ML18068A488

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-255/98-17 on 980821-1007.No Violations Noted
ML18068A488
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/05/1998
From: Burgess B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18068A489 List:
References
50-255-98-17, NUDOCS 9811100221
Download: ML18068A488 (3)


See also: IR 05000255/1998017

Text

Mr. Thomas J. Palmisano

UNITED STATES .

NUCLEAR REGULATORY COMMISSION- *

REGION 111

801 WARRENVILLE ROAD

LISLE, ILLINOIS 60532-4351

November 5, 1998

Site Vice President and General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, Ml 49043-9530

SUBJECT:

PALISADES INSPECTION REPORT 50-255/98017(DRP)

Dear Mr. Palmisano:

On October 7, 1998, the NRC completed an inspection conducted at your Palisades Nuclear

Generating Plant. The enclosed report presents the results of that inspection.

The inspection covered a 7-week period. Areas examined during the inspection are identified in

the report. Within these areas, the inspection consisted of a selective examination of

procedures and representative records, interviews with personnel, and observation of activities

in progress. The purpose of the inspection effort was to determine whether activities authorized

by the license were conducted safely and in accordance with NRC requirements.

Your staffs conduct of operations was professional with a focus on safety. We noted that the

Senior Reactor Operafors' command and control of control room activities was generally good

with one noted exception. Overall, this reflected an improvement in this area from previous

inspection periods. Also, the control room operators demonstrated a good questioning attitude .

regarding scheduled activities on a more frequent basis. Your engineering staff provided the

licensed operators with an effective tool to monitor steady state reactor power. This tool was .

implemented as part of your staffs efforts to raise steady state reactor power to 99.9 percent

from the previously administratively limited 99.6 percent.

No violations or deviations of NRC requirements were identified.

981 t1000202c! 6~668~55

PDR

A

~

PDR

G

T. Palmisano

Distribution:

CAC (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/encl

J. Caldwell, Riii w/encl

C. Pederson, Riii w/encl

  • B. Clayton, Riii w/encl

SRI Palisades w/encl

DRPw/encl

TSS w/encl

DRS (2) w/encl

Riii PRR w/encl ,

.*;,:!"*::~,.-.., ~.~ . .,,,:_,_.-.;:'.,_-. .....

. ..i:;-.:,:. *** .**

t:i&.YaLIC]!E.4>1'\\Wencl

Docket File w/encl

GREENS

. IEO (E-Mail)

DOCDESK (E-Mail)

J. ~*: .~. C. ~* .:

-2-

  • -* * -** *c *o ---* -i*'t"- *

0 **--* * _,. -- __ .. ___ -

'

T. Palmisano

-2-

In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

Sincerely,

s/Bruce L. Burgess

Bruce L. Burgess, Chief

Reactor Projects Branch 6

Docket No .. : 50-255

License No.: DPR-20

Enclosure:

cc w/encl:

Inspection Report 50-255/9801 ?(DRP)

R. Fenech, Senior Vice President, Nuclear

Fossil and Hydro Operations

N. Haskell, Director, Licensing

R. Whale, Michigan, Public Service Commission

Michigan Department of Environmental Quality

Department of Attorney General (Ml)

Emergency Management Division, Ml Department

of State Police

DOCUMENT NAME: G:\\PALl\\PAL98017.DRP

f.

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" =

.Co

w/attach encl "N".= No co

'

OFFICE

Riii

NAME

Schweibinz:dp

DATE

11/ /98

OFFICIAL RECORD COPY

.. -.... . ... .

. . ..

-- - .

. .. ~- .. -- --

. . - .... ,;, ..

~** ....

... . '

-... - --- **-* --.. --....

'

-~.