ML18087A596
| ML18087A596 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 11/22/1982 |
| From: | Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18087A595 | List: |
| References | |
| NUDOCS 8211300253 | |
| Download: ML18087A596 (1) | |
Text
PLANT SYSTEMS 3/4. 7. 3 COMPONENT COOLING WA/ER SYSTEM
- LIMITING CONDITION FOR O~ERATION 3.7.3 At least two independent componerit cooling water loops shall be OPERABLE.
APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
With only one component cooling water loop OPERABLE, restore at least two loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.*
SURVEILLANCE REQUIREMENTS 4.7.3 At least two component cooling water loops shall be demonstrated OPERABLE:
- 2.
At least once per 31 days by verifying that each valve (manual, power operated or a 11tomat i c) servicing safety related equipment that is hot locked, seal~d, or otherwise secured in position, is in its correct position.
- The time for completion of repairs to the No. 22 Component Cooling Water Heat Exchanger shall be extended from 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> on November 23, 1982 to 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> on November 24, 1982.
If repairs are not completed by that time, the unit shall be placed in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SALEM - UNIT 2 3/4 7-12