ML18081A826
| ML18081A826 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 11/28/1979 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Librizzi F Public Service Enterprise Group |
| Shared Package | |
| ML18081A829 | List: |
| References | |
| NUDOCS 8001030329 | |
| Download: ML18081A826 (2) | |
Text
l\\IOVEMBER 2 8. 1879 Docket No. 50-272 Mr. F. P. Librizzi General Manager, Electric Production Production Department Pubric Service Electric and Gas Company 80 Park Pl ace Newark, New Jersey 07101
Dear Mr. Librizzi:
By letter of January 189 1977 we reouested a detailed evaluation of the potential consequences of a refueling accident inside the containment of Salem Unit f.lo. 1. This information was reouired to document and confirm data that you had previously provided the staff during a preliminary evaluation of these consequences.
f\\S the result of this preliminary review we d'fd not expe-ct that modifications to Salem Unit No. 1 would be needed.
The informatio.n that you provided fo your response of March 30~ 1977 indi,-
cated that,. using the assumptions provided in negulatory Guide 1.25~
such an accident would have consequences wft~Tin allowed exposul"e guidelines bf 10 CFR 100.
We have reviewed the information that you provided and have also made an
- independent analysis of this type of accident.
As the result of this analysi:s~ we have concluded that the consequences are appropriately within the guidelines of 10 CFR 100 and are, therefore~ acceptable. A copy of our Safetv Evaluation is enclosed.
Thest: y*est:lt.$ confirm those of our preliminary review; consequently~ we consider this matter resolved.
Enclosure:
Safety Evuluation Sincerely.,
':Original Signed. B~.
A. Schwem:er, Chief Operating Reactors Branch !fl Division of Operating Reactors f>V.*O)l
\\ 1\\
OFFICE~* p,~~~.;;~~~--Yi > cs*~~~.#~~.*** * * * * * * * * * * * * * * * * * * * * * *. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ~\\1**<r.'. * *
- X? \\ '""::~::1 i1;~!r *
- -** ;*ij,;Ji:*r *
- 1 *.--*-* *-*-*--*-*- __ -:--:.-_: _ *:._-.-_-:: *---*- - _:
_ <'~~ --**
NRC FORM 318 (9-76) NRCM 02*+o
{ru.s. GOVERNMENT PRINTING OFFICE: 1979-289-369
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
- Docket No,. 50... 272 Mr! F. P. Librizzi General Manager, Electric Production Production *Department November 28, 1979 Public Service Electric and Gas Company 80 Park Place Newark, New Jersey 07101
Dear Mr,
Librizzi:
By letter of January 18, 1977 we requested a detailed evaluation of the potential consequences of a refueling accident inside the containment of Salem Unit No. 1. This information was required to document and confirm data that you had previously provided the staff during a preliminary evaluation of these consequences, As the result of *this preliminary review we did not expect that modifications to Salem Unit No. l would be needed.
The infonnation that you provided in your response of March 30, 1977 indi-cated that, using the assumptions provided in Regulatory Guide 1.25, such an acciden*t would have consequences within* allowed exposure gt.i.idelines of 10 CFR 100.
We have reviewed the information that you provided and have also made an independent analysis of this type of accident. *As the result of this analysis, we have ~oncluded that the consequenc~s are appropriately within
- the guidelines of l 0 CFR 100 and are, therefore, acceptable. A copy of our Safety Evaluation is enclosed. These results confirm those of our preliminary review; consequently, we consider this matter resolved.
Enclosure:
Safety Evaluation Sincerely,
~-
Schwencer, Chief rating Reac;tors Branch #1 Division of Operating Reactors