Forwards Request for Info,Verifying Status of Completion of Actions Initiated at 830414 Meeting Re Restart Subsequent to 830222 & 25 Reactor Breaker Trip Problems at Unit 1
ML18087A863
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/20/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Uderitz R
Public Service Enterprise Group
References
NUDOCS 8304260077
Download: ML18087A863 (5)


Text

_\\

I \\\\

Docket Nos. 50-272 and 50-311 Mr. R. A. Uderitz Vice President - Nuclear Public Service Electric and Post Office Rox 236 Hancocks,Bridge, New Jersey Oear Mr. Uderitz:

~PR 2 0 1983 Gas Company 08038

-/

    • -DISTRIR!JTION Dockets HDenton NRC PDR ECase L PDR VNoonan NSIC Gl.ainas ORR#l Rdg RStarostecki, DEisenhut SVarqa
  • oELD JMTaylor ELJordan ACRS..:l 0 ORAB DFischer CParrish RVo l lmer RMattson HThompson On April 14, 1983 the NRC staff briefed the Commission on the status of Salem Units 1 and 2 relative to restart subsequent to the reactor trip breaker problems that had been experienced at Salem Unit 1 in Feburary 9 19B3.

Several actions were initiated as a result of this meetinq and -

associated recommendations that were made by your managenent consultants.

We are interested in verifying the status of completion of these vario11s activities Jor~S~glem.Units 1 and 2.

Pursuant to 1 O CFR 50. 54( f), we request that you provide the \\l.IRC by April 25~ 1983, answers to the questions in the enclosure to this letter.

This information should be submitted to the NRC, signed under oath and affirmationa to enable the Commission to determine whether or not the license should be modified, s~.ispended, or revoked.

Enclosure:

As stated cc w/enclosure:

See next page 8304260077 e3o420 PDR ADOCK 05000272 S

PDR TA/n[*

ORR#l :DL ORB#l :DL Sincerely,

~ si~~~~

OT i,girZ**

Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation OFFICE...................... ** ************************* ************************

JHannon: dm

  • DFi sch er SVarga F.:Ca"'-"'-.-..-.-,_

SURNAME.........................

DATE* **** ~:Y.1~.t.~~~.....

.... ~....t.... l.~}........... r.~L...t.~~--...... n~.... B;1.......Q.Y........ J....

R-I NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960

P~bli~ Service Electric and Gas Company cc:

Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, D. C.

20006 Richard Fryling, Jr., Esquire Assistant General Solicitor Public Servic~ Electric and Gas Company Mail Code TSE - P.O. Box 570 Newark, New Jersey 07101 Gene Fisher, Bureau of Chief Bureau of Radiation Protection 380 Scotch Road Trenton, New Jersey 08628

  • _Mr. R. L. Mittl, General Manager Nuclear Assurance and Regulation Public Service Electric and Gas Company Mail Code T16D - P-.0. Box 570 Newark, New Jersey 07101 Mr. Henry J. Midura,. Manager Salem Operations Public Service Electric and Company P. 0. Box E Hancocks Bridge, New Jersey Gas*
  • 08038 Leif J. Norrholm, Resident Inspector Salem Nuclear Generating Station U. S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, New Jersey 08038

--r~* f' Mr. Edwin A. Liden, Manager -

Nuclear Licensing Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038 Regional Administrator - Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Charles P. Johnson Assistant to Vice President - Nuclear Public Service Electric and Gas Company PoO. Box 570 80 Park Plaza - lSA Newark, New Jersey 07101 -~~

L.* ~

v' ENCLOSURE TO 10 CFR 50.54(f) LETTER PUBLIC SERVICE ELECTRIC AND GAS COMPANY

1.

As you may know, the NRC staff informed the Commission on April 13, 1'983, based on informati'on from your_ pl ant personnel, that both undervoltage attachments that fai~ed-o-n Salem Unit 1 on February 22 and 25 were in the possesston of Westinghouse on April 13.

Please verify whether that information is correct. ff not, please identify the current location of these failed attachments.

2.

Please advise us what maintenance, modfftcations or tests have been conducted since original purchase on the fai'led UV attachment that Westinghouse provided to Frankl i'n Institute, the NRC'-s contractor, subsequent to April 13,' 1983.

3.

Ohta in confi-rmation in writing from the reactor trip breaker vendor that the installed breakers are sattsfactory for plant operation and tha:t the Sa 1 em Ma i'rite:nance Procedure M3Q-2 wt 11 pro vi de the necessary basis to assure continuing operattonal re1~abi1fty.

4.

Obtain reports from the Statton_-Operattons ~evtew Committee and the Nuclear Review Board documenttrig-review--of sfiort-term aspects of trip breaker fatlures and concur-rens:e w-fth_ restart.

5.

Please explain why one would ~xpectto fi-nd dust and dirt in the breakers subsequent to _"the ma in"tert"ance-that was reportedly conducted in January 1983.

6.

Please describe your program for determfni'ng lffe cycle testing criteria including the breaker sampl tng techntque that wi*11 be employed.

Include a d'iscusston of how* the breaker testtng results will be used to develop a tri*p breaker replacement program.

7.

Please destribe those changes you have made or plan to make to ensure management is accountable for safe s-ftutdown of the Sal em facil Hies and will pursue an aggres:sive role in the_ s_afety of plant operation.

8.

Please provide the reactor trip 'data for each Salem Untt since January l, 1979.

Include all reactor trips, the initiation signal, and pre-trip power level.

9.

Please verify that the MEL now includes all items important to safety.

10.

Verify that the use of non-safety grade instrumentation to veri-fv the presence of a reactor trip demand signal will not degrade the safe opera~1on of the pl ant.

11. Please describe your basis for concluding that the additional 35 erroneously classified Work Orders that were found in your review had not adverse safety impact.
12.

Please identify any errors, omissions, or inaccuracies in the Draft Staff SER, Order, and Commission Briefing of. April 14, 1983.

13.

Verify that the detail listing of the history of the various locations of each of the 8 reactor trip breakers on Salem Units 1 and 2 is as stated in the NRC staff's evaluation as attached, and amend as necessary particularly filling in the entries noted by 11 ?u.

e ATTACHMENT 1 Unit 1 Unit 2 RTB A BYA RTB B BYB RTB A BYA RTB 8 BYB

1) 1979 original lTA lYA lTB lYB 2TA 2YA 2TB 2YB locations
2) 2/6/79 Unit 2 lTA lYA lTB lYB 2TA 2YA 2TB 2YB 2YB failure
3) 8/25/80 Unit 1 1TA lYA lTB lYB 2TA 2YA 2TB 2YB TOR on lYA or lYB
4) 5/5/S--l_ Uni i 4.

lTA lYA lTB lYB 2TA

_2YA 2TB 2YB 2YB dropped -

5) 8/20/82 Unit 2 lTA lYA lTB lYB 2TA
  • 2_TB *2YA 2Y8 2TB failed --

2YA

.4 fr) 1/6/83 Un1t Z. *2TA lYA lTB lYB

  • lTA 2TB 2YA
  • 2YB ::

. ZTA failed --

lTA I

7) 2/22./83 Unit 1 2TA lYA *lYB-
  • lTB lTA

-2TB 2YA zys*

lTB short. --

.:~..:.

lYB 0

- 8) 2/22/83.ATWS 2TA lYA lYB lTB _

lTA ZTB 2YA ZYB

9) 2/25/83 ATWS -
  • 1

?

?

?

?

?

?

?

RTBs swapped

10) 3/2/83

?

?

?

?

lTA

?

lYA

?

observations during tour -

Unit 1 Unit 2 RTB A SN 424Y7268B - lTA RTB A SN 1-24Y72698 - 2TA RTB B SN 224Y72688 - lTB RTB 8 SN 2-24Y7269B - 2TB BYS A SN 124Y7268B - lYA BYS.A SN A-24Y72698 = 2YA I

I BYB B SN 324Y72688 - lYB BYB 8 SN 3-24Y72698 - 2YB

. TOR -

Ti~e Delay Relay,

  • Indicate breaker 1ocation change.

---~---