ML18086B059
| ML18086B059 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 11/09/1981 |
| From: | Novak T Office of Nuclear Reactor Regulation |
| To: | Schneider F Public Service Enterprise Group |
| References | |
| NUDOCS 8111240925 | |
| Download: ML18086B059 (2) | |
Text
- D"ISTRIBUTION Docket Docket No. 50-311 Mr. F. W. Schneider, Vice President Production Public Service Electric and Gas Company 80 Park Plaza 15A Newark, New Jersey 07101
Dear Mr. Schneider:
NRC PDR L PDR TERA NSIC ORB#l Rdg DEi sen hut JWetmore SVarga GMeyer CParrish IE-4 OELD GDeegan ACRS-10 Gray Fi le This confirms our telephone allthorization given today, No~1ember 9, 1981, for a change in Technical Specifications for the Salem Unit No. 2 facility as requested by your telecopy dated November 9, 19.81.
Facility Operating LicensG No. DPR-75 is amended on this date, November 9, 1981 by maMing the followi=.)1g Technical Specification change:
,l\\dd footnote to Technical Specification 3.5.2 to read:
The tine for completion of repairs to the No. 22 centrifugal charging pump shall be extended from 0527 hours0.0061 days <br />0.146 hours <br />8.713624e-4 weeks <br />2.005235e-4 months <br /> on November 10, 1981 to 0527 hours0.0061 days <br />0.146 hours <br />8.713624e-4 weeks <br />2.005235e-4 months <br /> on November 12, 1981. If repairs are not completed by that time, the unit shal1 be placed in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Add footnote to Technical Specification 4.5.2[~httor1~ad:,
After corni,letion of repairs to the No. 22 centrifugal charging pump on or about November 12, 1981 l> the pump sha 11 be tested pursuant to specification 4.0.5 and system perfonnance calculations be performed to verify that the pump characteristics are not significantly different.
Flow balance testing pursuant to specification 4.5.2.h shall be perfor\\ned the next time the unit is in COLD SHUTDOWN.
- \\
Copies of the 1 icense amendment, our evaJ1uation and Federal Register Notice,
for this Technical Specification change will be sent to you when completed.
Bfi 1240925 811109 1 PDR ADOCK 05000311 I P
PDR,
cc: See next page ORB#l:DL Sincerely, ORIGIN.AL SI*GNED Thomas M. Novak, Assist ant Di rector
- for OP,erating Reactors Division of Licensing OFFICE~ *****~**********.. ***
SURNAME~ *** ~.~~~
DATE *. J.J.19.. /..~.1.....
NRG FORM 318 (10-80) NRCM 0240 USGPO; 1981-335-960
Mr. F. W. Schneider Public Service Electric and Gas Company cc:
Mark J. Wetterhahn, Esquire Conner, Moore and Corber Suite 1050 1747 Pennsylvania Avenue, NW Washington, D. C.
20006 Richard Fryling, Jr., Esquire Assistant General Solicitor Public Service Electric and Gas Company 80 Park Pl ace Newark, New Jersey 07101 Gene Fisher, Bureau of Chief Bureau of Radiation Protection 380 Scotch Road Trenton, New Jers~~ 0.8628 _
Mr. R. L. Mi ttl, Ge.neral.Manager Licensing and Environment Public Service Electric and Gas Company 80 Park Plaza 17C Newark, New Jersey 07101 Mr; Henry J. Midura, Manager
- Salem Nuclear Generating Station Public Service Electric and Gas Company P. O. Box 168 Hancocks Bridge~ New Jersey 08038 Salem Free Library 112 West Broadway Salem, New Jersey 08079 Leif J. Norrholm, Resident Inspector Salem Nuclear Generating Station U. s. Nuclear Regulatory Commission Drawer I Hancocks Bridge, New Jersey 08038 John M. Zupko, Jr., Manager Nuclear Operations Support Public Service Electric and Gas Company 80 Park Plaza - 15A Newark, New Jersey
- 07101 Mr. R. A. Uderitz General Manager, Nuclear Production Public Service Electric and Gas Company 80 Park Plaza l5A t4ewark, New Jersey 07101 Mr. J. T. Boettger General Manager, Quality Assurance I&E Public Service Electric and Gas Company 80 Park Plaza Newark, New Jersey 07101 Mr. Edwin A. Liden, Manager Nuclear Licensing Licensing and Environmental Dept.
Public Service Electric and Gas Company 80 Park Plaza 160 Newark, New Jersey 07101