ML18086B446

From kanterella
Jump to navigation Jump to search
Forwards Response to 820317 Generic Ltr 82-05 Post-TMI Requirements. NUREG-0737 Items I.A.3.1,II.B,II.B,4, II.E.1.2,II.E.4.2 & II.F.1 Implementation Schedule Encl
ML18086B446
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/15/1982
From: Liden E
Public Service Enterprise Group
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.3.1, TASK-2.B.2, TASK-2.B.3, TASK-2.B.4, TASK-2.E.1.2, TASK-2.E.4.2, TASK-2.F.1, TASK-TM GL-82-05, GL-82-5, NUDOCS 8204290345
Download: ML18086B446 (4)


Text

PS~G Public Service Electric and Gas Company 80 Park Plaza, Newark, NJ 07101 / 201 430-7000 MAILING ADDRESS/ P.O. Box 570, Newark, NJ 07101 April 15, 1982 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, MD 20014 Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing Gentlemen:

POST-TMI REQUIREMENTS (GENERIC LETTER NO. 82-05)

SALEM GENERATING STATION UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 In response to your March 17, 1982 letter to all Licensees of Operating Reactors, we have included the information requested in the attached tabulation.

For items that have not been completed, our letters which revised our completion dates are referenced in our tabulation.

Th~~e letters included our justification for proposed schedules, demonstrated a need for those proposed schedules and described interim compensatory measures.

Should you have any questions in this regard, do not hesitate to contact us.

CC Mr. w. J. Ross Licensing Projedt Manager Mr. Leif Norrh61m Senior Resident Inspedtor The Energy People 820429D3Y5 Sincerely,

/

/ I I

/E. A. Liden, Manager

/ Nuclear Licensing and I

Regulation 95*2001 (400M) 10-81

RESPONSE 'l'O GENERIC LETrER 82-05 NURF.G 0737 ITEMS Actual/(Scheduled)

Item Title Unit #

Cc.mpletion Date Remarks/Correspondence I.A. 3.1 Sllmllator Exams 1

December 81 First group of license 2

Decanber 81 candidates simulator examinations completed in December, 1981 II.B.2 Plant Shielding 1

3/25/82 Complete 2

9/28/81 Complete II.B.3 Post-llc:::cident 1

(7/1/82)

Liden to Varga letter 12/7/81 2

(1st refueling)

DPR-75, Anendment No. 4 II.B.4 Training for 1

September 80 Complete Mitigating Core 2

September 80 Complete Damage II.E.1.2 Aux. Feedwater 1

See Re.marks These requirements Initiation & Flow 2

See Re.marks

~e satisfied in our Indication original plant design II.E. 4. 2 Containment 1

6/16/81 Facility operating Isolation Dependa-2 5/20/81 license change request bility for lx>th uni ts ***

DPR-7 0 Airendrrent It>. 37 and original issue DPR-75 II.F.l Accident M:mitoring:

1) N:>ble Gas Effluent 1

(4/30/82)

Liden to Varga letter M:mitor 3/9/82

2) Iodine & Particulate 2

(1st refueling)

DPR-7 5 Amendrcent It>. 4 Effluent M:)nitor

3) H;igh range contain-rrent radiation non.

41 Conta:inment Pressure 1

3/24/82 Complete 2

12/31/81 Qraplete 5} Containment Water 1

12/29/80

. Qraplete level 2

5/12/81 Qraplete

Item II.F.l Title RESPONSE 'ID GENERIC IErl'ER 82-05 NUREG 07 37 ITEMS Unit #

Actual/(Scheduled) canpletion Date Accident M:mitoring (cont'd)

6)

Containment Hydrogen 1

2 4/7/82 6/4/80

  • ~,.

Page 2

_ Ranarks/Corresp:>ndence Complete - with environmentally qualified instrurrent 0-10 Volurce Percent Instrurcent range nodi-fication was accorrplished on date shown.

En-vironmental qualif ica-tion on installed instrurcent is not c6nplete.

An enviro:nrrentally qualified instrurcent will be installed at the first refueling outage or any outage of sufficient length to accorrplish the change

STATE OF NEW JERSEY SS:

COUNTY OF ESSEX COUNTY OF ESSEX RICHARD A. UDERITZ, being duly sworn according to law deposes and says:

I am a Vice President of Public Service Electric and Gas Company, and as such, I find the matters set forth in our letter, dated April 15, 1982 in response to Generic Letter No. 82-05, are true to the best of my knowledge, information and belief.

Subscribed and sworn to before me this \\Co,..k4 day of __._A......

P~R~l~L. __, 19 8 2

'*My Commission expires on Jersey RUDOLPH L. von FISCHER JR.

Notary Public of New Jersey

~)'Commission Expires Sept. 10, 191<<!