ML18093A697
| ML18093A697 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 02/26/1988 |
| From: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Miltenberger S Public Service Enterprise Group |
| Shared Package | |
| ML18093A698 | List: |
| References | |
| NUDOCS 8803040091 | |
| Download: ML18093A697 (2) | |
See also: IR 05000272/1988002
Text
Docket Nos.
50-272
50-311
Public Service Electric and Gas Company
ATTN:
Mr. Steven E. Miltenberger
Vice President - Nuclear
P. 0. Box 236
Hancocks Bridge, New Jersey 08038
Gentlemen:
Subject:
Combined Inspection 50-272/88-02 and 50-311/88-02
This refers to the special team inspection of the December 22, 1987 flooding
of Service Water Bay Number 1, led by Mr. E. Kelly of this office, on January
4-7, 1988, at the Salem Nuclear Generating Station, Hancocks Bridge, New
Jersey.
The scope and findings were preliminarily discussed with Mr. J. M.
Zupko, Jr. and yourself at an exit meeting held on January 7, *1988.
Areas examined during this inspection are described in the inspection report
which is enclosed with this letter and include the design adequacy of service
water system isolation valves, the root cause and safety significance of the
flooding event, and status of service water Bay Number 1 restoration.
Interviews of personnel were conducted, service water equipment examinations
were made, and selected procedures and records were reviewed including an
assessment of your independent investigation of the event.
No violations of
regulatory requirements were identified during the inspection.
The inspection team identified several additional areas detailed in Detail 2.3
of the enclosed report, that warrant your further consideration and action.
These items include development of more specific guidance for setting valve
limit stops, identification of allowable leakage criteria and performance of
leak testing for service water isolation valves.
We understand that you will
address these items in a special report to be submitted to the NRC following
the results of analyses performed on the service water 13SW20 valve which failed.
Your cooperation with us in this matter is appreciated.
Sincerely,
William F. Kane, Director
Division of Reactor Projects
Enclosure:
NRC Combined Report 50-272/88-02 and 50-311/88-02
OFFICIAL RECORD COPY
8803040091 880226
ADOCK 05000272
G
CIR SALEM 88-02 - 0001.0.0
02/24/88
/
(
/Yt-- 0 I
Public Service Electric and Gas Company
-2-
cc:
J.M. Zupko, Jr., General Manager - Salem Operations
L. A. Reiter, General Manager - Licensing and Regulation
B. A. Preston, Manager, Licensing and Regulation
C. P. Johnson, General Manager - Nuclear Quality Assurance
M. J. Wetterhahn, Esquire
R. Fryling, Esquire
J. Urban, General Manager Fuel Supply
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center
D. C. Fischer, NRR Licensing Project Manager
NRC Senior Resident Inspector
State of New Jersey
bee w/encl:
W. Lanning. NRR Events Assessment Branch
P. Swetland, DRP, Section Chief
K. Murphy, DRS, Section Chief
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
S. J. Collins, DRP
T. Murley, NRR
F. Miraglia, NRR
B. Boger, NRR
E. Jordan, AEOD
J. Taylor, DEDRO
S. Varga, NRR
B. Clayton, EDD
E. Wenzinger, DRP
D. Fischer, NRR
Team Members
4fli£.r ltl
Meyer/rhl
Swetland
21)-4188
2/~8
R'-~?
d-/i( t <<'i
C R SALEM
02/23/88
- ~~ ~ .. : ~-: ;*
.. *, -, .*
88-02 - 0002.0.0