ML18082B032
| ML18082B032 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/29/1980 |
| From: | Miller L Public Service Enterprise Group |
| To: | |
| Shared Package | |
| ML18082B031 | List: |
| References | |
| NUDOCS 8009090320 | |
| Download: ML18082B032 (3) | |
Text
AVERAGE DAILY UNIT POWER. LEVEL MO NIH June 1980 DAY AVERAGE DAILY POWER LEVEL 1
2 3
4 5
6 7
8 9
10 11 12 13 14
- 15.
16 Pg. 2 of 4 8.1-7.RJ.
(MWe-NET) 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
DOCKET NO.
50-311 UNIT Salem #2 DATE August 29, 1980 COMPLETED BY L. K. Miller TELEPHONc 609-365-7000 Ext. 507 DAY AVERAGE DAILY POWER LEVEL (M:WE-:NET) 17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
31
e ClPE:RATlN; DATA REE'ORT OPERATJN:; STATUS
- l. Unit Nane:
Salem f/2 Notes:
- 2.
Reporting Period:
June 1980
- 3. Licensed 'llleJ:Ital. PcMer (.!ofit) : __
_;3;..4,,,,1=1,_ ___ _
- 4.
Naneplate Rating (GJ:Css r+ie):
1162
- 5.
Design Electrical Rating (Net Ki!):
1115
- 6. Maxinun Dependable capacity '(Gross r+ie): 1149
- 7.
MaxiIIml Dependable capacity (Net r+ie) :
1104 r:x:x::KET N).:
50-311 CATE :
August 29. *1980 a:M'LE'IED BY:
L. K. Miller TE:IEPB:!lE:
609-365-7000 X507
- 8. If Changes Occur in Capacity Ratings (Itam NIJl!i:ler 3 Throu;h 7) Since Last Report, Give Reason:
- 9.
Power Level To Which Restricted, If Any (Net ?-fie):
5% Thermal
- 10.
Reasons Far Restrictions, If Any: Pending successful completion of low power physics and natural circulation testing programs.
'Ihi.s M:Jnth Year to Date Ct.m.llati ve
- 11.
Hours In Reporting Period 720 1752 1752
- 12.
Nlllli::1E!r Of Hours Reactor Was Critical 0
0 0
- 13. Reactcr Reserve Shutcbm a:iurs 0
0 0
- 14.
Hours Generator On-Line.
0 0
0 lS. Unit Reserve Shutd:Jwn Hours 0
0 0
- 16.
GJ:Css nJemaJ. F.nergy Generated (K-a) 0 0
0
- 17.
GJ:Css Electrical F.nergy Generated (MWH) 0 0
0
- 18.
Net Electrical Energy Generated(K-a) 0 0
0
- 19. Unit Service Factor 0
0 0
- 20.
Unit Availability Factor 0
0 0
- 21. Unit Capacity Factor {Using MOC Net) 0 0
0
- 22. Unit Capacity Factor {Using DER Net) 0 0
0
- 23. Unit Forced OIIt:aqe Rate 0
0 0
- 24.
Shutdowns Scbeduled Over Next 6 Mcnths {Type, Date, and Duration of Each) :
- 25. If Shut Down At End of Report Period! Estimated Date of Startup:------------------
- 26.
Units In Test Status (Prior to Comercial 'Operation):
'B-l-7.R2
- ~* 3 of 4 INITIAL CRI'l'IOILITY INITIAL EUO'RICI'l"l
~
OPERATION Forecast 6/30/80 9/1/80 N/A Achieved N/A Nf A N/A
- 00.
1 DATE F: Forced s: Scheduled 4 of 4 Page 8-1-7.Rl TYPE1 2
UNIT Slll1HXJ'INS 1\\ND I'O'IBR RErix:rIONS REPORT MJNI'H June 1980 METIDD OF OORATIOO REMOr1 SHlJITI~
(IDJRS)
IXMN REAC'IDR Reason:
A-DJuiprent Failure(Explain) a-Maintenance or Test C-Refueling O-Regulator:y Restriction LICENSE EVEN!'
REPORT t E-q:>erator Training & License Examination F-Jldministrative G-q>erational Error (Explain) ff-other (Explain)
SYSTEM CIJ.fPCMNl' OJDE4 OJDES 3
M?thod:
1-Manual 2-Manual Scram.
3-Automatic Scram.
4-Continuation of Previous Outage 5-Load Reduction 9-0ther 4
DOCKET NO.:
50-311
~~~~~~~--~
UNIT 1NAME:
Salem 112 DATE:
August 29, 1980 COM:~~::~o:::-~~~~g~~-;~6-~-=-~-~-~-~-X-5-0~7 CAUSE l\\ND OJRREX:TIVE ACTION 'ID PRE'VENI' RmJRRENCE 5
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1-Sane Source
~----------------------------__J