ML18082B185

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1980
ML18082B185
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/10/1980
From: Midura H
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML18082B186 List:
References
NUDOCS 8009180249
Download: ML18082B185 (1)


Text

e PS~G Public Service Electric and Gas Company P. 0. Box #168 Hancocks Bridge, New Jersey 08038 September 10, 1980 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month cf August 1980 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Sincerely yours, H. J. Midura Manager - Salem Generating Station LKM:vd cc: Mr. Boyce H. Grier Director of U.S. NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page 1 of *6 8-l-7.R4 95-2189 (5M) 10-79.