Forwards IE Insp Rept 50-311/80-15 on 800812-15.No Noncompliance Noted
ML18085A211
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/24/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Schneider F
Public Service Enterprise Group
Shared Package
ML18085A212 List:
References
NUDOCS 8011130054
Download: ML18085A211 (2)


See also: IR 05000311/1980015

Text

..

-*~.- .

'

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA 19406

Docket No. 50-311

SEP 24 ~

Public Service Electric and Gas Company

ATTN:

Mr. F. W. Schneider

,

Vice President - Production

80 Park Plaza - lSA

Newark, New Jersey 07101

Gentlemen:

Subject:

Inspection 50~311/80-15 .

-

L'l

-

_.

~.;,:--;

This refers to the routine inspection conducted b.y Mr. P. Clemons of this office

on August 12-15, 1980 at Hancocks Bridge, New Jersey of activities authorized by

NRC License No. DPR-75 and to the discussions of our findings held by Mr. Clemons

with Mr. Silverio and other members of your staff at the conclusion of the

inspection, and to a subsequent telephone discussion between Mr. Clemons and Mr.

Zupko on August 19, 1980.

Areas examined duri.ng this inspection are* described in the Office* of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection* cons*isted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within* the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's PubJic Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies- the document or part sought to be withheld,. and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Conmission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part. of the affidavit. If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

Public Service Electric

and Gas Company

2

SEP 2 4 1980

No reply to. this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely, :I~

Geor

rsmit;, Chief -

Fuel Facility and Materials Safety

Br nch

Enclosure: Office of Inspection and Enforcement Inspection

Report Number 50-311/80-~5

cc w/encl:

F. P. Librizzi, General Manager - Electric Production

L N. Schwalje, Manager - Quality Assurance

R. L. Mittl, General Manager - Licensing and Environment

H. J. Midura, Manager - Salem Generating Station

R. A. Uderitz,. Genera*l Manager - Fuel Supply Department