ML18093A193
| ML18093A193 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/24/1987 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18093A192 | List: |
| References | |
| NUDOCS 8707010374 | |
| Download: ML18093A193 (2) | |
Text
EMERGENCY CORE COOLING SYSTEMS REFUELING WATER STORAGE TANK LIMITING CONDITION FOR OPERATION 3.5.5 The refueling water storage tank (RWST) shall be OPERABLE with:
- a. A contained volume of between 364,000 and 400,000 of borated water.
- b. A boron concentration of between 2,300 and 2,500 ppm, and
- c. A minimum water temperature of 35°F.
APPLICABILITY:
MO DES 1, 2, 3 and 4.
ACTION:
With the refueling water storage tank inoperable, restore the tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STANIBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTIXlWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.5 The RWST shall be demonstrated OPERABLE:
- a.
At least once per 7 days by:
- 1. Verifying the water level in the tank, and
- 2.
Verifying the boron concentration of the water.
- b.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when the outside air temperature is < 35°F.
( a707010374 a?o62ir
- I. PDR ADOCK 05000272 p
PDR SALEM - UNIT 1 3/4 5-7
EMERGENCY CORE COOLING SYSTEMS REFUELING WATER STORAGE TANK LIMITING CONDITION FOR OPERATION 3.5.5 The refueling water storage tank (RWST) shall be OPERABLE with:
- a. A contained volume of between 364,000 and 400,000 of borated water.
- b.
A boron concentration of between 2,300 and 2,500 ppm, and
- c. A minimum water temperature of 35°F.
APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
With the refueling water storage tank inoperable, restore the tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT STAN[BY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTIXlWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.5.5 The RWST shall be demonstrated OPERABLE:
- a. At least once per 7 days by:
- 1. Verifying the water level in the tank, and
- 2. Verifying the boron concentration of the water.
- b.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when the outside air temperature is < 35°F.
SA LEM -
UN IT 2 3/4 5-9