Forwards Revised Safety Evaluation Per 871007 Commitments. Rev Includes nonsafety-related Associated Circuits & Confirmation of Breaker Coordination at 4 Kv Level.Overall Breaker Coordination Study Will Be Completed by 871231
ML18093A448
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/16/1987
From: Corbin McNeil
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18093A450 List:
References
NLR-N87196, NUDOCS 8710220141
Download: ML18093A448 (2)


Text

Public Service Electric and Gas Company Corbin A. McNeill, Jr.

Senior Vice President -

Nuclear,

  • Public Service Electric and Gas Company P.O. Box236, Han cocks Bridge, NJ 08038 609 339-4800 OCT 1 6 1987 NLR-N87196 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

10CFR50 APPENDIX R SAFETY EVALUATION SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272/50-311

0 c:o

....I 0

('")

~

i'<>

N

)>

Q 0

N

!, 'zy As a result of commitments made at PSE&G's meeting with NRC st'a'ff members at Region I on October 7, 1987, attached is a revision of the safety evaluation provided on October 3, 1987.

The revision includes non-safety related associated circuits in the evaluation and also include confirmation of breaker coordination at the 4 KV level for both onsite and offsite power sources.

Also, as committed to at that meeting, PSE&G will complete the overall breaker coordination study by December 31, 1987.

A schedule for modification resulting from that study will be provided to the NRC by January 29, 1988.

If coordination can be accomplished by an adjustment of setpoint or tap change, it will be implemented by April 1, 1988.

Should you have any questions, please feel free to contact us.

Sincerely, Attachment

,,,---a7102:ioi41 -071016 PDR ADOCK 05000272*

F

~DR c:

(./)

z

o

~""?

!.";:)

u)

Document Control Desk 2

C Mr. D. c. Fischer USNRC Licensing Project Manager Mr. T. J. Kenny USNRC Senior Resident Inspector Mr. W. T. Russell, Administrator USNRC Region I Mr. William F. Kane, Director Division of Reactor Projects USNRC Region I Mr. William V. Johnston, Deputy Director Division of Reactor Safety USNRC Region I Mr. Edward c. Wensinger, Chief Projects Branch No. 2 Division of Reactor Projects USNRC Reg ion I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 OCT 1 6 1997