ML18081A622
| ML18081A622 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 11/09/1979 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Librizzi F Public Service Enterprise Group |
| Shared Package | |
| ML18081A623 | List: |
| References | |
| NUDOCS 7911280479 | |
| Download: ML18081A622 (3) | |
Text
NOVEMBER 9 197"9 Docket No. 50-272 Mr. F. P.
Librizzi~ General Manager Electric Production Production Department DISTRIBUTION Docket File 50-272 NRC PDR Lo1cal PDR NRR Rdg ORBl Rdg H. Denton D. Eisenhut R. Tedesco W. Gammill B. Grimes I &E ( 3)
W. Ross Public Service Electric and Gas Company 80 Park Place9 Room 7221 A. Schwencer C. Parrish Attorney, OELD NSIC Newark, New Jersey 07101
Dear Mr. Librizzi:
TERA In our letter of August 31, 1978 we requested information regarding pipe cracks in the chemical volume control system of Sal em Unit No. 1 that were caused by excessive charging pump vibrations. This information was required to assist our review of potential correlation of pump vibration and fatigue failure of piping.
You responded to our request by letters dated October 27, 1978 and October 5, 1979.
We have reviewed your current operations practice that includes the use of mechanical dampers on the suction side and discharge side of the positive displacement discharge pump.
As noted in the enclosed Safety Evaluation Report, we have concluded that test data indicate that vibrations have been arrested to an acceptable range.
With maximum stress fluctuation of 300 psi in the normal operating mode, fatigue failure in the system piping is not anticipated at Salem Unit No. 1.
We appreciate your assistance in this review and consider this matter r-esolved.
'.\\,i ~~
Sincerely,
...,J, \\l \\w~~
- -- ' *..., *-~*u W~
Diigina*I Signed Bv.
~~--=--
~.
Enclosure:
Safetyrltvaluation Report cc: w/enclosure
. See *_next page LETEf A. Schwencers Chief Operating Reactors Branch #1 Division of Operating Reactors f
~r\\' OFFICE~~i~~i?~***"**~i:~~:~**~r***.................. ************-*********"'"'""'"'''''''
'¥ SURNAME~I; *, *. *.;. 79*......... ~ ;*..... ~;....
- 1 *.....................................................................
DATE*1*. /-?. /.... ~~-* *_*..... /. ~:.... *I*.............. -.............................................. *~*-* *_* *_*.
NRC FORM 318 (9-76) NRCM 0240-
. fru.s. G 00VERNMENT PRINTING OFFICE' 1979-289*369
.. -'~*---
UNITED ST ATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 November 9,. 1979 Docket No. 50-272 Mr. F. P. Librfzzi, General Manager Electric Production Production Department Public Service Electric and Gas Company 80 Park Place, Room 7221 Newark, New Jersey. 07101 Deai Mr. Librizzi:
In our letter of August 31, 1978 we requested information ~egardin~ pipe cracks in the chemical volume control system of Sal em Unit No. 1 that were caused by excessive charging pump vibrations. This information was required to assist our review of potential correlation of pump vibration and fatigue failure of piping.
You responded to our request by letters dated October 27, 1978 and October 5, 1979.
We have reviewed your current operations practice that includes the use of mechanical dampers on the suction side and discharge side of the positive displacement discharge pump.
As noted in the enclosed Safety Evaluation Report, we have concluded that test data indicate that vibrations have been arrested to an accepta~e range.
With maximum stress fluctuation of 300 psi in the normal operating mode, fatigue failure in the _system pipfog is not anticipated at Sal em Unit No. 1.
We appreciate your assistance in this review and consider this matter resolved.
Enclosure:
Safety Evaluation Report cc: w/enclosure See next page
?
Sincerely,
/]
,' / ~U'£Udk--
u A'. s8iwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors 7911280 'f 7'.
f
., ii:
.:;.' :-:.1e...-_,.
Mr. F. P. Librizzi
- Public Service *Electric and Gas Company cc:
Mark J. Wetterhahn, Esquire Conner, Moore and Corber Suite 1050 1747 Pennsylvania Avenue, NW Washington, D. C.
20006 Richard Fryling, Jr., Esquire Assistant General Solicitor Public Service Electric and Gas Company 80 Park Place Newark, New Jersey 07101
- Gene Fisher, Bureau of Chief Bureau of Radiation Protection 380 Scotch Road Trenton, New Jersey 08628 Mr. Hank Midura, Manager Salem Nuclear Generating Station Public Service Electric and Gas Company 80 Park Place Newark, New Jersey 07101 Mr. R *. L. Mittl,.General Manager Licensing and Environment Public Service Electric and Gas Company 80 Park Place Newark, New Jersey 07101 Salem Free Library 112 West Broadway
- Salem, New Jersey 08079 Leif J. Norrholm u.. s. Nuclear Regulatory Commission Drawer I Hancocks Bridge, New Jersey 08038 November 9, 1979