Forwards Rev 18 to EM-09-02,Pages 14 & 15 Inservice Testing Program Relief Request Valve Relief Request 20
ML18065B081
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/27/1996
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18065B083 List:
References
NUDOCS 9612040211
Download: ML18065B081 (3)


Text

(

\\

consumers Power POWERlllli lllllCRlliAll'S fllllllilfUS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 November 27, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT Thomas C. Bordlne Manager, Licensing REVISION OF INSERVICE TESIINGJ~ROGHAMJ~ELIEF_BE:QUEST-VALVE RELIEF REQUEST# 20 Attached is a revised valve relief request number 20 for the lnservice Testing Program.

This relief request was previously approved in the Safety Evaluation dated-August 30, 1996, following the March 5, 1996, submittal of the third 120-month interval lnservice Testing Program. The original relief request was contained within Attachment 3 of to the March 5, 1996, submittal.

A revision to this relief request was determined to be necessary when it was discovered that the function of the valve was incorrectly described. This revision to the relief request was determined to be inconsequential to the basis of relief. Relief was previously granted on the basis that compliance with the code requirements for valve position indication verification, stroke time testing, and stroke time acceptance criteria was impractical. The function of the valve, while incorrectly described, had no impact on the ability to test the valve in accordance with the code requirements, so compliance remains impractical.

This revision of valve relief request number 20 is being submitted as a clarification to the original-siil5rriittal.

q 9612040211 961127 PDR ADOCK 0500025 i

\\ I I

_P_ --. ___ (y1

._ 'i __

PDR _L

\\J '3 a\\;:.

A CM5 ENERGY COMPANY

I J

r

SUMMARY

OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.

~~

Thomas C. Bordine Manager, Licensing CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment 2

ATTACHMENT CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 REVISION OF INSERVICE TESTING PROGRAM RELIEF REQUEST VALVE RELIEF REQUEST# 20 2 Pages