Frederick W. Schneider Vice President Public Service Electric and Gas Company SO Park Place Newark, N.J. 07101 201/430-7373 Production Mr *. Boyce H *. Grier, 'Director U.S *. Nucl.ear Regulatory Commission Off ice of Inspection & Enforcement Region l 631. Park Avenue.

King of Prussia, Pennsylvania 19406

Dear Mr. Grier :

NRC IE BULLETIN 79-17, REVISION 1 NO. l UNIT SALEM GENERATING-STATION.

December 27, 1979 In response to NRC IE Bulletin-79-17, Revision l, dated: October 29, 1979,.the. following information is-submitted for your review as-a supplemental response to NRC IE Bulletin 79-17:-

A review of safety-related stainless steel piping systems to identify systems and portions-of systems. which contain stagnant oxygenated*

borated water* has been completed.

This review was based on the definition of stagnant oxygenated borated _water systems as g.iven in Section 1 o:E IE Bulletin 79-17, Revision l.

The results of this review have slightly increased the inspection and surveillance-requirements of NRC IE Circular 76-06,..

The:* current re-view addressed the followil'lg s.ystems::

lJ Residual Heat Removal 2J Safety Injection.

3)

Containment Spray

4)

Chemical and Volume Control

5)

Spent Fuel. Cooling All safety-related portions of. the Spent Fuel Cooling System are now continuously circulated and therefore we eliminated it.from the scope of Circular 76-06 and Bulletin 79-1.7, Revision 1. _

In accordance with the requirements defined in Circular 76-06, a pro-

- gram was established to definethe surveillance required at Salem to assure the integrity. of piping exposed to stagnant borated water *.

A copy of this program and the first sixty-day report required by Circular 76-06 were submitted to the NRC by the General Manager -

Electric Production letter of January 26, _1978.

The program and inspection requirements current r.eview of pertinent.systems. -

--r will be updated, based on the 502.

r'*-+

  • ~.

.e Mro Boyce H. Grier

.-*2 -

12... 27-79 In response to Section l(a):

~.r.

ll

  • Hydrotesting - Hydrotesting is not scheduled to be conducted until the Third. Inservice Inspection period (1985-1987).. -

\\.

2)
  • Service* Pressure Visual Leak Examinations have be~n conducted as. f o-Ilows:

a):

Safety Injection System (Nuqlear Class 3) -

June 1978 o b)

Charging and Volume* Con'trol, Part 1 (Nuclear Class* 2)

~*

-January 1979*.

c)

Residual. Heat Removal (Nuclear Class 2.) -

September 197 9.

d}

-Chemical and Volume* Control, Parts; 2 and 3 (Nuclear.

Class 2*)... -

November 197"9'.

3 )-

. Service Pressure Visual-Leak Examinations scheduled are* as follows:

af Safety Injection (Nuclear Class 3) -

June 1980*.*,

b)

_Containment Spray (Nuclear Class 2 and** 3.) - June '198"0.

4)

. Volgmetric (UT). Examinations: of welds have been conducted as.

follows:

  • 0

. Fifty-six circumferential J?ipe welds were* examined in the*

Residual Heat Removal, Safety Injection and Chemical: and Volume Control Systems during an outage in 1977.

Fifteen circumfer-

  • ential pipe welds; were examined in. these systems during the* 1979 Refueling.. outage..

The Ultrasonic* Examinations were conducted* by Southwest

.Research Institute during both outages*.

The procedures and qualifications were* in compliance with the* requirements of Section XI,.ASME Coder.1974 Edition, Summer 1975 Addenda..

The* procedures and' qualifications are_' filed in. the PSI and IS'I Plans.

The* !SI.Examination (sampling) Plan is in accord-ance* with.the* same* 1974 Code as is the acceptance criteria.

Data sheets of all seventy~one welds.examined. to date revealed no recordable or reportable. indica*tions, and none of the welds required-corrective actions;

  • In response to* Section 1 (b).:

Periodiq samples are obtained from the stagnant. lines of systems iden-tified by the-requirements. of this*Bulle:tin.

The samples are.analyzed for chloride content 'only.

Our response to IE Cir.cular 76-06 included

  • Mr. Boyce-H.* Grier 12-27-79 the sampling_ and analysis for dissolved oxygen also.

However, those portions of systems affected by Circular 76-06 and Bulletin 79-17

/

are all supplied by oxygen saturated water with high boron concentra-tions.

Accurate oxygen analysis under.these.conditions. is.very diffi-cult and the analysis has very little value.

Therefore, we have elected to. maintain control over the stress-corro'sion cracking pro-pensity in stagnant lines through a program of *chloride analysis of contained fluids,. periodic flushing., and ongoing inspection.. Sample schedules, chemistry specifications, and* corrective action to.be taken have been included in the station Chemistry Procedureso Analysis~ data sheets are included as Attachment l *.

In response ~o S~cti~n l(c~:

Preservice Inspection (PSI) NDE for Salem Unit No. i was conducted between August 1975 and-August 1 1916.

The ex~inations were conducted.

and results were accepted. in accordance with the criteria:established.

. in.section. XI,* ASME Code, 1971 Edition, Winter 1972* Addenda..

Hydro-testing. of systems and visual leak examinations. were conducted in. ac-cordance :with USAS. B31. 7 (Nuclear Power Piping) *.

. ing safety-related systems that contain. fluids of: interest were in-cluded' in the PSI Examinations.when and to the extent they.were :i;-e-quired,.by the Code:

lL

.. 2).

. *. 3) 41 Residual Heat Removal Safety Injection Co-ntainment. Spray Chemical *and: Volume Control-In: response to* Section l(d)::

System. inspections' and weld examinations: to date reveal no instance

  • of cracking in identified. systems.

In response to Section 2:

Since !SI Examina,tions: have been performed on stagnant portions. of -

systemsr pr.eviously identified,, in*spection* has been. done* in accordance with the. original: Bulletin and the requirements' of Section.2* of this Revision are also* satisfied *.

If' you* require addition.al inforination*,. we: wil-1 be* pleased to discuss,

it with* you *.

Sincerely,

\\

-/!)~

CC:

Office. of Inspection & Enforcement Division of Reactor Operations Inspection Washington, D.C. 20555 Off ice of Nuclear Reactor Regulation Division of operat~g Rea~tors.

Washi~gton,.D.C. 20555' Mr. L.J. Norrholm Hancocks Bridge, N.J.

October 25, 1979

'.ro:

S. LaB:u.~a - I S r Ccor:ina~cr SU3JECT:

3rd suiCle Pcints Chlo:ide, P7M RWS'I'-1 *.***.*.****** *- ***.**** *- ***. *-

lCS o l llr.HR l2P.EA l?.Eil lE55 l:i:?.E70 lP~SS

  • ****,,. ** * * * ** *
  • e * **., * * *--
  • e* e* **
  • e>* *
                    • ~***********~*
                                              • ~

.............. ** **~***... **.

              • ~***********~****

ll Sa!ety Injectie:i P~-:tp ******

12 Sa!ety !nj ection Pu:r.p ******.

lSJ905. *-.....

  • ~. **...... ** **....

lSJ'90i.*.*.**.*****.*.*.*.*.*.*.*.******. *-**

lSJl7~ ************~***********

1SJ29i ** **..

Boren Acid Injection '!'ar.;:-t..... **

llSJ!~i **....... **....... ** *. **.. ***** *... **.

l2S.Jl~-.;*....................................

l~.Ac*c~i.:l~ -:.c::..........................

12 13 Acc=:ulat::=

Acct:.::ula":o=.. **....... **... *"'.......

    • ~*-**~**~*-***

l-'* ;._cc~~la~c= **.*.* *-* **..*.*.*.**.**.*.

l.1 :Ec=ic:: AciC. Storage '!a::~c ****

12 ~c=ic* AciC.. Stc:::ac:e ':'a:ik ****

~c-~c *-i*~ B-*c~~~-

"~n~

~'-

~

c:.... **-**'::

.:...........,,.., **- ei **. **.

Boric Acid Blene~r ~****~***~**

l~""l 6.3; ** ***** *** **' ***. ** **.*,. ~-.l.... **. **... -~.,

is.:22.;:

1S,j2!.9*

lS.J2l7

... **...... ** *~*., *. *** **. ~* g.,, o. &'" e--......., ** 8*

  • is*Jl4-9:~ *. *: *.*.**.**,..............., ***,..........

11 C2':.ar!ii:ig* P1=? *.******.**.*.****

12. Char;in;-* r'.::.p..................

ll. Co::. 'tair:..en t Sprai Pl=."; *.****

l2 Cont~in::-:e::t Sp=ay P\\;..~.p ***.**

<o.,os Empty

<0.. 0S

<a.as

<o.. os

<a.as

<o.os

<a.os

<o.o5

<0 *. 05

<o.os

<o.as

<o.. as

<o.. os

<a.as

<a.as

<a.os No Flow No Flow No Flow No Flow

<o*. os

<0.05 a.as

<0.05

<0.0S

<o.* os

<o.os Empty

<O.as

<O*.os

<a.os 3.55

0. I.8

~x1~

£:~*:.:= !'s====-=::a~=e S\\!::e:-J"isc=

E?,' ::-.~~:.=-=-=::*

1

To:** s. LaBruna -

C S *:c Coordinator t

-~-

\\

_$LC.O}I..,p __

! QUARTER* OF 19 7 9

  • SUBJECT; I. S I SAMPLE' RESULTS** FOR THE RloiST-l:..**.**.* **. ** * ** *.**. ** *.* ** *........... <*o..... o s*

lCS61.

llP..BF.

  • 12.RBR lRH71 l:RBG5
  • 1Z~H70 lRHSS
  • ..., **.*.**. **- *.***.** ~.. *- *.*..****.*. Empty*
            • ~******~****~*****<0.05
    • ~********~*************<o.os

~-.*. *- ** ** *

    • *-., 9 *.,..... < 0 ** 0 5
    • *- * *., **-., < o**t).o s*

'Ill.. ** *-..... **-.

.. <o. os:

  • - ** ** **. 9 ***** ** ***.** **.*.*.. *- *~ <o.* os ll s a.-.f.ety Ir.jectic:i ?*.un:p ***.**,
  • 12 Safety !nje.ctioo. 1W11p.*.***.**

!SJS O.s* *.*, *: *. -,.- *~........... : **,.......... *-*** **,.-.

0.125 o*.125 0.* 10*

a.*. 05 1SJ90i lSJl 79:

lS-J297

  • -... *** ****..... *~ **...........
  • . *. *,........... *................. **: **.*.*. < O". 0 s*
      • -*-* *.*,. ~ *.****. _

.............,.'" *.*.*.*.,<o.... os~

3ora:r_ Acid Inj6:cticn. '!'ank * *. * *

  • o *. 13*

11SJ147 *..,, * ** **-.,..\\-*< *.*. * *-......,...... ~....... <.o~* *. os.

!ZSll41* *.*..,......................... -*..***..*.*. *- <o* *. os, 11 Ac.cuQ\\ulatoc..*.***.**.****,...* Out of 12 A.c:cu.mu1.af.or................,....* Out of 13 14 ll Ac:c:tun'l:l1a.-tc:r...............,,........... Out of*

l\\ccumula.t.er.......................... Out of*

Boric ~.:!.<:: S~or.a((e Tank *.*.** <0.05 12 12oric: A~:.4 Storaga Tank * **** <O. 05 Boric:* ;..ei~ :a*a t:hin;- T:J.nk.......... ; <*a._o.s'. -

Soric Aci~ Blender ~****~~--~~~<G.05-

.ts,,:i*~+

1'..... ** ** *

    • ** e, *o... ** ** 9 *c...... * ** t>*.., **
  • t-*

ts*I* 2.1.9; *. *. *. * *..,.,............ *:-...............,.*

f..... *-* *~ **

l.S*TZ1 z* *.*, *. *.*...*.**.*...,..,......................... "" *..,

Q'..06.

0.05 0.05 a~.ro lS.J'l4~.,. ~- *.*, _... *. * *., *.*.* "" *; *. *. *. *.. *-- *. * * *. *. Empty*

tl. Charvtn-; Pump......................

12.. Char9in; ~ll.Jlf...............,.... **

  • ll Cantainment Spray 12 Ccr.tainme~t Spxay o.os a.as o.os.

o.os.

Service Service Service Service

  • .~')

J t::: ~.:: *.:.:-.:::: ~=

I L_~~~--~~~~~~~

..
.:~:'.":'

?~::=c-:-::-.. :.. "".=;. ;,,;.;*==**:.._ --

'.*.:~:.=..:' ~~ ::: *

'.: -. -... *"\\

April 16, 1979

'l'o:

S. LaBruna - I S *1* Coordinator

SUBJECT:

I S I SAMPLE 1tESULTS FOR THE Sample Points Chloride, ppm llWS'l'-1 ****.*

~......... * ** *-.... *: ** ** ** * ** o... 1 o*

1CS61 lllmR 12RHR 1RH7l lR..~65 l2RH70 lRHSB

                                                  • <0.05
    • .*********** **., * ** ** *.*** **'. < 0
  • 0 5
                                          • -****<0~05
                      • .*~*******e*o* Ocl2

..... * *.* * *.* * ** * ***.******* E:t-1PTY e e e 9-e **&a. e****

  • e e*e,e**'* De***** 0 el 75
  • *.* ** * *. * * *. * *. * * * *. * *-* *.,., * *
  • 0
  • 15*

ll Safety Injection Pump **** ee<O. 05 12 Safety Injection Pump ****** -<O. OS 1SJ905 ************************<0.05 lSJ907 ************************<0.05 1SJ17~ ************* ~ ********** <o.os lsJ291*......................., ****.* <o.os Boron. Acid, Injection Tank.***** <O. OS llSJ14 7*................................ * **. < o*. 0 5 12SJ147- *.***. ******* *.**.*.**.**.**.***** -<O. OS.

11. Accumulator.................... < O
  • o 5 12 Acc~ulator......................,<0.* 05 13 Accumulator..................... *. <O.. os 14' Accumulator.................... <o*.os ll Boric Acid Storace Tank **** <0.05 12 Boric Acid Storacie Tank.**** < O. OS Boric* Acid Ba tchin9.. Tank ****** < o.., o s Boric Acid Blender............... <o.os

!RH 6 3-._ ** * **.. * ** ** * *.. * ** * ** * * *** ** **.......... * *.. < 0

  • 0 5*

1SJ22.4 1SJ219' 1SJ21.7

                                                • <0.05*

<o*... os

                      • ~************

~*********~**~*********~ <O. OS.

lsJl49.

<0.05

                                  • ~*e****

lI Cbarqin9 P\\:ltlp **** *******....... 0.15 12 Charging_ Pump ***.**,._,., **,....... <<*0°*_0 05 5

11 Containment Spray Pump *****

12 Containment Spray Pump* *****. <O.OS I

James Gueller QUARTER OF 1979.

Senior Perf cntlance Supe~isor HP/Chemistry l*~S:pqb

D~ccmbc!:..J9..LJ..2.7~8.._ ____ __

To:

S.* LaBruna -

I S r* Coordinator

SUBJECT:

I S I SA!'..PLE RESULTS FOR THE FOURTH QUARTER OF 19 7 B..

Se~ple PoiEJ:!.

£!t!.2ride, PP11 RWST-1. * *.**.*.**. * * ** * * * * *- * * *- ** * *** * **

  • 1CS6l llRHR l2P.HR l:RH7l.

1Rn65 12RH7Q.

1Fli58

  • * ** e- ** ** e* *.,,
  • c ** *
  • e. o.* e * ** * ** *** is* c

, I>**:- **.**.*, ** **

              • ~*****************

ll. Safety Injection Pu.mp* ******

l.2 Safety Injection Pwri.p ******

1SJ9 05 *.****.****.***.**.** ***** *.*****

1SJ907 ************************

lSJl.79" ****. *- ** *- *.*. g *.*.*.******.***.****

1SJ29*7-*.................................

Boron Acid Injection Tank **.***.

llS.Jl.47 *.**.*.** ***** *.*, *.** ***** ****. ****

12SJ147....*.*.*.... *****-....,..... **...

11. Acc~ulator **.******.*.****.***

12 1£cc~ula tor. *....................

13' Accurnulat.or...........................

l.4'. Acct:mulator.......................

IL Boric Acid Storase Tank ****

12 Boric Acid Storaqe Tank_......

Boric Acid Batching Tank., ****.*

Boric Acid. Bleneer...... "'.........

lRH 6 3:, **. --~................ *-.....-................ **-

1S'J224*

lSJ219 1SJ217-

!SJ149*............................

11 Char;inct P\\:mp *., **.*.**.****.*.**.

12 Charqinq P\\.:1,ip **.***.***.**.***.*

11 Ccntair.r..ent Spray Pur.1p *****

12 Containnent Spray P'Ulilp **.***.

<e05

<oOS

.. cs

<&OS

< *. OS

<.. OS

<.OS

<.OS

.os

..05

.090

.099

<.075

<.. 075

<<.os

<.os

<.os

<.os

<.. os

<.os

<.as.

.075

.075

<.os

<.os

<.os

<.. os

<.OS:

<.OS.

<.OS*

<.OS

<.OS

<.OS

<.OS

~

Jj -.t..tL--

jemes Gueller Senior Perf or:-::ance Supervisor HP/Chemistry

j.*

~

e Sc f11..<:.r.-be r 2 9, i *9 7 8

~

-*----*---~*,..e.........,.._

'l'o:

  • s... La:Sruna -

X S t Coord.ir.ator

SUBJECT:

I S I S~J-C..PLE P.ESULTS i"OR 'I*EE

'IHI ?D QUARTE.R OF 19 7 8

  • S.u:rple Poin!!,

~..;sir-1 1CS61 11?.!:R l2:3R.

l:.Hil 1?~65 l.i~.F.iO

    • *******.*** **. *-. ** *1* ** *** *.*
                                            • 0*
        • ** *** **. *- *** ** ******.*.* I)" *...

... *-.,... ** ~.........

l?.:i.5 8

11. Safety Injection F"U:I:p ****.**

12 Srtf'ety Injection Fmr.p * *-* ***

15.7905. ***** ** *-*............ ***** *** I> **

1SJ907 ~***********************

lSJl i9* ***,.. *- *.........** *- ***.....*.**.

1SJ2.97 ***-. **.....

,.. *****... *-.. *~*..,.,

Soron Acid\\ Injection Ta."'lk., *-...

llSJ147 l2SJ147.. **-.. **..... **..

  • *- *.*.**.* ** **.*** ** *** o. ** * **.. *- **.
11.

12 F.cci.::r.ula. tor.

  • F.ccl:..'71ul a tor..

13' ~c:ci.:=:ulator-..........................

14: ~cc"..:.:;.ulc:tor...................

11 ~oric Aci~ Storase Tc~k *~*~

12 E~ric Acid Sto:age Tank *r*~

Sc?:ic r.:.cit: Ea tchir:g Ta.r:k *-* ****

~oric J.c.id: 31en~er................., **

l?B 6:3* *.**, *.*.*.*..****, *-.,......... ~.............

... *-** -~...... ***.. *-...,.,.. ** **... **.......

  • . ** *..,........... *: *-........... ** *.**,.*, *i. -

.... *':* *.****.**.***,,.. *-. ** ** *. *1. **.,

1SJ224, 1SJ219

l~J217'

!SJ149

11. Chf=.rq_i:ig P\\:.!!:p **.*.***.*,.......,.***

12 ll.

12 C!":~rqing Fu:r.p ***.*******.****.

Ccr~ ta!.:r:..~n t

~pray '\\:.::":p *****

Ccntain:::ent Spray Pur..p *****

<.os 500

<.,cs.

<.cs

<.os

<.OS

<.cs

<.os

<.cs

<.as

<.os

<.cs

<.,os

<.os.

.09-

<. os

<.os

.cs

.07

.08

  • CS*

.16-

  • 29
  • . 10

.11'

<.OS

<.as"

<.05?

<< *. OS

<:.05

<.. os

<.cs*

..17

  • 35:

~-**-.... - *-~--

~._...... u r-'-L c __

i~..z.*es G~el !.:;r Sardor ?r:rfc;;:*.. 1.::1ce S\\!pe:r..*iscr HP /Ch~:".i 5 try

June 30, 1978 To:

S. LaBruna -

I S* I Coordinator

SUBJECT:

I S-I SAMPLE RESULTS FOR THE SECOND QUARTER OF. 1978..

Sample* Points RWST-1 1CS61 llRHR 12RHR 1RH71.

1RH65 12RH70

1RH58, 11 Safety Injection Pump 12 Safety Injection Pump 1SJ905 1SJ907" 1SJ179 1SJ297 Boron Acid' Injection Tank 11SJ14.7 12SJ14T l!. Accumulator.

12 ACCUr.lUlator 13 Accumulator 14 Accumulator lI Boric Acid Storage Tank 12 Boric Acid Storage Tank Bori.c-Acid Batching Tank Boric Acid Blender 1RH63:

1SJ224<

1SJ219:

1SJ217'

. 1SJ14-9 11 Charging Pump 12 Charging Pump 11 Containment Spray Pump 12 Containment Spray Pump Chloride, ppm 0.06 750

<0.05 0.10 0.10 0.13 0.08 0.08 o.os 0.06 0.05 o.os 0.14:

0.13 0:.06 0.08

o. as.

o'.. os 0 *. 09*

0.11 0.12 1.28

l. 31 0-.10.-

0:.10

<O'.. 0 5.

<0.05

<0.05 0... 06

<0.05 0.08 0.10 0.78 0.20

\\\\~ )1,_AL-

.rlimes Gueller Senior Performance Supervisor HP/Chemistry