Responds to NRC Re Violations Noted in IE Insp Repts 50-272/81-09 & 50-311/81-10.Corrective Actions: Personnel Reminded of Importance of Submitting Repts within Time Required by Tech Specs
ML18086A807
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/24/1981
From: Schneider F
Public Service Enterprise Group
To: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18086A806 List:
References
NUDOCS 8107230149
Download: ML18086A807 (4)


Text

I,'

r tP.,;d< W. Sohne;d~*

Vice President Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/430-7373 Production June 24, 1981 Mr. Boyce H. Grier, Director Off ice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Attention:

Mr. Richard R. Keimig, Chief, Projects Branch #2, Division of Resident and Project Inspection Gentlemen:

COMBINED NRC INSPECTION 50-272/81-09 AND 50-311/81--10 SALEM GENERATING STATION UNITS NOS. 1 AND 2 We have reviewed the report of your inspection conducted by Mr.

L. J. Norrholm during the period April 1-30, 1981.

Our response to the item of noncompliance identified in Appendix A is as follows:

Item of Vio'lation Facility Operating License DPR-70, Appendix A, Technical Speci-fications details the following requirement for event reports to the NRC:

6.9.1.9 The types of events listed below shall be the subject of written reports to the Director of the Regional Office within thirty days of occurrence of the event *** *

b.

Conditions leading to operation in a degraded mode permitted by a limiting condition for operation or plant shutdown required by a limiting.condition for operation.

In addition, 10 CFR 50.72 states, in part, "***(a)

Each licensee of a nuclear power reactor licensed under 50.21 or 50.22 shall notify the NRC Operations Center as soon as possible and in all cases within one hour by telephone of th:e occurrence of any of the following significant events and sh.all identify that event as 8107230149 810710 PDR ADOCK 05000272 i G

PDR

Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission 6/24/81 being reported pursuant to this section...

(7)

Any event resulting in manual or automatic actuation of Engineered Safety Features, including the Reactor Protection System."

Contrary to the above, the following reports were made to the NRC later than the *time specified:

__ -_R_e.... *p....;*o"""*r....;t_*_*_*_* __ : __

  • R.;.;;;:e_..*q....
u...;..:i""":r_;*e"""d..;.... _B_y._:_* ___

.

  • Evertt Date*

LER 81-30/03L LER 81-32/03L LER 81-34/03L Automatic plant trip 6.9.1.9 6.9.1.9 6.9.l.9 10 CFR 50.* 72 (al Reply to Item *of* v+/-*oTati"on 3-12-81 1-31-81 2.-10-81 (71 4-26-81 (2332 EDT}

Rep*ort Date 4-15-81 4-16-81 4-14-81 4-27-81 (approx. 0700 EDT)

A.

LER 81-30/03L was submitted late with an explanation for lateness.

When this lateness was discovered, the person responsible for presenting the LER to the Station Operations Review Committee was informed that SORC meetings can be called for at times other than normal weekly meetings and that in no case should an LER be late due to SORC meeting scheduling.

B.

As a result of the station activities during the thirty (.30) day allowed time frame, LER 81-32/03L was delayed in receiving the administrative reviews prior to transmittal to the Office of Inspection and Enforcement.

Also at the time the NRC Inspection Report which identified reportable items was issued, there was some confusion as to the reportability of each item in the LER due to the circumstances under which they were "discovered.

As a result, by the time they were written in a LER and the normal review* had been completed, th.e time *period had exceeded thirty (301 days.

The personnel responsible for generating the LER's have been informed of reportability requirements regardless of how the reportable item is identified.

C.

LER 81-34/03L was submitted late due.to investigations being conducted for the LER.

The LER was held back from issuance in an attempt to obtain the final results after completion

  • of the corrective* action.

This action was taken so that a supplerrierital LER would not have been necessary.

When it was *-

determined that the corrective actions could not be completed, the LER was issued and resulted in a late report.

Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission 6/24/81 D.

The Automatic Plant Trip was not reported within the one hour limitation due to personnel error by referring to the wrong reporting criteria as listed in the Emergency Plan Procedure EP Il, Notification of Unusual Event.

The personnel were instructed in proper classification of event types.

In all cases the appropriate personnel have been reminded of the importance of submitting information to the NRC within the required period of time and of maintaining compliance with Technical Specifications o.

We are in compliance now~

Sine~

CC Director, Office of Inspection and Enforcement

u. S. Nuclear Regulatory Comrniss*ion Washington, D.C.

20555

STATE OF NEW JERSEY

}

}

SS:

COUNTY OF ESSEX COUNTY OF ESSEX

)

FREDERICK W. SCHNEIDER, being duly sworn according to law deposes and says:

I am a Vice President of Public Service Electric and Gas Company, and as such, I find the matters set forth in our response dated June 24, 1981, to the NRC's combined inspection report 50-272/81-09

~ -'

and 50-311/81-10 are true to the best of my knowledge, information and belief.

Subsc~ibed a,nd sworn to bef o;r::e me *

  • J -rL r\\........

this~3u*

  • day* of~llc/X..Jt._;.,* *,. 19.81

()

Notary Public of New Jersey My Commission expires. on* * &c,,i-: -11

  • 19tf... :3 *