ML18082B163

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Plant Electric Distribution Sys.Details Re Capability of Plant to Operate W/One Power Transformer Out of Svc Needed to Complete NRC Review
ML18082B163
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/18/1980
From: Varga S
Office of Nuclear Reactor Regulation
To: Librizzi F
Public Service Enterprise Group
References
NUDOCS 8009150511
Download: ML18082B163 (5)


Text

AUG 1 -~ 1960 Docket No. 50-272 Mr. F. P. Librizzi, General Manager Electric Production Productinn Department Public Service Electric and Gas Company 80 Park Plaza, 15A Newark, New Jersey 07101

Dear Mr. Librizzi:

DISTRIBUTION Docket File 50-272 NRC PDR Local PDR TERA NSIC NRR Reading ORBl Reading D. Eisenhut T. Novak S. Varga W. Ross C. Parrish

~. Olshinski J. Heltemes I&E (3)

Attorney, OELD By letter dated March 3, 1980 to-Albert Schwen'.~er you provided the s~aff an analysis of the Salem Station Electric Distribution System.

In order for us to complete our review of this analysis we request that you provide additional information related to the capability of the plant to operate with one of the power transfonners out of service. This subject has been discussed with Mr. William Gailey of your staff relative to meeting Technical Specification 3.8.l.1 for Salem Unit 1.

I am enclosing with this letter a more detailed description of the information we seek.

W1:ll you please. provide a response within thirty (30) days of the receipt *of this letter.

Enclosure:

Request for Additional Information cc: W/enclosure See next page

  • See attached yellow NRC FORM 318 (9-76) NRCM 0240 Sincerely,

.Original s 1gn00-'b:yrg1

  • So A. Varga.

Steven A. Varga, Chief Operating Reactors Branch #1 Division of licensing

~

I I I I

--tru.s. GOVERNMENT PRINTING OFFICE: 1979-289-369

e*

Docket No. 50-272

\\ \\

Mr. F.\\R,. Librizzi, Genera1 Manager Electric'Production Product ion\\ Department Puhl ic Serv\\ce El ectv>fo and Gas Company.

80 Park Plaza, 15A Newar~, New J~rsey 07101

Dear Mr. libri~'i:

DISTRIBUTION Docket File 50-272 NRC PDR Local PDR TERA nSIC NRR Reading ORBl Reading D. Eis-enhut T. Novak S. Varga W. Ross C. Parrish J. Olshinski J. Heltemes I &E ( 3)

Attorney, /lELD

\\

I By 1 etter dated Ma~~h 3, 1980 to Al be rt Schwencer yoi.. ! provided the Sta ff an analysis of the Sa_l em Station Electric DiStribution System.

In order.

for us to complete out\\ review of this analysis _..,,~_,-request that you provide additional infch:mation related to the c~pabi.l.ity of the-plant

~o operate with one of the power transformers out of service. This s{Jbject has been discusseil.,with Mr. William Gailey of your staff relative to.meeting Technical Specif,~cation 3.8.1.1 for Salem Unit 1. I am*

enclosing with this letter a\\more detailed *description of the informa-tion we seek. Will you please\\provide a/~esponse within thirty (30) days of the receipt of this letter.

/

.. \\,

//

\\

.. /Sincerely,

- x

/

\\

"/ \\

,//

\\

/ /

Thomas M. Novak, Assistant Director

/.

fbr Operating Reactors

//

Divi*~,1on of Licensing

Enclosure:

/.

\\\\\\

Request for Additiqna1

  • Information

/

,/

cc: w/enclos_ure See n~.xt page

/

OFFICE~ ;}f:p~.:0.~~JJz?...... _:_.

SURNAME~.: W.JRpJ~........

DATE~.. Wff.P.!f3.Q.....

"I

\\

\\

NRC FORM 318 (9-76) NRCM 0240 INTING OFFICE: 1979-289-369

Ul\\ilTED STATES NUCLEAR REGULATo'RY COMMISSION WASHINGTON, D. C. 20555 Docket No. 50-272

~r. F. P. Librizzi, General Manager Electric Production Production Department August l 8, l 9 80 Public Service Electric and Gas Company 80 Park Plaza, 15A Newark, New Jersey 07101

Dear Mr. Librizzi:

By letter dated March 3, 1930 to Albert Schwenc2r you provided the staff a~ analysis of the Salem Station Electric Distribution System.

In order far us to complete our review of this analysis we request that you provide additional information related to the capability of the plant ta operate with one of the power transformers out of service.

This sutject has been discussed with Mr. William Gailey of your staff relative to meeting Technical Specification 3.8.l.1 for Salem Unit 1.

I am enclosing with this letter a more detailed description of the information we seek.

Will you please provide a response within thirty (30) days of t1e receipt of this letter.

Enclosure:

ReqJest for Additional

*~To r:-:ia : 1 on

>!/enclosure Se:: next page

~',r. F. P. L br i z z i Pub1ic Sen: ce Electric and Gas Co1:1pany _ 2 _

cc:

Mark J. Wetterhahn, Esquire Conner, Moore and Corber Suite 1050 1747 Pennsylvania Avenue, NW Washington, D. C.

20006 Richard Fryling, Jr., Esquire Assistant General Solicitor Public Service Electric and Gas Company 80 P2rk Place Nev1ark, New Jersey 07101 Gene Fisher, Bureau of Chief Bure2u of Radiation Protection 380 Scotch Road Trenton, New Jersey 08628 Mr. Hank Midura, Manager Salem Nuclear Generating Station Pub ii c Service Electric and Gc:s Company 80 Park Place Newark, Ne1*1 Jersey 07101 Mr. R. L. Mitti, General Mc.nager Licensing and Environrient Public Service Electric c.nd Gas Comany 80 Park Place Newark, Ne1-1 Jersey 107101 Salem Free Library 112 Wes~ Sroadway Salem, New Jersey 08079 Leif J. Norrhol~. Resident inspector Sale~ Nuclear Generating Station LJ. S. Nuclea;- Regu12tory (omission Drawer I Hcncocks Bridge, New jersey 03038 Nuclear Licensing Eng neer

)ub1ic Service ~lectr Corr;; c ny 30 Park ?lcce, Roa~ 7 26 Nev;ark::

j**~e\\*I Je~sey 0 l Oi August 18, 1980

~----

Enclosure DEGRADED GRID VOLTAGE ANALYSIS The Salem l FSAR indicates that the 13 kV ring bus can be closed with one of the two 500-13 kV transformers out of service and the other

.supplying both Salem Units land 2.

Additional information is required to show that a degraded voltage condition does not exist in this situation.

The NRC Staff requests that further analysis be performed for the above situation and during the time period stated in the Limiting Conditions for Operation in Salem 1 Technical Specification 3.8.-i.i. This analysis should include the following considerations:

l.

Assume the defined vmrst case, i.e., a trip of Unit LOCA at Unit 2 with minimum off-site grid voltage; and a

2.

Take credit for automatic load tap changes on a 500 13 kV transformer only during steady-state condition;

3.

Do not take credit for assumed manual load shedding;

4.

Assume the s'.:art of a la roe non-Cl ass IE motor and insure that the second level undervoltage relay does not drop out;

5.

Include systems below 480 vol'.:s into this analysis.