Forwards Revised Response to Generic Ltr 82-05,providing Status & Schedule for NUREG-0737 Items.Completion of Items II.B.3 Re post-accident Sampling & II.F.1 Re Main Steam Line Noble Gas & Iodine Monitoring Sys Delayed
ML18086B545
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/11/1982
From: Liden E
Public Service Enterprise Group
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.3.1, TASK-2.B.2, TASK-2.B.3, TASK-2.B.4, TASK-2.E.1.2, TASK-2.E.4.2, TASK-2.F.1, TASK-TM GL-82-05, GL-82-5, NUDOCS 8207080198
Download: ML18086B545 (4)


Text

i r

80 Park Plaza, Newark, NJ 07101 / 201 430-7000 MAILING ADDRESS/ PO. Box 570, Newark, NJ 07101 June 11, 1982 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing Gentlemen:

POST-TMI REQUIREMENTS (GENERIC LETTER NO. 82-05)

SUPPLEMENTAL RESPONSE SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Attached is a revised tabulation of NUREG 0737 items includ-ing actual or scheduled completion dates and remarks where appropriate.

This revision is necessitated by diffiqulties encountered in meeting three of the anticipated completion dates which appeared in our April 15, 1982, response to Generic Letter 82-05.

Completion of NUREG-0737 Item II.B.3, Post Accident Sam-pling, for Salem Unit No. 1 was originally delayed by the manufacturer's inability to provide several valves necessary to complete the installation before July 1, 1982.

The ven-dor now indicates that the valves cannot be shipped before August 15, 1982, at best.

Because of the delays being experienced in material deliv-ery, our proposed schedule for completion of the Post Acci-dent Sampling System has been revised until prior to startup following the fourth refueling outage.

Interim procedures are presently in use for reactor coolant and containment atmosphere post accident sampling and analysis.

These same procedures were approved by the NRC staff for interim use in Salem Unit No. 2 in SER* supplement 5, Section 22.2 (IIB.3).

The detail design of the Unit No. 1 Main Steam Line Noble Gas Effluent Monitoring System (NUREG-0737 Item II.F.1) has taken longer than originally anticipated.

The system design work, materials acquisition, and field installation are presently in various stages of completion.

As a result, our proposed schedule for completion of the installation of the system has been revised until prior to startup following the fourth refueling outage.

The Energy People 8207080198 820611 PDR ADOCK 05000272 p

PDR

//ovl 95-2001 (400M) 10-81

/.

i Dir. of Nuc. Reac. Reg. 6/11/82 Iodine and Particulate Effluent Sampling and Analysis Capa-bilities (~UREG-0737 Item II.F.1) for Unit No. 2 will be installed prior to startup following the first refueling outage as described in our License Change Request, LCR 82-10, dated May 28, 1982.

Should you have any questions in this regard, do not hesi-tate to contact us.

Sincer?}~;

7

J

/~~

E./A. Liden, Manager

~ticlear Licensing and Regulation

/

RB:cag Attachment CC:

Mr. w. J. Ross Licensing Project Manager Mr. Leif Norrholm Senior Resident Inspector

REV.ilitlD RESPONSE TO GENERIC LETTER 8~

NUREG 0737 ITEMS Item I.A.3.1 U~B.2 U.B.3

o:;.B.4.

Title Simulator Exams Plant Shielding Post-Acc;i.dent T:rain;j,ng for

  • ]1ttiga ting Co;re Damage II. E.1. 2 Aux. Feedwa,ter Tni tia ti.on* and *Flow 1---------;r;ndication T'I'.E.4~2
  • Conta;i:nm,ent I'solat;ton
  • Dependa,b:Ui ty\\

JI. F ~ l.

Accident 1-!on;i.toritig:

12-Noble Gas Effluent

'Monitors

a.

Plant 'Vent rt.

'Main SteaJll L;i;ne 2}_ Iodine and Particulate Effluent Sampling 3t H.i;gh_ 'R.ange Contain-

  • 'lllent *Ra,d~ation

'11on+/-.tor:lng 41-Conta;i:.nJllent Pressure

51. Con ta,;i:nll)en t Water Level' Unit ti 1

2 1

2 1

2 1

2 1

2 1

2 1

2 1

2

L 2

1 2

1 2

1 2

Actual/(Scheduled)

Completion Date December 81 December 81 March 25' 1982 Spet. 28, 1981 (4th refueling)

Clst refueling)

September 80 September 80 See Remarks See Remarks June 16, 1981 May 20, 1981 Ap;dl 30, 19.82 (1st ref.uel:i,ng)

(!+th refueling)

CLst '):'.'efuel:Lng)_

April 30, 1982 (1st refueling)

April JO, 19_83 Clst ;refue:L;i.ng)_

J1a'.(ch 24, 1982 Dec. 31, 1981 Dec. 29, 1980 May 12, 1981 Remarks/Correspondence First group of license candidates simulator examinations completed in December, 1981 Complete Complete This letter DPR-75, Amendment No.

Complete Complete These requirements were satisfied in our original plant design 4

Facility operating license change request for both units ***

DPR-70 Amendment No. 37 and original issue DPR.-75 Complete DPR-74, Amendment No. 4 This letter DPR~75, Amendment No. 4 Complete DPR-75, License Change Request LCR 82-10 Complete PPR-75, Amendment No. 4 Complete Complete Complete Complete

STATE OF NEW JERSEY SS:

COUNTY OF ESSEX COUNTY OF ESSEX RICHARD A. UDERITZ, being duly sworn according to law deposes and says:

I am a Vice President of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter dated June 11, 19.82, relating to NUREG 0737 item completion dates, are t;rue to the best o:E: my knowledge, information and belief.

Subscribed and sworn to before me this

  • 17 day of*~-, 19_82

'\\.

\\

~*,:,

',/ot0~~ 11!7~~

Notary Public of New Jersey My Commission expires on ~

'7,/ '7 fr-s-