Forwards Request for Addl Info Re PWR Moderator Dilution. Proposed Hardware Mods Should Proceed Regardless of Eventual Outcome of Review.Response Requested in 45 Days
ML18086A903
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/18/1981
From: Varga S
Office of Nuclear Reactor Regulation
To: Schneider F
Public Service Enterprise Group
References
NUDOCS 8108270982
Download: ML18086A903 (3)


Text

Docket No. 50-272 Mr. F. H. Schneider, Vice President Production AUG 1 8 1981 Public Service Electric and Gas Company 80 Park Plaza l5A Newark, Ne\\'J Jersey 07101

Dear Mr. Schneider:

DISTRIBUTION Docket NRC PDR L PDR TERA NSIC ORB#l Rdg DEisenhut OELD IE-3 SVa rga GMeyer CParrish ACRS-10 JHeltemes, AEOD Gray File CNelson

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON PHR MODERATOR DILUifIQ~r:

By letters dated February 1, 1978 and April 2~ 1981, you provided, in response to our requests, information concerning the potentia1 for boron dilt:t~.on inci-dents at Salem Unit 1.

In particular, your April 2, 198'1 letter stated that Salem has adopted 11certain operating changes 11 to provide a greater margin of safety in the event of inadvertent dilution; and that Salem is protected against inadvertent dilution in the interim before 11final hardware fixes'" a:re introduced.

The staff is aware of the proposed hardware changes; however, it is our view that an independent evaluation of the Salem Unit 1 status should proceed regard-less of the eventual outcome of the review of these hardware changes.

In order to completa this evaluation, you are requested to provide the additional infor-mation specified in enclosure (1) within 45 days of receipt of this letter.

Enclosure:

Request for Apdi.tional Information cc \\*1/enclosure:

See next page Sincerely, Original signed b1:~

f

  • fl... VPT'~a Steven A. Varga, Chief Operating Reactors Branch #1 Dtiision of Licensing OFFICE *
        • QR~itl.~~..... Q.R6.#.1.:.D.L....... RR~!;.:..11)

SURNAME *

  • .** m1~;~r..:.. rJ~.. *****:*~*v-9.~............ B.R'/.d'f.~.;........,............................................

DATE. * *** 8/..... /.B.1...........QI, ** c:..J.81.......... 8/i. *.L.8.1.....................................................

NR9FORM318(10-80)NRCM0240 OFFICIAL RECORD COPY USGPO: 1961-335-960

f

!*Ir. F.

\\~. Schneider Public Service Electric and Gas Company cc:

Mark J. Wetterhahn, Esquire

~onner, Moore and Corber Suite 1050 1747 Pennsylvania Avenue, NW Washington, D. C.

20006 Richard Fryling, Jr., Esquire Assistant General Solicitor Public Service Electric and Gas Company 80 Park Place

~Jew ark, New Jersey 07101 Gene Fisher, Bureau of Chief Bureau of Radiation Protection 380 Scotch Road Trenton, t~ew Jersey. 0.8628..

M*r. R. L. Mittl, General Manager Licensing and Environment Public Ser.vice Electric and Gas Company 80 Park Plaza 17C t*lev1ark, l~e1>J Jersey 07101 t*'ir.. Henry J. Midura, Manager Salem Nuclear Generating Station Public Service Electric and Gas Coripany P. 0. Box 168 Hancocks Bridge,_ New Jersey 08038 Salem Free Library 112 West Broadway

Salem, t~ev1 Jersey 08079 Leif J. Norrholm, Resident Inspector Salem Nuclear Generating Station U. S. Nuclear Regulatory Commission Drav1er I Hancocks Bridge, New Jersey 08038
  • John M. Zupko, Jr., Manager Nuclear Qperations Support Public Service Electric and Gas Company 80 Park Plaza - 15A Newark, New Jersey "'07101 Mr. R. A. Uderitz General Man~ger, Nuclear Production Public Service Electric and Ge.s Company
  • 80 Park Plaza 15A t~ewa rk, tJew Jersey 07101 Mr. J. T. Boettger General Manager, Quality Assurance I&E Public Service Electric and Gas Company 80 Park Plaza Mewark, New Jersey 07101 Mr. Edwin A. Liden, Manager Nuclear Licensing Licensing and Environmental Dept.

Public Service Electric and Gas Company 80 Park Plaza. 160 t~ev;c. rk, liew Jersey 07101

~

  • l'--~

ENCLOSURE 1 Request for Additional Information on Inadvertent Boron Dilution at Salem Unit 1 Please provide the following information related to the potential for boron dilution at Salem Unit 1:

1.

A description of the Westinghouse-suggested operating changes adopted by the Salem station to provide a greater margin of safety in the event of inadvertent boron dilution; and

2.

An indication whether any potential incidents more limiting than the boron dilution incidents analyzed in the FSAR were revealed during the analysis conducted in accordance with our letter to F. P. Libruzzi on Boron Dilution Incidents, dated September 19, 1977.

If an analysis of

--the potential for and consequences of boron dilution incidents at Salem Unit 1 sufficient to provide the above informntion has not been under-taken, it should be conducted and the.information requested in our September 19, 1977 letter provided, if applicable.