Forwards Insp Rept 50-255/96-14 on 961019-1123 & Notice of Violation
ML18066A842
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/22/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18066A843 List:
References
NUDOCS 9701280340
Download: ML18066A842 (4)


See also: IR 05000255/1996014

Text

  • . .

January 22, 1997

Mr. T. Palmisano, General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

SUBJECT:

NRC INTEGRATED INSPECTION REPORT NO. 50-255/96014(DRP)

AND NOTICE OF VIOLATION

Dear Mr. Palmisano:

On November 23, 1996, the NRC completed an inspection at your Palisades

Nuclear Generating Plant. The enclosed report presents the results of that

inspection.

Based on the results of this inspection, the NRC has determined that your

plant was operated in a safe manner.

We are concerned, however, about two

violations of NRC requirements that were identified. The first violation is

of concern because it includes two examples where your licensed operating

staff failed to adhere to procedures while performing outage related

.activities. Inadequate coordination and conununication between work groups

performing the outage activities contributed to this violation. The second

violation is of concern because of your staff's failure to provide adequate

installation instructions for a temporary modification on the containment

polar crane.

These violations are cited in the enclosed Notice of Violation (Notice), and

the circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should *follow the instructions specified in the enclosed Notice when

preparing your response. * The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

9701280340 970122

PDR

ADOCK 05000255

G

PDR

-*

T. Palmisano

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter, its enclosures, and your response will be placed in the NRC

Public Document Room (PDR).

Sincerely,

/s/John A. Grobe for

James L. Caldwell, Director

Division of Reactor Projects

Docket No.

50-255

License No. DPR-20

Enclosures:

I. Inspection Report

No. 50-255/96014(DRP)

2.

Notice of Violation

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

Thomas C. Bordine, Manager, Licensing Dept.

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Department of Attorney General (Ml)

DRP w/encl

Docket File w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

SRI Palisades, Big Rock w/encl

A. B. Beach, w/encl

G. E.*Grant, Rill w/encl

Project Manager, NRR w/encl

H. B. Clayton, w/encl

W. L. Axelson, w/encl

CAAi w/encl (E-mail)

RII I PRR w/encl

  • .c. D. Pederson, ~/encl
  • Document:

R:\\insprpts\\powers\\pali\\pal96014.drp

To ....,.f_ a Cop)' of tllfs ~t.

hodfcat:e t* tlle bo.11 -c* * Copy wt~ att:acll/eac:l *p * Copy wftll attacll/eac:l

"II" *

No co

OFFICE

Riii

E.

RII I

NAME

Brow

Caldwell

DATE

01 C>'

97

01

97

01 02 97

01

97

OFFICIAL RECORD COPY

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION 111

801 WARRENVILLE ROAD

LISLE. ILLINOIS 60532-4351

January 22, 1997

Mr. T. Palmisano, General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

SUBJECT:-

NRC INTEGRATED INSPECTION REPORT NO. 50-255/96014{DRP)

AND NOTICE OF VIOLATION

Dear Mr. Palmisano:

On November 23, 1996, the NRC completed an inspection at your Palisades

Nuclear Generating Plant. The enclosed report presents the results of that

inspection.

Based on the results of this inspection, the NRC has determined that your

plant was operated in a safe manner.

We are concerned, however, about two

violations of NRC requirements that were identified. The first violation is.

of concern because it includes two examples where your licensed operating

staff failed to adhere to procedures while p*erforming outage related

activities. Inadequate coordination a~d communication between work groups

performing the outage activities contributed to this violation. The second

violation is of concern because of your staff's failure to provide adequate

installation instructions for a temporary modification on the containment

polar crane.

These violations are cited in the enclosed Notice of Violation {Notice), and

the circumstances surrounding the violat1ons are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should follow the instructions specified in the enclosed Notice when

preparing your response.

The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

T. Pa 1 mi sano

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter, 1ts enclosures, and your response will be placed in the NRC

Public Document Room (PDR}.

Docket No.

50-255

license No. DPR-20

Enclosures:

1.

Inspection Report

No. 50-255/96014(DRP)

2.

Notice of Violation

Sincerely,

ames l. Caldwell, Director

Division of Reactor Projects

cc w/encl: Robert A. Fenech, Vice President,

Nuclear Operations

Thomas C. Bordine, Manager, licensing Dept.

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Department of Attorney General (Ml)