PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- d. At least once per 18 months by:
- 1. Verifying that the pre*ssure *drop across the combined HEPA filters.
and charcoal adsorber banks is less than 4 inches Water Gauge while operating the system at a flow rate of 7410 cfm +/-.. 10%.
- 2. Verifying that on a safety injection test signal or control room area high radiation test signal, the system automatically actuates
. in the recirculation mode by closing off the outside air supply and diverting air flow through the HEPA filter and charcoal adsorber bank.
- 3. Verifying that the system maintains the control room at a positive pressure of greater than or equal to 1/8 inch W.G. relative to the \\
- outside atmospher~ during system operation with makeup air being supplied through the HEPA filters and charcoal adsorbers.
- e. After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to 99% of the DOP when they are tested in-place while operating the system at a flow rate of 7410 cfm + 10%.
- f. After each complete or partial r.eplacement of a charcoal adsorber bank by verifying that the charcoa*l adsorbers remove greater than or equal to 99% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place while operating the system at a fl ow rate of 7410 cfm +