Requests Rev to Tech Spec Change Request Proposing Rev of Administrative Controls Section,Per Discussions W/Nrc
ML18065A953
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/02/1996
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18065A954 List:
References
NUDOCS 9610080409
Download: ML18065A953 (3)


Text

r I

(Cl]fU$[ljjiiJil~hl'$

~lQW~~

POWERING MICHIGAN'S l'IUllillE55 Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 2, 1996 U S Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT Thomas C. Bordine Manager, Licensing TECHNICAL SPECIFICATION CHANGE REQUEST - ADMINISTRATIVE CONTROLS -

SURVEILLANCE REVISION Consumers Power Company submitted a Technical Specifications change request proposing revision of the Administrative Controls section on December 11, 1995.

Change 11 of that request proposed deleting surveillance requirement 4.6.2b (containment spray nozzle testing) and relying upon a similar ASME Boiler and Pressure Vessel Code Section XI testing requirement, Article IWC-5222( d). That change would relax the testing frequency from five years to ten years, as suggested in Generic Letter 93-05.

After discussing the change with the NRC Palisades Project Manager, it was concluded that retaining surveillance requirement 4.6.2b, but with a ten year frequency, would meet the intent of the originally proposed change, and would avoid any question about the exact equivalence of the two requirements. Therefore, this letter revises our change request accordingly. This revision does not alter the conclusions of the previously submitted No Significant Hazards Analyses. A revised page 4-39 (re-numbered as 4-24), which retains surveillance 4.6.2b, but alters its frequency from five years to ten years, is provided as Attachment 1.

9610080409-961002-PDR ADOCK 05000255 p

PDR A CMS ENERGY COMPANY

SUMMARY

OF COMMITMENTS This letter establishes no new commitments and makes no revisions to existing commitments.

Thomas C. Sardine Manager, Licensing CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Enclosure 2

TECHNICAL SPECIFICATION CHANGE REQUEST ADMINISTRATIVE CONTROLS - SURVEILLANCE REVISION CONCURRENCES To the best of my knowledge, the contents of this Technical Specification change request, which revises a previously proposed change to Surveillance Requirement 4.6.2b, Containment Spray Nozzle testing, is truthful and complete.

Th22.::~

Plant General Manager Sworn and subscribed to before me this~ day of {)~

1996.

~V\\f\\-~~

Alora M. Davis, Notary Public Berrien County, Michigan (Acting in Van Buren County, Michigan)