Monthly Operating Rept for Aug 1980
ML18082B187
Person / Time
Site: Salem 
Issue date: 09/10/1980
From: Miller L
Public Service Enterprise Group
To:
Shared Package
ML18082B186 List:
References
NUDOCS 8009180257
Download: ML18082B187 (5)


Text

M)NTI-J August 1980 DAY AVERAGE DAILY POWER LEVEL 1

2 3

4 5

6 7

a 9

10 11 12 13 14

15.

16 P

2 of 6

. g.

8.1-7.Rl (MWe-NET) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

AVERAGE DAILY UNIT POh1:R. LEVEL 50-311 OOCKET NO.

UNIT Salem #2 DATE September 10, 1980 COMPLETED BY L. K. Miller TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POhE LEVEL (M.WE-l"i'ET) 17 0

18 0

19 0

20 0

21 0

22 0

23 0

24 0

25 0

26 0

27 0

28 0

29 0

30 0

31 0

is e

OPERATIOO ~

REPORT OPERM'lN'.; STATUS

l. Unit Naue:

Salem #2 Notes:

2.

Reporting Period:

August 1980

3.

Licensed~ Power (Wit):

3411

4.

Nanepl.ate Rating (Gmss.t+E):

1162

s.

Design Electrical Rating (Net.t+E--)-

    • -.....,,1.... 1"'"1.... 5 ___ _
6. Max:imJm Dependable Capacity "(Gross KW!):

1149

7.

Maximr.ml Dependable Capacity (Net MWe) :

1104 e

50-311 rx:x:::KET NJ.: _________ _

CATE : September 10, 1980 CXM?LE'.l'ED BY:

L. K. Miller

~:

609-365-7000 X507

a. If Changes Occur in Capacity Ratings (Ite!!S Nutti:er 3 'lllrcugh 7) Since Last Report, Give Reason:

NONE

9.

Power Level To Which Pastricted, If Arr:/ (Net ?fie):

5% Thermal

10.

Reasons For Restrictions, If Aey:

Pending successful *completion of low power physics and natural.. circulation testing programs.

'!bis lblth Year to Date Ctmll.ati ve 744 3,240 3,240 ll. Hours In Reporting Period

12.

NUntier Of Hours Reactor Was Critical 268.2 268.2 268.2 l3.

Reactor Reserve. Shutcbm !burs 0

0 0

14.

Hours Generator On-Line.

0 0

0

15. Unit Reserve Shutdown Hours 0

0

16.

GJ:Oss 'llleJ:mal Energy Generated (!-fiH) 0 0

17.

GJ:Oss Electrical Energy Generated (mli) 0 0

0

18.

Net Electrical Energy Generated (M'IH) 0 0

0

19. Unit Service Factor 0

0 0

20. Unit Availahiljty Factor 0

0 0

21. Unit Capacity Factor (Using MOC Net) 0
o.

0

22. Unit Capacity Factor (Using DER Net) 0 0

0

23. Unit Forced Ol.ttage Rate 0

0 0

24.

Shutdowns Scheduled Over Next 6 Mcnths (Type, Date, and Duration of Each) :

25. If Shut Down At End of Report Period! Estimated Ila.te of Startup: ------------------
26.

Units In Test Status (Prior tc Camercial Operation) :

8-l-7.R2 Pg.3 of 6 INITIAL CRITICALITY INITIAL ~CI'IY

~

OPERATION Forecast 6/30/80 9/01/80 N/A Achieved

  • 8/02/8o N/A N/A

_ _J

NJ.

1 DATE F: Forced S:

Scheduled Page 4 of 6 B-1-7.Rl TYPE1 2

UNIT SllUTIXMNS l\\ND PCMER REOOcrIONS REPORI' MJlmI August 1980 ME.l'llOD OF OORATIOO

~

SllUITI~

(11.XJRS) ln'IN REAC'IOR

. Reason:

A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling trRegulatory Restriction LICENSE EVEN!'

REPORI' I E--Operator Training & License Examination F-J\\dministrative

~ational Error(Explain)

H-other (Explain)

SYSTEM CXMPOOENl' CODE4 CODES 3

Method:

1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Continuation of Previous Outage 5-Load Reduction 9-0ther 4

50-311 DOCKET NO.:~~~~~~~~~~

UNIT 'NAME:

Salem 112 DATE:

September 10' 198 0 COMPLETED BY: L. K. Miller

~~~~~~~~~~

TELEPHONE:

609-365-7000 X507 CAUSE 1\\ND CORRECI'IVE ACTION TO PREVENT RIDJRRENCE N/A Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREI}-0161) 5 Exhibit 1-Sane Source

-MAJdR PLANT MODIFICATI.

REPORT MONTH August l

~~~~~~~~~~~

  • DCR NO.

PRINCIPLE SYSTEM 2ET-0630 Leak Detection 2EC-0800 Lighting 2EC-0821 Structural 2EC-0957 Radiation Monitoring 2ET-0970 Inverters 2EC-0987 Control Air 2SC-0162 Waste Disposal

  • DESIGN CHANGE REQUEST 8-1-7.Rl Liquid System DOCKET NO.:

50-311 UNIT N.41l:

Salem t/2 DATE:

September 10, 1980 COMPLETED BY:

L. K. Miller TELEPHONE:

609-365-7000 X507 SUBJECT Data Required to Satisfy NRC Add Two Lights in Parking Let Add 4" cp Core Bore -

TGA Modify 2Rl8 Sampler Tubing Perform E-154 Test Add 1-1/2" Check Valve Resin Decant Filter Pg. 5 of 6

50-311 MAJOR PLANT MODIFICAT.S REPORT MONTH August 1980 DOCKET NO.:

UNIT ~:

DATE:

Salem 112 September 10, 1980

  • DCR NO.

2ET-0630 2EC-0800 2EC-0821 2EC-0957 2ET-0970 2EC-0987 2:SC-0162 COMPLETED BY:

L. K. Miller TELEPHONE:

609-365-7000 X507 10CFRS0. 5 9.

SAFETY EVALUATION The purpose of this DCR is the accumulation of data for the refinement of the Salem Leak Detectio_n Curves.

No change to any system or operating procedure is required.

This DCR does not impact any safety related system.

Data will be acquired from equipment already installed at Salem.

This DCR covers the addition of two lighting standards in the parking lot.

This DCR will not affect any safety function of the system involved.

The proposed changes do not involve any of the criteria associated with an unresolved safety question.

The addition of a 4" 0 Core Bare Hole in the north exterior stair.: of the T.G.A. will not require a change to the SAR or Technical Specifications and will not present an unreviewed safety question.

There is no change in the fire safety features of the station.

Change required to assure that radiation monitor: -performs as intended..

by design.

The function of the monitor.has not :*been.changed.

No safety analysis are affected.

No fire hazard is created - just adding process tubing to radiation sampler.

Penetration through fire barriers will be resealed to maintain fire protection requirements.

This procedure improves maintenance -- does not affect design.

The additional check valve and downstream piping will be Seismic Class I.

This new flow path will not permit flow from safety related header to non safety related.

This DCR does not present an unreviewed safety question and is in no way related uo any safety related system.

Its operability is not essential for the operation or shutdown of the plant.

Pa.ge 6 of 6

  • DES!GN CHANGE REQUEST