) 680317 4487465 34506843
19. Unit Service Factor 92.7 96.2 60.3
20. Unit Availability Factor 92.7 96.2 60.3
21. Unit Capacity Factor (using MDC Net) 85.4 92.9 53.0
22. Unit Capacity Factor (using DER Net) 84.7 92.2 52.6
23. Unit Forced Outage Rate 7.2 3.8 28.6
24. Shutdowns scheduled over next 6 months (type, date and duration of each)

Refueling Outage scheduled for 9-2-88 and lasting for approximately 52 da s.

25. If shutdown at end of Report Period, Estimated Date of Startup:

N/A 8-1-7.R2

Completed by No.

Date 0129 6-16-88 0130 6-17-88 0131 6-17-88 0137 6-22-88 0147 6-29-88 0149 6-29-88 0150 6-30-88 1

F: Forced S: Scheduled UNIT SIIUTDOWN AND POWER REPORT MONTH JUNE 1988 Pell White Method of Duration Shutting License Type Hours Reason Down Event 1

2 Reactor Report F

3.1 A

5 F

8.8 A

5 F

8.0 A

5 F

48. 8 A

3 F

3.2 A

3 F

11. 4 A

5 F

16.5 A

5 2 Reason A-Equipment Failure-explain B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Exam F-Administrative G-Operational Error-explain H-Other-explain REDUCTIONS Docket No. 50-311 Unit Name Saiem No.2 Date Telephone 609-935-6000 Extension 4451 System Component Code 4 Code 5 EA EA EA EB HA RC RC 3 Method 1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Continuation of Previous Outage 5-Load Reduction 9-0ther Cause and Corrective Action to Prevent Recurrence 13KV Line Ho;ee Creek Feed Circulating Water Pumps 13KV Feed from Ho;ee Creek Circulating Water e Pumps 13KV Feed from Ho:ee Creek "C" Vital Bus Turb Control Shutdown EH 24 Gov VLV Nuclear Fue 1 Limits Neutron Flux Nuclear Fuel Limits Neutron Flux 4

5 Exhibit G Exhibit Instructions for Prepara-tion of Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)

Salem as e Source

WO NO 870902086 880111184 880310105 880505143 880602063 PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 UNIT EQUIPMENT IDENTIFICATION 2

  1. 1 CHEM WASTE PUMP FAILURE DESCRIPTION:

HAS A BLOWN SUCTION EXPANSION JOINT.

2 1SJ22 6 FAILURE DESCRIPTION:

IS LEAKING PAST ITS SEATS.

REPLACE VALVE.

2 11 CHARGING PUMP FAILURE DESCRIPTION:

INBD SEAL LEAKS. REPAIR SEAL.

2 1CV144 FAILURE DESCRIPTION:

VALVE PLUGGED.

UNCLOG VALVE.

2 11 BAT PUMP FAILURE DESCRIPTION:

MECH SEAL LEAKS.

REPLACE SEAL.

WO NO 880614091 880617084 880620079 880620118 910124007 SALEH UNIT 2 UNIT EQUIPMENT IDENTIFICATION 2

1R41C FAILURE DESCRIPTION:

MONITOR SPIKING.

INVESTIGATE AND REPAIR.

2 AIR REGULATOR FOR 1SV790 FAILURE DESCRIPTION:

LEAKING/REPLACE REGULATOR.

2 13 SWGR RM SUPPLY FAN FAILURE DESCRIPTION:

NO START INDICTION.

REWORK.

2 HEAT TRACE 213 FAILURE DESCRIPTION:

HEAT TRACE 213 IS ARCING.

lCV238 VALVE.

TROUBLESHOOT.

2 16 S.W. PUMP FAILURE DESCRIPTION:

PULL 16 SERVICE WTR. PUMP AND INSTALL REBUILT PUMP IAW M6L-2.


~

MAJOR PLANT MODIFICATIONS REPORT MONTH JUNE 1988

  • OCR NO.

PRINCIPAL SYSTEM 2SM-00119 Service Water Design Change Request DOCKET NO.:

50-311 UNIT NAME:

Salem 2 DATE:

July 10,1988 COMPLETED BY:

TELEPHONE:

J. Ronafalvy 609/339-4455 DESCRIPTION This modification replaced Valves 21 & 22 SW34 with Clow Duo check valves.

The original TRW Mission Duo check valves are no longer being manufactured.

The replacement valves are of identical design to the original valves.

MAJOR PLANT MODIFICATIONS

" REPORT MONTH -

JUNE 1988

DOCKET NO: 50-272 UNIT NAME:

=s-a~l_e_m__,2--~~~-

DATE:

July 10,1988 COMPLETED BY:J.Ronafalvy TELEPHONE:

( 609) 339-4455 2SM-00119 This design change replaced the original valves, manufactured by TRW, with valves of identical design, manufactured by Clow.

This modification did not alter any plant process or discharge or affect the environmental impact of the plant.

No unreviewed safety or environmental questions are involved.

DCR -

Design Change Request

SALEM UNIT NO. 2 SALEM GENERATING STATION MONTHLY OPERATING

SUMMARY

UNIT NO. 2 JUNE 1988 The Unit began the period operating at 100% power and continued to operate at full power until June 16 -

18, 1988, when load reductions were required to correct a "hot spot" in the temporary 13KV power feed from Hope Creek to Salem and to perform repairs to No. 23 West Intercept & Reheat Valves.

The Unit was restored to full power on June 19, 1988, and continued to operate at full power unit June 22, 1988, when a reactor Trip and Safety injection occurred due to the failure of No. 2C Vital Instrument Bus Inverter.

The repairs were completed and the Unit was restored to full power on June 25, 1988.

The Unit continued to operate at full power until June 29, 1988, when it was removed from service for approximately three hours to repair an electro-hydraulic control oil system leak on No. 24 Governor Valve.

Following the repairs the Unit ended the period in a power escalation.

The primary to secondary leak rate calculations for Nos. 22 and 24 Steam Generators continue to indicate less than five gallons per day per Steam Generator.

L P.EFUELING INFORMATION DOCKET NO.: 50-311 UNIT NAME: Salem 2 COMPLETED BY:

J. Ronafalvy DATE:

July 10, 1988 TELEPHONE: 609/935-6000 EXTENSION __

4_4_5~5---------------

Month JUNE 1988

1.

Refueling information has changed from last month:

YES NO X

2.

Scheduled date for next refueling:

September 3, 1988

3.

Scheduled date for restart following refueling: November 2,1988

4.

A)

B)

Will Technical Specification changes or other license amendments be required?

YES NO NOT DETERMINED TO DATE X

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO X

If no, when is it scheduled?

August, 1988

5.

Scheduled date(s) for submitting proposed licensing action:

August 1988 if required

6.

Important licensing considerations associated with refueling:

7.
8.
9.

NONE Number of Fuel Assemblies:

A)

Inc ore B)

In Spent Fuel Storage Present licensed spent fuel storage capacity:

Future spent fuel storage capacity:

Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:

8-l-7.R4 193 224 1170 1170 March 2003

1.1'

    • ~"

0 e

PS~G Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 July 13, 1988 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specification, the original copy of the monthly operating reports for the month of June 1988 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modification Operating Summary Refueling Information Sincerely yours,

~~9 J. M. Zupko, Jr.

General Manager -

Salem Operations RH:sl cc:

Mr. William T. Russell Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures 8-1-7.R4 The Energy People 95-2189 (11 M) 12-84