ML18082B032

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1980
ML18082B032
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/29/1980
From: Miller L
Public Service Enterprise Group
To:
Shared Package
ML18082B031 List:
References
NUDOCS 8009090320
Download: ML18082B032 (3)


Text

AVERAGE DAILY UNIT POWER. LEVEL MO NIH June 1980 DAY AVERAGE DAILY POWER LEVEL 1

2 3

4 5

6 7

8 9

10 11 12 13 14

15.

16 Pg. 2 of 4 8.1-7.RJ.

(MWe-NET) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

DOCKET NO.

50-311 UNIT Salem #2 DATE August 29, 1980 COMPLETED BY L. K. Miller TELEPHONc 609-365-7000 Ext. 507 DAY AVERAGE DAILY POWER LEVEL (M:WE-:NET) 17 0

18 0

19 0

20 0

21 0

22 0

23 0

24 0

25 0

26 0

27 0

28 0

29 0

30 0

31

e ClPE:RATlN; DATA REE'ORT OPERATJN:; STATUS

l. Unit Nane:

Salem f/2 Notes:

2.

Reporting Period:

June 1980

3. Licensed 'llleJ:Ital. PcMer (.!ofit) : __

_;3;..4,,,,1=1,_ ___ _

4.

Naneplate Rating (GJ:Css r+ie):

1162

5.

Design Electrical Rating (Net Ki!):

1115

6. Maxinun Dependable capacity '(Gross r+ie): 1149
7.

MaxiIIml Dependable capacity (Net r+ie) :

1104 r:x:x::KET N).:

50-311 CATE :

August 29. *1980 a:M'LE'IED BY:

L. K. Miller TE:IEPB:!lE:

609-365-7000 X507

8. If Changes Occur in Capacity Ratings (Itam NIJl!i:ler 3 Throu;h 7) Since Last Report, Give Reason:
9.

Power Level To Which Restricted, If Any (Net ?-fie):

5% Thermal

10.

Reasons Far Restrictions, If Any: Pending successful completion of low power physics and natural circulation testing programs.

'Ihi.s M:Jnth Year to Date Ct.m.llati ve

11.

Hours In Reporting Period 720 1752 1752

12.

Nlllli::1E!r Of Hours Reactor Was Critical 0

0 0

13. Reactcr Reserve Shutcbm a:iurs 0

0 0

14.

Hours Generator On-Line.

0 0

0 lS. Unit Reserve Shutd:Jwn Hours 0

0 0

16.

GJ:Css nJemaJ. F.nergy Generated (K-a) 0 0

0

17.

GJ:Css Electrical F.nergy Generated (MWH) 0 0

0

18.

Net Electrical Energy Generated(K-a) 0 0

0

19. Unit Service Factor 0

0 0

20.

Unit Availability Factor 0

0 0

21. Unit Capacity Factor {Using MOC Net) 0 0

0

22. Unit Capacity Factor {Using DER Net) 0 0

0

23. Unit Forced OIIt:aqe Rate 0

0 0

24.

Shutdowns Scbeduled Over Next 6 Mcnths {Type, Date, and Duration of Each) :

25. If Shut Down At End of Report Period! Estimated Date of Startup:------------------
26.

Units In Test Status (Prior to Comercial 'Operation):

'B-l-7.R2

  • ~* 3 of 4 INITIAL CRI'l'IOILITY INITIAL EUO'RICI'l"l

~

OPERATION Forecast 6/30/80 9/1/80 N/A Achieved N/A Nf A N/A

00.

1 DATE F: Forced s: Scheduled 4 of 4 Page 8-1-7.Rl TYPE1 2

UNIT Slll1HXJ'INS 1\\ND I'O'IBR RErix:rIONS REPORT MJNI'H June 1980 METIDD OF OORATIOO REMOr1 SHlJITI~

(IDJRS)

IXMN REAC'IDR Reason:

A-DJuiprent Failure(Explain) a-Maintenance or Test C-Refueling O-Regulator:y Restriction LICENSE EVEN!'

REPORT t E-q:>erator Training & License Examination F-Jldministrative G-q>erational Error (Explain) ff-other (Explain)

SYSTEM CIJ.fPCMNl' OJDE4 OJDES 3

M?thod:

1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Continuation of Previous Outage 5-Load Reduction 9-0ther 4

DOCKET NO.:

50-311

~~~~~~~--~

UNIT 1NAME:

Salem 112 DATE:

August 29, 1980 COM:~~::~o:::-~~~~g~~-;~6-~-=-~-~-~-~-X-5-0~7 CAUSE l\\ND OJRREX:TIVE ACTION 'ID PRE'VENI' RmJRRENCE 5

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1-Sane Source


~----------------------------__J