ML18093A554

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp (ISI) Program Boundary Diagrams to Rev 0 to ISI Program for Second 10-yr Insp Interval.Requests Interim Approval of Program & Attendant Requests for Relief Be Granted within 30 Days of 880101.W/40 Oversize Drawings
ML18093A554
Person / Time
Site: Salem  
Issue date: 12/23/1987
From: Corbin McNeil
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18093A555 List:
References
NLR-N87236, NUDOCS 8801050354
Download: ML18093A554 (3)


Text

.. *

  • Public Service Electric and Gas Company Corbin A. McNeill, Jr.

Senior Vice President -

Nuclear Public Service Electric and Gas Company P.O. Box236, Hancocks Bridge, NJ 08038 609 339-4800 December 23, 1987 NLR-N87236 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

INSERVICE INSPECTION PROGRAM BOUNDARY DIAGRAMS SALEM GENERATING STATION UNIT.NO. 1 DOCKET NO. 50-272 Attached are four (4) copies of the Inservice Inspection (ISI)

Boundary Diagrams, Attachment 5.1, to the Salem Unit 1 !SI Program, Revision 0, for the Second Ten-Year Inspection Interval.

This attachment is part of Volume A of the Program.

This transmittal, together with our October 23, 1987 transmittal, completes our submittal of the Salem Unit 1 ISI Program, Revision O, for the Second Ten-Year Inspection Interval.

The beginning of the new ISI interval was originally scheduled to begin on December 5, 1987.

However, due to delays in the current Salem Unit 1 outage, the new ISI interval is now scheduled to commence on January 1, 1988.

PSE&G again requests that interim approval of the revised ISI program and attendant requests for relief be granted within (30) days of the commencement of the Second Ten-Year ISI Interval for Salem Unit 1.

Should you have any questions on this transmittal, please do not hesitate to contact us.

Your cooperation in this matter is appreciated.

Attachments Sincerely, f\\OL{I

\\ (L\\

Pr<.Awuv~> Tc; ReG. FILES PM (J)

-.r Document Control Desk 2

C Mr. D. c. Fischer USNRC Licensing Project Manager Mr. T. J. Kenny USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 12-23-87

ATTACHMENT 5-1 ISI BOUNDARY DIAGRAMS The following is the listing of diagrams used in the development of this plan and enclosed in this attachment.

ISI Boundary Diagrams are issued Revision 0.

Please note when a diagram number has more than 1 sheet associated with it, only those sheets pertaining to Unit 1 are included.

ISI Boundary Sheet Reference Title Diagrams P&ID 603201 A 1201 1,2,3 205201 Reactor Coolant 603202 A 1201 3

205202 Steam Generator Feed & Condensate 603203 A 1201 1,2 205203 Main, Reheat & Turbine By-Pass Steam 603216 A 1201 1,3 205216 Chilled Water 603217 A 1201 3

205217 Compressed Air 603222 A 1201 1

205222 Fire Protection 603225 A 1201 1,2 205225 Steam Generator Drains & Blowdown 603228 A 1201 1,2,3 205228 Chemical & Volume Control Operations 603231 A 1201 1,2,3 205231 Component Cooling 603232 A 1201 1,2 205232 Residual Heat Removal 603233 A 1201 205233 Spent Fuel Cooling 603234 A 1201 1,2,3,4 205234 Safety Injection 603235 A 1201 205235 Containment Spray 603236 A 1201 205236 Auxiliary Feedwater 603239 A 1201 3

205239 W~ste Disposal Liquid 603242 A 1201 1,2,3 205242 Service Water 4,5,6 603244 A 1201 1,2,3 205244 Sampling 603246 A 1201 1

205246 Demineralized Water - Restricted Area 603247 A 1201 1,3 205247 Control Air SALEM UNIT 1 -

LTP REV. 0 PAGE 5-1-1 I

~