Mr. Thomas J. Palmisano
UNITED STATES .
NUCLEAR REGULATORY COMMISSION- *
REGION 111
801 WARRENVILLE ROAD
LISLE, ILLINOIS 60532-4351
November 5, 1998
Site Vice President and General Manager
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Covert, Ml 49043-9530
SUBJECT:
PALISADES INSPECTION REPORT 50-255/98017(DRP)
Dear Mr. Palmisano:
On October 7, 1998, the NRC completed an inspection conducted at your Palisades Nuclear
Generating Plant. The enclosed report presents the results of that inspection.
The inspection covered a 7-week period. Areas examined during the inspection are identified in
the report. Within these areas, the inspection consisted of a selective examination of
procedures and representative records, interviews with personnel, and observation of activities
in progress. The purpose of the inspection effort was to determine whether activities authorized
by the license were conducted safely and in accordance with NRC requirements.
Your staffs conduct of operations was professional with a focus on safety. We noted that the
Senior Reactor Operafors' command and control of control room activities was generally good
with one noted exception. Overall, this reflected an improvement in this area from previous
inspection periods. Also, the control room operators demonstrated a good questioning attitude .
regarding scheduled activities on a more frequent basis. Your engineering staff provided the
licensed operators with an effective tool to monitor steady state reactor power. This tool was .
implemented as part of your staffs efforts to raise steady state reactor power to 99.9 percent
from the previously administratively limited 99.6 percent.
No violations or deviations of NRC requirements were identified.
981 t1000202c! 6~668~55
A
~
G
T. Palmisano
Distribution:
CAC (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/encl
J. Caldwell, Riii w/encl
C. Pederson, Riii w/encl
- B. Clayton, Riii w/encl
SRI Palisades w/encl
DRPw/encl
TSS w/encl
DRS (2) w/encl
Riii PRR w/encl ,
.*;,:!"*::~,.-.., ~.~ . .,,,:_,_.-.;:'.,_-. .....
. ..i:;-.:,:. *** .**
t:i&.YaLIC]!E.4>1'\\Wencl
Docket File w/encl
GREENS
. IEO (E-Mail)
DOCDESK (E-Mail)
J. ~*: .~. C. ~* .:
-2-
- -* * -** *c *o ---* -i*'t"- *
0 **--* * _,. -- __ .. ___ -
'
T. Palmisano
-2-
In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter and the
enclosure will be placed in the NRC Public Document Room.
Sincerely,
- s/Bruce L. Burgess
Bruce L. Burgess, Chief
Reactor Projects Branch 6
Docket No .. : 50-255
License No.: DPR-20
Enclosure:
cc w/encl:
Inspection Report 50-255/9801 ?(DRP)
R. Fenech, Senior Vice President, Nuclear
Fossil and Hydro Operations
N. Haskell, Director, Licensing
R. Whale, Michigan, Public Service Commission
Michigan Department of Environmental Quality
Department of Attorney General (Ml)
Emergency Management Division, Ml Department
of State Police
DOCUMENT NAME: G:\\PALl\\PAL98017.DRP
f.
To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" =
.Co
w/attach encl "N".= No co
'
OFFICE
Riii
NAME
Schweibinz:dp
DATE
11/ /98
OFFICIAL RECORD COPY
.. -.... . ... .
. . ..
-- - .
. .. ~- .. -- --
. . - .... ,;, ..
~** ....
... . '
-... - --- **-* --.. --....
'
-~.