ML18087A522
| ML18087A522 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 09/29/1982 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Uderitz R Public Service Enterprise Group |
| References | |
| NUDOCS 8210190047 | |
| Download: ML18087A522 (3) | |
Text
Docket Nos. 50-272 and 50-311 SEP 2 9 1982 Mr. Richard A.
Uderitz~ Vice President -
Nuclear Public Service Electric and Gas Co.
Mai *1 Code Tl 5A P.O. 570 Ne~'lo rk, New Jersey 07101
Dear Mr. Uderitz:
By letter dated February 2, 1982 Public Service Electric and Gas Company (PSEf,G) transrnitted for our commont a docwm:!nt entitl,~d "Safety Evaluation of the PSE8iG Rod Exchange Methodology."
In a letter dated l\\pril 9, 1982 ~*Je responded that our review of this document had progressed to the point that v.1e approved use of th{~ rod exch<'lnge methodology for the startur of Cycle 4 for Salen Unit 1 provided certain stated critf!ria \\-/t~re met.
He*also statt-~d that our re vi cvJ of the PSE~G rod excf1an9e mett1odo 1 ogy vmul d continue so that 1t1e could rr~ach a decision on the acceptance of the PSERG version of rod exchaw~e for future useo Our review of the PSE&G and other rn<~thodoloqies hi:!s been intensified since April, 1rnd on Piuqust 5, 1982 t'Je met vJi th the PSE."iG staff to discuss Vie results of this review.
Based on our understanding, we cannot approve the use of thA PSE&G rod exchange methodoloqy.
Our concern is not ~<Jith the ~;"!xperinental process itself but vJith the method hy which the results of the 1:ieasuremf:nts are conpared
\\llith predicted va 1 ves.
The rod exchange method does not make a direct comparison of a cal cu 1 at ion and a 1;ieasurernent.
\\tJe consider the~ primary purpose of the rod worth test as providing an audit point \\vhic11 compares a design calculation 1:Jith a rneasurer:1ent.
Our objection to the PSU:G methodology is the calculational content of the reactivity "measurement.
11 There are v;ays to make a direct crn*1parison of measurnment and prediction 1-1ith rod exchange.
He swi<Jest that PSE&G explore these possibilities and prepare a new submittal or return to the boron dilution method of rod worth measurements.
tfo conclude that the; PSE~G rod exci1an9e methodoloqy is not acceptable for use as the rod t*iorth measurer:1ents at the beginnin\\J of Cycle 5 for Salen Unit 1.
SURNAME>........................
DATE.************************
NRC FORM 316 (10-BO) NRCM 0240 OFFICIAL RECORD COPY USGPO. 1981-335-960
r
.1 ** -
SEP 2 9 1982 We have also reviewed the Cycle 4 startup report for Salem Unit 1.
Although the PSE&G rod exchange methodology was used for Cycle 4, ive conclude that the results of all the physics startup tests, as wel 1 as the criteria placed on the rod excha.nge methodology, provide assurance that tt1e actual Cycle 4 core loading and calculia,tions to rlesign.
cc:
- See next page DISTRIBUTION:
Docket File NRC PDR Local PDR ORB #1 Rdg.
D. Eisenhut J. Heltemes, AEOD K. Parrish tL Ross C. Berlinger D. Fieno M. Chatter"ton Si nee rely, Original signed by:
,s. A. Varga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing OFFICE *** QRB.. #.~..
SURNAME *** R9.~~!... ~........
ga_~/82 DATE.........................
NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
~,..
Mr. R. A. Uderitz Public Service Electric and Gas Company cc:
Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, D. c.
20006 Richard Fryling, Jr., Esquire Assistant General Solicitor Public Service Electric and Gas Company Mail Code TSE - P.O. Box 570 Newark, New Jersey 07101 Gene Fisher, Bureau of Chief Bureau of Radiation Protection 380 Scotch Road Trenton, New Jersey 08628 Mr. R. L. Mittl, *General Manager Corporate Quality Assurance Public Service Electric and Gas Company Mail Code T16D - P.O. Box 570 Newark, New Jersey 07101 Mr. Henry J. Midura, Manager Salem Operations Public Service Electric and Gas Company P. o. Box 168 Hancocks Bridge, New Jersey 08038 Salem Free Library 112 West Broadway Salem, New Jersey 08079 Leif J. Norrholm, Resident Inspector Salem Nuclear Generating Station U. S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, New Jersey 08038 Mr. Edwin A. Liden, Manager -
Nuclear Licensing Public Service Electric and Gas Company Mail Code Tl6D - P.O. Box 570 Newark, New Jersey 07101 Ronald C. Haynes Regional Adm{nistrator - Region I U. s. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania l9406
....