ML18093A389

From kanterella
Jump to navigation Jump to search
Forwards Detailed Summary & Cost Estimate Rept for Contingency Emergency Telecommunications Equipment,Per NRC 870622 Request.Sketches of Antenna Configurations in Use at Artificial Island Encl
ML18093A389
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/21/1987
From: Corbin McNeil
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLR-N87179, NUDOCS 8709290077
Download: ML18093A389 (5)


Text

Public Service Electric and Gas LJc iJR' ;C.. -D" tfi Company

il~ \\.

., ~

Corbin A. McNeill, Jr.

Senior Vice President -

Nuclear Public Service Electric and Gas Company P.O. Box236, Ha1qi}~f.Wi~, NAJ8~E4dtg 339-4800

' "'!.1.

September 21, 1987 NLR-N87179 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

~ -~~

REQUEST FOR CONTINGENCY EMERGENCY TELECOMMUNICATIONS EQUIPMENT Public Service Electric and Gas Company (PSE&G) hereby submits a detailed summary and cost estimate report, in response to your letter dated June 22, 1987.

Various exhibits are included to better illustrate our antenna configurations, elevations, and frequencies currently in use at Artificial Island.

Should you have any questions concerning the above, please contact Craig L. Adams, Emergency Preparedness Manager, at (609) 339-4629.

Sincerely, Enclosure

  • Document Control Desk 2

C Mr. T. T. Martin, Director Division of Radiation Safety and Safeguards Region I Mr. w. T. Russell, Administrator Region I Mr. D. C. Fischer Licensing Project Manager Mr. T. J. Kenny Senior Resident Inspector Mr. G. w. Rivenbark USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. D. M. Scott, Chief (cover letter only)

Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 9-21-87

ANALYSIS

SUMMARY

AND COST ESTIMATE REPORT NUCLEAR TRAINING CENTER TOWER The current antenna configuration and frequency usage is provided on the attached Exhibit A.

AT&T dedicated service technicians will provide the control/audio cabling required between the NRC locker and the base of the tower. our current antenna contractor, Jack Healy, will install and mount the antenna and install coaxial cable.

Cabling cost: 2 AT&T techs x 8 hrs. x $60/hour Antenna Installation: 1 day @ $900/day

= $

= $

1,860 900 2,760 BIFC has recommended a Celwave Station Master PD-620 or PD-220 for this site.

MET TOWER The current antenna configuration and frequency usage is provided on the attached Exhibit B.

Antenna installation: 1 day @ $900/day

= $

900 BIFC has recommended a Celwave Station Master PD-620 or PD-220 for this site.

SALEM (TURBINE BUILDING)

The current antenna and frequency reference is noted at the bottom of Exhibit A.

Several locations at or near the elevator shaft are available.

Antenna installation: 1/2 to 1 day @ $900/day = $

900 BIFC has recommended a Celwave PD-1167 for this site.

SUMMARY

The total estimated PSE&G cost is $ 3,660.

PSE&G will provide procurement costs based on current supplier prices and procure the antennae if so desired by the NRC or BIFC.

We recommend that all antennae be permanently installed to eliminate the need for special insurance requirements, climbing during inclement weather, etc.

Questions concerning this summary report may be directed to Mr. Jeff Katz at (201) 430-7572.

{,

I

),.

..~

    • .. PUBLIC SERVICE ELECTRIC AND GAS COMPANY "FIL"'------*----

ESTIMATa:;;..........:.-----~

1,,,*

COMPUTATION SHEET

. ra*1 a

  • 1 f;L;iin F.=-

JSC\\37~

  • Fi=.1, sci.100

. 13~ *~'l. ::,?~.r F'4 :: IS I.~ Z"'°

.. ~.-

PREPARED BY 5:, Cot.o,J DATE ~/2z/s7 CHECKED ev _____ _

DAl"I!'------

t-)TSP. D:z::2.~c:r:co"'"'-

l'~T EL.. *a,, 4fS' F.: ;-4r', 9""

.f'T.! "'~ 96'.

~: '7'$-.6-:z..

.s~ ""'*""'

~: 'Y~7B' li:z:.fl. c..,.Fr //..... tsrlll'\\E.)

EL.. ~ 40 I t= :. I 2..S. OS'D /"\\JI r-

~'-1:."" lvR.itt~*'E :B'v.:r~1>:rtJG ELc.vt410~ *S',.u;~

Et.. 140 -0,.,E,l~nF,.Jf'J1'1:

SEcv;l.=>="tY F;.lf/t:lil.. {;,_,u:s fl1!i""T"F.Nt>lt!I F,-:::. ls8. 2..o~ Nllr f""z-= I~. 2S'1:> Plllf

~

'::: /S-6. 2/ 0

/11/li?

, l"IL~----------

ESTIMAT"---------

PUBLIC SERVICE ELECTRIC AND GAS COMPANY COMPUTATION SHEET e.... &.fl.,.

E'L.~ IS-4'

!ii*J QT AC. (~:r-F, s l.58.2.D.5'" 11 "*

t=°~=IS8.2SO f"f"~

S:.i' 1a&.Z.IO P1ti~

o:4 s ts:J_410MN~

ISO' LEVEL "J" BOX II. -

Srev~irY EL,:\\/oo' L F. =IS"* lr".J"'l\\ft Ii* IS,. ZS/>"

r.. ' r.J'6.J 1on*1 Sig0)--

ACCD-...

"J" BOX t

~ -

Si;.(!:)*-

A_C (J-Olwf'.*tNT __ --*-

J-l>V*

BASE LEVEL "J" BOX *4

\\. -- - \\ii *AC 0

'------() Si;.

~1RAll" J.\\llllf PREPARED BY S C.:::..oJ DA Tc;E__:S::;..'-'/;z.=-'z'-'/!'-'B._7-'--

.CHECKED BY-------

~*

', ;.' ~.

~.... *

. ';.