ML18065A799
| ML18065A799 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/24/1996 |
| From: | Smedley R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18065A800 | List: |
| References | |
| NUDOCS 9607020191 | |
| Download: ML18065A799 (144) | |
Text
consumers Power POWERINli MICHl&AN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 June 24, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION - INSERVICE
- INSPECTION PROGRAM In a letter dated April 23, 1996, the NRC transmitted a request for additional information
- concerning the Palisades Third Interval lnservice Inspection Program submitted on September 6, 1995. This letter provides that information. contains copies of the NRC request items and our response to each item.
Attachments 2, 3, and 4 contain the revised schedule pages for Sections 6, 8, and 9 of the Third Interval Program relating to the reactor vessel weld examinations after annealing. Sections 6 and 8 are replaced in entirety for convenience. For Section 9, only the Population Summary and the first 1, 3 pages of the Interval 3 Program Plan are attached since they are the only portions affected by the schedule change. Attachment 5 contains a revised Relief Request RR-4. Attachment 6 contains the Palisades Pressure*Testing Program EM-09-13, which is being submitted as requested.
A CMS' ENERGY COMPANY
I As requested in the April 23, 1996, NRC letter, a copy of this submittal is being sent directly to the NRC's contractor, Idaho National Engineering Laboratory (INEL), to the attention of:
Michael T. Anderson INEL Research Center 2151 North Boulevard PO Box 1625 Idaho Falls, Idaho 83415-2209
SUMMARY
OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.
Richard W. Smedley Manager, Licensing CC Administrator, Region Ill, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Mr. Micheal T. Anderson, INEL 6 Attachments 2
)
.,'(
- i.
- 1,.***
>;J./
. r-
\\.. ' ~~..
ATTACHMENT 1 CONSUMERS POWER COMPANY PALISADES PLANT
. DOCKET 50-255 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION INSERVICE INSPECTION PROGRAM ADDITIONAL INFORMATION RESPONSES 6 Pages
RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION FOR INSERVICE INSPECTION PROGRAM NRC REQUESTED INFORMATION (1)
In the December 20, 1995, RAJ, you were requested to verify that at least 90% of each reactor pressure vessel (RPV) shell weld (Items B 1. 11 and B 1. 12) has been examined to satisfy augmented RPV examination requirements specified by the regulation in 10 CFR 50.55a(g)(6)(ii)(A)(2). In the February 19, 1996, response, you stated "Effectively, 100% of the accessible welds which are required for examination were examined by our contractor (Westinghouse) during the 1995 refueling outage." This response is not clear. Confirm that at least 90% of each of the Item B 1. 11 and B 1. 12 shell welds have been examined and provide the percentage of the Code-required volume that was examined for each of these welds.
CPCO RESPONSE (1)
CPCO has reviewed the Westinghouse Reactor Vessel Examination report from the 1995 refueling outage to reconfirm that at least 90% of. the ASME Section XI required volume on the Reactor Pressure Vessel, Category 8-A, Item 81.11 and 81.12 were examined.
Identified below are the specific weld numbers and the examination percentages which were achieved for each weld:
Category 8-A. Item 81.11 (Circumferential Welds)
Weld 8~112 (Upper Shell to Lower Shell), Weld Volume Coverage: 90.37%
Weld 9-112 (Upper Shell to Intermediate Shell), Weld Volume Coverage: 90.37%
Weld 10-112 (Lower Shell to Bottom Head), Weld Volume Coverage: 100%
Category 8-A. Item B 1.12 (Longitudinal Welds)
Weld 1-112A (Upper Shell at 90°), Weld Volume Coverage: 93.8%
Weld 1-1128 (Upper Shell at 210°), Weld Volume Coverage: 93%
Weld 1-112C (Upper Shell at 330°), Weld Volume Coverage: 93%
Weld 2-112A (Intermediate Shell at 270°), Weld Volume Coverage: 97.86%
Weld 2-1128 (Intermediate Shell at 30°), Weld Volume Coverage: 100%
Weld 2-112C (Intermediate Shell at 150°), Weld Volume Coverage: 100%
Weld 3-112A (Lower Shell at 90°), Weld Volume Coverage: 100%
Weld 3-1128 (Lower Shell at 210°), Weld Volume Coverage: 100%
Weld 3-112C (Lower Shell at 330°), Weld Volume Coverage: 100%
- i.
I NRC REQUESTED INFORMATION (2)
In the summary by category contained in the Program, a total of 44 areas are identified for augmented examination, but are not scheduled during the third 10-year interval. Is this an oversight? Provide a clarification regarding the scheduling of these areas.
CPCO RESPONSE (2)
The 44 are*as identified for augmented examination are scheduled for the third 10-year interval. As stated in the Section 6 Introduction, the summary by category as referenced in the NRC requested information only identifies the periods where Section XI Code credit is being taken. ASME Section XI Code credit is not being taken for the 44 augmented examinations identified. This is why 0% is identified on the third interval summary by category.
Section 9 (Pages 1-4) of The Third Ten-Year Interval Inspection Program Plan contains the 44 Augmented Examinations, and also identifies the periods and outages in which they are scheduled.
NRC REQUESTED INFORMATION 2
(3)
All 27 of the RPV welds that are accessible are scheduled to be examined during the third inspection period in.accordance with Section XI. _However, in response to the RAJ question on Request for Relief RR-9, you stated that the_ examinations performed following the vessel anneal (at the end of the first period) would be used to satisfy the examination requirements for the vessel and attaching welds.
Will the RPV be examined following the vessel anneal, as well as, at the end of the interval? Provide clarification regarding the scheduling of examinations for the RPV welds.
CPCO RESPONSE (3)
If the RPV is annealed at the end of the first period, the examinations performed will be used to satisfy the Section XI interval examination requirements for the vessel and attaching welds.
Therefore, CPCO has elected to withdraw Relief Request RR-9 at this time and will re-submit if the anneal is not performed. The revisions to the schedule for Sections 6, 8, and 9 are contained in Attachments 2, 3, and 4.
3 NRC REQUESTED INFORMATION (4)
Request for Relief RR-9 requests to defer the examination of the RPV nozzle-to-vessel welds and inside radius sections to the end of the third interval.
In the December 20, 1995, RAJ, you were asked about this relief and how it would be effected by a mid-interval vessel anneal. In response, you stated that the RPV anneal, currently scheduled for the 1998 refueling outage, would make this relief unnecessary. It was also stated that the fourth interval examinations would be performed at the end of the first period so that the time between exams did not exceed 10-years. This implies that the nozzle exams will not be deferred.
Provide a clarification regarding the status of this request for relief.
~
CPCO RESPONSE (4)
CPCO has elected to withdraw Relief Request RR-9 at this time and will re-submit if the vessel anneal is not performed. The revisions to the schedule for Sections 6, 8, and 9 are contained in Attachments 2, 3, and 4.
NRC REQUESTED INFORMATION (5)
Request for Relief No. RR-3 seeks relief from examining the steam generator shell welds to the extent required by the Code. However, the limiting factor causing a reduction in coverage (approximately 25%) is not clearly stated. In addition, coverage is limited as 75% and 98% in the axial directions and' 100% in each of the tWo circumferential directions.. Cumulatively, this* amounts to 93%
coverage and relief would not be required. Provide a descnption of the limiting condition for this weld and describe how examination coverage is determined at Palisades.
CPCO RESPONSE (5)
The limiting factors causing a reduction in coverage are welded patches, snubber attachments, 18" feedwater nozzles and an abrupt transition (Configuration of the Shell Cone) which results in a loss of contact as the exit point of the transducer travels across this point. These limitations are shown on Combustion Engineering drawings 70277-371-021, 70277-221-001,
- 70277 "'201-001, and RSG90-C271-001 which were previously submitted (Palisades' Response to Request for Additional Information - lnservice Inspection Program dated February 19, 1996).
Examination coverage for welds at CPCO is based on the most limiting ultrasonic beam angle with two direction coverage. CPCO believes that this
conservative approach is the correct way to determine the percentage of examination coverage.
NRC REQUESTED INFORMATION (6)
Request for Relief RR-4 requests relief from volumetrically examining the steam generator nozzle-to-shell welds to the extent required by the Code. It is obvious that complete examination from the nozzle side is impractical (if not impossible).
However, considering the configuration, the axial coverage from the nozzle side appears high. Provide an explanation describing how the axial scan from the nozzle side was performed.
CPCO RESPONSE *
(6)
- To determine the most accurate approximation for the area of coverage for this relief request, CPCO, working with Electric Power Research Institute (EPRI),
4 has developed a computer model of these welds. Based on the modeling which was performed, Relief Request RR-4 has been revised and is resubmitted in for your review. The results from the EPRI computer modeling are being formulated into a final report which will be available at Palisades upon receipt from EPRI.
The steam generators were replaced during the middle of the second interval.
Review of the preservice data indicated that no exam was performed from the nozzle side. The computer modeling which *was performed accurately fdentifies the exam coverage~ an*d the optimum transducer angles to be used for these
- examinations.
NRC REQUESTED INFORMATION (7)
The revised version of Request for Relief RR-05 includes Items 83. 150 (nozzle-to-vessel welds) and 83. 160 (inside radius sections). However, the inside radius (JR) sections are not addressed. If relief is required for the JR sections, provide a description of the limitations, the estimated coverage, and any low coverage obtained(< 20%), provide a description of how reasonable assurance of the structural integrity will be provided for the nozzle-to-vessel welds.
CPCO RESPONSE (7)
Relief is required forthe inside radius section as identified on Relief Request RR-5 for welds E-56A-05 and E-568-05. The inside radius sections, along with
the nozzle to vessel welds are limited due to the weld being covered by the support pads which make it inaccessible for any kind of a surface or volumetric examination within the area of the pads. In RR-5, the inner radius weld volume is considered as one of the 4 required weld volumes which was identified.
The design of welds E-56A-07 and E-568-07 do not have inside radius sections (Reference Atlas Industrial Drawings 1733-6 and 1759-4 which were supplied with Palisades' Response to Request for Additional Information - lnservice Inspection Program dated February 19, 1996).
5 As identified on the referenced drawings, there are two Class 1 nozzles on the Regenerative Heat Exchangers and are identified as nozzles "O" and "P". The subject welds (E-56A-07 and E-568-07) are the cross connect between the two vessels and are more of a "stub-in" configuration. Therefore, these two welds do not have an inner radius section and are not actually nozzles.
Based on the Regenerative Heat Exchangers being vessels (Category 8-D),
CPCO has identified the two welds, E-56A-07 and E-568-07, as Item Number 83.150 and scheduled these welds for examination. Item NumberB3.160 is not applicable for this application.
Reasonable assurance of the structural integrity will be provided for the welds identified in Relief Request RR-5 by performing examination on the accessible weld volumes along with the required VT-2 examinations which are performed each refueling outage.
The Regenerative Heat Exchangers are downstream of control valve CV-2001.
In the event of a weld failure (within these components) which creates an unidentified leak rate within the Primary Coolant System of greater than 1 gpm, Plant Technical Specification 3.1.5a requires placing the reactor in hot shutdown within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. If this were a small leak of less than 1 gpm Off Normal Procedure 23.1 would identify the charging to letdown mismatch and would close CV-2001 and isolate the leak. If one of these welds were to fail creating a large loss,of coolant, Emergency Operating Procedure, EOP-4.0, "Loss of Coolant Accident Recovery", Section 4.0, Step 16 would also close CV-2001 isolating the leak.
The ultrasonic examinations, VT-2 examinations and the ability to correctly identify and isolate a leak from any one of these welds provides reasonable assurance that structural integrity will be maintained.
6 NRC REQUESTED INFORMATION (8)
In response to an NRG RAJ question regarding containment penetrations, you referenced Code Case N-522, Pressure Testing of Containment Penetration Piping, and stated that a request to use this Code Case would be submitted with a new pressure testing submittal. It was also noted that there is a separate program (EM-09-13, lnservice Inspection Pressure Testing Program) that has not been included with the /SI program. Provide a copy of the pressure testing program so that it can be reviewed with the IS/ program.
CPCO RESPONSE (8)
A submittal by CPCO to the NRC dated March 11, 1996, requested approval of Relief Requests PR-02 and PR-04. Relief Request PR-04 concerned alternative
. rules for the pressure testing of containment penetration piping in accordance with Code Case N-522. A copy of the submittal letter will be sent directly to the reviewer for information.
The Pressure Testing Program, EM-09-13, is included as Attachment 6 to this.
submittal.
ATTACHMENT 2 CONSUMERS POWER COMPANY PALISADES PLANT
. DOCKET 50-255 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION INSERVICE INSPECTION PROGRAM REVISED SECTION 6
)
SECTION 6 VERIFICATION OF SECTION XI COMPLIANCE 49
- 6.
VERIFICATION OF SECTION XI COMPLIANCE A.
INTRODUCTION The following tables document compliance. for the third interval. with the examination distribution requirements of Section XI of the ASME B&PV Code.
The tables identify the total number of components by category which are subject to distribution and the total number of components for Inspection Program B.
B.
DETERMINATION OF COMPLIANCE
- 1. First Period 50 The minimum and maximum number of components required to be examined during the first period has been determined by applying the mi.nimum and maximum percentages cited in the code. Table(s) IWB-2412-1. IWC-2412-1 and IWD-241201..
The minimum number of components to be examined is 16% of the total.
components.
The maximum number of components which can be examined is 34% of the total number of components.
- 2.
Second Period The minimum number of components to be examined is 50% to the total components.
The maximum number of components which can be examined is 67% of the total number of components.
The Section XI creditable percentage for this period is computed by dividing the number of components examined by the total number of components.
- 3. Third Period The minimum and maximum number of components to be examined is'obta1ned based solely on the number of examinations required to complete the cumulative total.
C.
NUMBER OF COMPONENTS The number of components subject to examination per period will vary throughout the life of the plant due to code changes. relief requests and line walking.
Compliance per period is based solely on the number of components subject to the examination for that period.
D.
INTERVAL COMPLIANCE Third period cumulative percentage totals which equal or exceed 100% verifies compliance with the distribution requirements of Section XI.
A separate table verifies compliance for those examinations which are deferred to the end of the interval.
51 In the event that the number of examinations subject to distribution in a category decreases. and it is determined that it is impossible to achieve 100% without re-examining components. the component will not be reexamined.
For example:
- 1.
During the first period. 5 of 20 components in a category are examined (ie.
25%).
- 2.
During the second period. it is determined that only 15 components actually exist in that category and that 5 additional components are examined (ie. 33-1/3% for this interval third and 58.3% cumulative).
- 3.
The 5 remaining components are examined during the last period (ie. a cumulative total of 91.7%).
Under this situation. which could result from a number of reasons. no further examining is required provided adequate documentation substantiates the anomaly.
VERIFICATION OF COMPLIANCE THIRD INTERVAL
, BY CATEGORY ATTACHMENT: - Category and Item Number Designation. Legend
- Category Summary, Page(s) 1-2 52
Palisades Nuclear Power Plant Third Inservice Inspection Interval ASME Section XI Category and Item Number Designation legend
- 1. An "R" after the Section XI item number for a partitular examination category identifies that there is a associated Request for Relief.
- 2. If exempt due to component thickness per Category C-F-1, Item No. CS.10 or Category C-F-2, Item No. CS.SO then; Examination Category is followed by an astrix (*). (e.g., C-F-1*, C-F-2*) Also, the Code Item No. is identified as C-F-1*-NA or C-F-2*-N~ as applicable.
- 3. If excluded by Table IWC-2500-1 per note (2)(b) for Examination Category C-F-1 or C-F-2 pipe to pipe and associated longitudinal weld, the Examination Category is followed by a pound (#). (e.g., C-F-1#, C-F-2#)
Also, the Code Item No. is identified as C-F-1#-NA or C-F-2#-NA as applicable.
- 4. For pipe restraints on lines that are exempt per IWC-1220 in accordance with Code Case N-491, the Examination Category is the applicable Category (i.e., F-A). Also, the applicable Code Item No. is used followed by a astrix (*). (e.g., Fl.2CA*)
- s.* For Examination Category C-C, Integral Attachments where the line is exempt by Table IWC-2500-1 per note (l)(c) and note (4) the Examination Category is followed by a astrix (*). (e.g., C-C*) Also, the Code Item No. is.
identified as CC*-NA.
For Examination Category C-C, Integral Attachments where the line is not exempt based on line thickness per note (4), but is ex,empt based on material design thickness per note (l)(c) then the.Examination Category*
is followed by a pound (#). (e.g., C-C#) Also, the Code Item No. is identified as CC#-NA.
- 6. Class 1, 2 and 3 Component support letter designation after the Section XI Item No.. as required by Code Case N-491.
"A" Designates one directional "B" Designates multi-directional "C~ Designates thermal movement
EXAM TOTAL INTERVAL 3 PERCENT CATEGORY ACTIVE REC SCHEDULED TOTAL POP AUG 44 B-A 28 B-B 36 B-D 42 B-F 47 B-G-1 175 B-G-2 1S2 B-H 6
B-J 748 B-K-1 20 B-L-1 4
B-L-2 4
B-M-1 2
B-M-2 14 B-N-1 B-N-2 2
B-N-3 Report: i3catpop File: sch_cat Index: key/Exam Category 44 100.0X 27 96.4X 21 42
. 100.0X 47 100.0X 171 97.7" 1S2 100.0X 2
33.3X 217 29.0%
0 a.ox 2S.OX 0
a.ox so.ox 0
a.ox 100.DX 2
100.0X 100.0X PERIOD PALI SAD THIRD INTER PERIOD 1 PERIOD 1 SCHEDULED COMPLETE PERCENT 0
0 ox 20 0
74X 6
D, 29" 20 0
48X 13 0
28%
S7 0
33%
41 0
27" 0
SO%
38 0
o*
ox 0
0 0%
0 0
ox 0
0 ox 0
0 0%
0 100X 2
0 100X a*
. 100%
GRAM PLAN
~TEGORY
SUMMARY
PERIOD 2 PERIOD 2 PERIOD 1+2 SCHEDULED COMPLETE PERCENT 0
0 ox 0
0 74X 6
0 S7" 14 0
81X 13
.0 ssx S6 0
66X 36 0
S1X 0
0 SOX 82 0
ssx 0
0 ox 0
100X 0
0 ox 0
0 0
0 ox 0
20D%.
0 0
100X 0
0 100X PERIOD 3 PERIOD 3 PERIOD 1-3 SCHEDULED COMPLETE PERCENT 0
0 ox 7
0 100X 9
0 100X 8
0 100X 21 0
100X S8 0
100X 75 0
100X 0
100X 97 0
100X 0
0 ox 0
0 100X 0
0 ox 0
100X 0
0 ox 0
300X 0
0 100X 0
0 100X 06/13/96 TOTAL PERCENT COMPLETE COMPLETE 0
a.ox 0
a.ox 0
a.ox 0
a.ox
.o a.ox 0
a.ox 0
a.ox 0
0.0%
0 a.ox 0
a.ox 0
a.ox 0
a.ox 0
0.0%
0 a.ox 0
a.ox 0
a.ox 0
a.ox Note: All totals based on Active records.
Period totals must also be Code Credit *11Y11
- Page number 1
EXAM TOTAL INTERVAL 3 PERCENT CATEGORY ACTIVE REC SCHEDULED TOTAL POP B-0 233 C-A 17 C-B 22 c-c 63 C-C#
11 C-C*
56 C-F-1 414 C-F-1#
4 C-F-1*
1272 C-F-2 174 C-F-2#
24 C-F-2*
136 D-B 56 F-A 888 N/A 578 TOTALS:
5274 Report: i3catpop File: sch_cat Index: key/Exam Category 6
2.6%
9 52.9%
16 72.7%
57 90.5%
0 0.0%
0 0.0%
215 51.9%
0 0.0%
0 0.0%
86 49.4%
0 0.0%
0 0.0%
- 56 100.0%
229
. 25.8%
0 0.0%
1403 PALI SAD THIRD INTER PERIOD 1 PERIOD 1 PERIOD 1 SCHEDULED COMPLETE PERCENT 0
0 0%
2 0
22%
4 0
25%
11 0
19%
0 0
0%
0 0
0%
68 o*
32%
0 0
0%
0 0.
0%
16 0
19%
0 0
0%
0 0
0%
13 0
23%
67 0
29%
0 0
0%
381 0
RAM PLAN l\\TEGORY
SUMMARY
PERIOD 2 PERIOD 2 PERIOD 1+2 SCHEDULED COMPLETE PERCENT 0
0 0%
4 0
67%
6 0
63%
25 0
63%
0 0
0%
0 0
0%
69 0
64%
0 0
0%
0 0
0%
27 0
50%
0 0
0 0
0%
21 0
61%
74 0
62%
0 0
0%
435 0
PERIOD 3 PERIOD 3 PERIOD 1-3 SCHEDULED COMPLETE PERCENT 6
0 100%
3 0
100%
6 0
100%
21 0
100%
0 0
0%
0 0
0%
78 0
100%
0 0
0%
0 0
0%
43 0
100%
0 0
0%
0 0
0%
22 0
100%
88 0
100%
0 0
0%
545 0
06/13/96 TOTAL PERCENT COMPLETE COMPLETE 0
0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 0.0%
0 Note: All totals based on Active records.
Period totals nust also be Code Credit "Y".
Page number 2
VERIFICATION OF COMPLIANCE THIRD INTERVAL BY CATEGORY AND ITEM NUMBER ATTACHMENT: - Category and Item Number Designation, Legend Category/Item Number Summary, Page(s) 1-12 53
)
Palisades Nuclear Power Plant Third Inservice Inspection Interval ASME Section XI Category and Item Number Designation Legend
- 1. An "R" after the Section XI item number for a particular examination category identifies that there is a associated Request for Relief.
- 2. If exempt due to component thickness per Category C-F-1, Item No. CS.IO or Category C-F-2, Item No~ CS.SO then; Examination Category is followed by an astrix (*). (e.g., C-F-1*, C-F-2*) Also, the Code Item No. is identified as C-F-1*-NA or C-F-2*-NA as applicable.
- 3. If excluded by Tabl~ IWC-2500-1 per note (2)(b) for Examinat1on Category c~F-1 or C-F-2 pipe to pipe and associated longitudinal weld, the Examination Category is followed by a pound (#). (e.g., C-F-1#, C-F-2#)
Also, the Code Item No. is identified as C-F-1#-NA or C-F-2#-NA as applicable.
- 4. For pipe restraints on lines that are exempt per IWC-1220 in accordance with Code Case N-491, the Examination Category is the applicable Category (i.e., F-A). Also, the applicable Code Item No. is used followed bY a astrix (*). (e.g., Fl.2CA*)
- 5. Fot Examinatio~ Category C-C, Integral Attachments where the line is exempt by Table IWC-2500-1 per note (l)(c) and note (4) the Examination Category is followed by a astrix (*). (e.g., C-C*) Also, the Code Item No. is identified as CC*-NA.
For Examination *category C-C, Integra 1 Attachments where the line is not exempt based on line thickness per note (4), but is e>)E!mpt based on material design thickness per note (l)(c) then the Examination Category is followed by a pound (#). (e.g., C-C#) Also, the Code Item No. is identified as CC#-NA.
- 6. Class 1, 2 and 3 Component support letter designation after the Section XI Item No. as required by Code Case N-491.
"A" Designates one directional "B" Designates multi-directional "C" Designates thermal movement
PALI SAD GRAM PLAN 06/13/96 THIRD INTERVAi!
NUMBER SUMMAR".
EXAM ITEM TOTAL INT 3 PERCENT PERIOD 1 PERIOD 1
- PERIOD 1 PERIOD 2 PERIOD 2 PERIOD 1+2 PERIOO 3 PERIOD 3 PERIOO 1-3 TOTAL PERCENT CATEGORY NUMBER ACTIVE SCH ED TOTAL POP SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE AUG MP-4.0 10 10 100.0%
0 0
0%
0 0
0%
0 0
0%
0 0.0%
OVERLAY 2
2 100.0%
0 0
0%
0 0
0%
0 0
0%
0 0.0%
RG-1.14 4
4 100.0%
0 0
0%.
0 0
0%
0 0
0%
0 0.0%
TS-4.12 28 28 100.0%
0 0
0%
0 0
0%
0 0
0%
0 0.0%
CATEGORY TOTAL:
44 44 0
0 0
0 0
0 0
B-A B1.11 3
3 100.0%
3 0
100%
0 0
100%
0 0
100%
0 0.0%
B1.12 9
9 100.0%
9
.o 100%
0 0
100%
0 0
100%
0 0.0%
B1.21 100.0%
0 100%
0 0
100%
0 0
100%
0 0.0%
B1.21R 0
0.0%
0 0
0%
0 0
0%
0 0
0%
0 0.0%
B1.22 6
6 100.0%
0 0
0%
0 0
0%
6 0
100%
0 0.0%
B1.22R 6
6 100.0%
6 0
100%
0 0
100%
0 0
100%
0 0.0%
81.30 100.0%
0 100%
0 0
100%
0 0
100%
0 0.0%
B1.40 0
0 0.0%
0 0
0%
0 0
0%
0 0
0%
0 0.0%
B1.40R 100.0%
0 0
0%
0 0
0%
0 100%
0 0.0%
CATEGORY TOTAL:
28 27 20
- 0.
0 0
7 0
0 Report: i3itrTpop Note: All totals based on Active records.
File: sch_item Period totals nust also be Code Credit "Y".
Index: key/Exam Category Page nurrt>er 1
EXAM ITEM TOT AL I NT 3 CATEGORY NUMBER ACTIVE SCHED B-B B2. 11 B2.11R B2. 12 B2.21.
B2.21R B2.22 B2.22R B2.31 B2.32 B2.40 B2.S1 B2.80 CATEGORY TOTAL:
B-D B3. 100 B3. 110 B3. 110R Report: i3it~p File: sch_item 0
2 4
0 8
4 10 2
2 2
36 6
0 6
Index: key/Exam Category 0
2 2
0 0
8 2
2 2
21 6
0 6
PERCENT TOTAL POP o.ox 100.0X S.O.OX 100.0X o.ox o.ox 100.0X SO.OX 10.0X SO.OX 100.0X 100.0X 100.0X o.ox 100.0X PALI SAD THIRD INTERVA~
OGRAM PLAN M NUMBER
SUMMARY
PERIOD 1 PERIOD 1 PERIOD 1. I PERIOO 2 PERIOD 2 PERIOO 1+2 SCHEDULED C~PLETE PERCENT I SCHEDULED COMPLETE PERCENT 0
0 ox 0
0
.o SOX 0
100X 0
0 ox 0
SOX 0
0 ox 0
0 0
0 ox 0
0 0
0 ox 0
0 4
0 SOX 4
0 1oox 0
0 ox 0
0 ox 0
100X 0
0 100X 0
0 ox 0
0 ox 0
0 ox 0
0 ox 0
0 ox
- 0.
0 ox 6
0 6
0 6
0 100X 0
0 100X 0
0 ox 0
0 0
17X s
0 100X 06/13/96 PERIOO 3 PERIOO 3 PERIOD 1-3 TOTAL PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE 0
0 ox 0
o.ox 0
0 100X 0
o.ox 0
100X 0
o.ox 0
100X 0
o.ox 0
0 ox 0
o.ox 0
0 ox 0
o.ox 0
0 100X 0
o.ox 2
0 100X 0
o.ox 0
0 100X 0
o.ox 0
100X 0
o.ox 2
0 100X 0
o.ox 2
0 100X 0
o.ox 9
0 0
0 0
100X 0
o.ox 0
0 ox 0
o.ox 0
0 100X 0
o.ox Note: All totals based on Active records.
Period totals rrust also be Code Credit 11Y11
- Page number 2
PALI SAD OGRAM PLAN 06/13/96 THIRD INTERVA M NUMBER
SUMMARY
EXAM ITEM TOTAL INT 3 PERCENT PERIOD 1 PERIOD 1 PERIOD 1 PERIOD 2 PERIOD 2 PERIOD 1+2 PERIOD 3 PERIOD 3 PERIOD 1-3 TOTAL PERCENT CATEGORY NUMBER ACTIVE SCH ED TOTAL POP SCHEDULED COMPLETE PERCENT SCHEDULED. COMPLETE PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE B-D B3.120 6
6 100.0%
0 17%
5 0
100%
0 0
100%
0 0.0%
B3.130 0
0 0.0%
0 0
0%
0 0
0%
0 0
0%
0 0.0%
B3.130R 6
6 100.0%
. 3 0
50%
0 0
50%
3 0
100%
0 0.0%
B3.140 6
6 100.0%
3
'O 50%
2 0
83%
0 100%
0 0.0%
B3.150 0
0 0.0%
0 0
0%
0 0
0%
0 0
0%
0 0.0%
B3.150R 4
4 100.0%
0 0
0%
2 0
50%
2 0
100%
0 0.0%
B3.160 0
0 0.0%
0 0
0%
0 0
0%
0 0
0%
0 0.0%
B3.160R 2
2 100.0%
0 0
0%
0 0
0%
2 0
100%
0 0.0%
B3.90 6
6 100.0%
.6 0
100%
0 0
100%
0 0
100%
0 0.0%
CATEGORY TOTAL:
42 42 20 0
14 0
8 0
0 B-F BS.130 23 23 100.0%
5 0
22%
8 0
57%
10
- o 100%
0 0.0%
BS.140 13 13 100.0%
7 0
54%
0
.0
. 54%
6 0
100%
0 0.0%
BS. 150 5
5 100.0%
0 0
0%
0 0
0%
5 0
100%
0 0.0%
BS.40 6
6 100.0%
0 17%
5 0
100%
0 0
100%
0 0.0%
CATEGORY TOTAL:
47 47 13 0
13 0
21 0
0 Report: i3it~p Note: ALL totals based on Active records.
File: sch_item Period totals nust also be Code Credit 11Y11
- Index: key/Exam Category Page nuniber 3
EXAM ITEM TOTAL INT 3 CATEGORY NUMBER ACTIVE SCHED B-G-1 B6.10 54 86.180 4
86.190 4
86.200 4
86.30 54 B6.40 B6.50 54 CATEGORY TOTAL:
175 B-G-2 B7.10 B7.20 B7.30 B7.50 B7.60 B7.70 B7.80 Report: i3itnq:x>p File: sch_item 16 2
4 5
8 27 90 Index: key/Exam Category 54 4
0 4
54 54 171 16 2
4 5
8 27 90 PERCENT TOTAL POP 100.0%
100.0%
0.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
100.0%
PALI SAD THIRD INTERVA PERIOD 1 PERIOD 1 PERIOD 1 SCHEDULED COMPLETE PERCENT 18 0
33%
0 25%
0 0
0%
0 25%
18 0
33%
0 100%
18 0
33%
57 0
0 0
0%
2 0
100%
0 0
0%
0 0
0%
0 0
0%
7 0
26%
32 0
36%
OGRAM PLAN M NUMBER
SUMMARY
PERIOD 2 PERIOD 2 PERIOD 1+2 SCHEDULED COMPLETE PERCENT 18 0
67%
0 50%
0 0
0%
0 50%
18 0
.67%
0 0
100%
18 0
67%
56 0
16 0
100%
0 0
100%
0 0
0%
0 0
0%
4 0
50%
16 0
85%
0 0
36%
06/13/96 PERIOD 3 PERIOD 3 PERIOD 1-3 SCHEDULED COMPLETE PERCENT TOTAL PERCENT COMPLETE COMPLETE 18 0
100%
0 0.0%
2 0
100%
0 0.0%
0 0
0%
0 0.0%
2 0
100%
0 0.0%
18 0
100%
0 0.0%
0 0
100%
0 0.0%
18 0
100%
0 0.0%
58 0
0 0
0 100%
0 0.0%
0 0
100%
0 0.0%
4 0
100%
0 0.0%
5 0
100%
0 0.0%
4 0
100%
0 0.0%
4 0
100%
0 0.0%
58 0
100%
0 0.0%
Note: All totals based on Active records.
Period totals rm.rst also be Code Credit "Y".
Page number 4
PALI SAD OGRAM PLAN 06/13/96
.THIRD INTERVA M NUMBER
SUMMARY
EXAM ITEM TOTAL INT 3 PERCENT PERIOO 1 PERIOO 1 PERIOO 1 PERIOO 2 PERIOO 2 PERIOO 1+2 PERIOO 3 PERIOO 3 PERIOO 1-3 TOTAL PERCENT CATEGORY NUMBER ACTIVE SCH ED TOTAL POP SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE B-G-2 CATEGORY TOTAL:
1S2 1S2 41 0
36 0
75 0
0 B-H B8.10 3
0 o.ox 0
0 ox 0
0 ox 0
0 0
o.ox B8.20 0
o.ox 0
0 ox 0
0 ox 0
0 ox 0
o.ox B8.30 2
2 100.0X 0
SOX 0
0 SOX 0
100X 0
o.ox CATEGORY TOTAL:
6 2
0 0
0 0
0 B-J B9.11 190 so
- 26.3X 11 0
22%
15 0
52X 24 0
100X 0
o.ox B9.11R 10 10 100.0X 0
0 ox 0
0 ox 10 0
100X 0
o.ox B9.12 0
0 o.ox 0
0 ox
- o.
0 ox 0
0 ox 0
o.ox B9.12R 118 25 21.2%
2 0
8X 4
0 24X 19 0
100X 0
!i.OX B9.21 66 19 28.8X 6
0 32%
6 0
63X 7
0 100X 0
o.ox B9.31 6
6 100.0X 2
0 33X 3
0 83X 0
100X 0
o.ox B9.32 6
s 83.3X 0
0 ox s
0 100X 0
0 100X 0
o.ox B9.40 3S2 102 29.0X 17 0
17" 49 0
6SX 36 0
100X 0
o.ox Report: i3itmpop Note: All totals based on Active records.
File: sch_item Period totals rrust also be Code Credit "Y".
Index: key/Exam Category Page number S
EXAM ITEM CATEGORY NUMBER B-J CATEGORY TOTAL:
B-K-1 B10.10 B10.20 CATEGORY TOTAL:
B-L-1 B12.10 B-L-2 B12.20 B-M-1 B12.40 B-M-2 B12.50 Report: i3it"1JOp File: sch_item TOTAL ACTIVE 748 4
16 20 4
4 2
14 Index: key/Exam Category INT 3 PERCENT SCH ED TOTAL POP 217 0
o:ox 0
0.0%
0 25.0%
0 0.0%
50.0%
0 0.0%
PALISAD.OGRAM PLAN THIRD INTERVA M NUMBER
SUMMARY
I PERIOD PERIOD PERIOD 1 PERIOD 2 PERIOD 2 I SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE 38 0
82 0
0
.. 0 0%
0 0
0 0
0%
0 0
0 0
0 0
0 0
0%
0 0
0 0%
0 0
0 0
0%
0 0
0 o*
0%
0 0
06/13/96 PERiOD 1+2 PERIOD 3 PERIOD 3 PERIOD 1-3 TOTAL PERCENT PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE 97 0
0 0
0 0%
0 0;0%
0%
- o 0
0%
0 0.0%
0 0
0 100%
0 0
100%
0 0.0%
0%
0 0
0%
0 0.0%
0%
0 100%
0 0.0%
0 0
0%
0 0.0%
Note: All totals based on Active records.
Period totals rust also be Code Credit "Y".
Page m.anber 6
EXAM ITEM TOTAL INT 3 CATEGORY NUMBER ACTIVE SCH ED B-N-1 B13.10 B-N-2 B13.SO B13.60 CATEGORY TOTAL:
2 2
B-N-3 B13.70 B-0 B14.10 233 6
C-A C1.10 3
2 C1.10R 4
2 C1.20 6
3 C1.30 2
C1.30R 2
Report: i3itrrpop File: sch_item Index: key/Exam* Category PERCENT TOTAL POP 100.0X 100.0X 100.0X 100.0X 2.6X 66.7%
so.ox so.ox so.ox so.ox PALISAD.OGRAM PLAN THIRD INTERVA M NUMBER
SUMMARY
PERIOD 1 PERIOD 1 PERIOD 1 SCHEDULED COMPLETE PERCENT 0
100X.
0 100X 0
100X 2
0 0
100X 0
0 ox 0
0 ox 0
0 ox 2
0 67%
0 0
ox 0
0 ox PERIOD 2 PERIOD 2 PERIOD 1+2 SCHEDULED COMPLETE PERCENT 0
200X 0
0 100X 0
0 100%
0 0
0 0
100X 0
0 ox 0
SOX 0
SOX 0
100X 0
100X 0
0 ox 06/13/96 PERIOD 3 PERIOD 3 PERIOD 1-3 SCHEDULED COMPLETE PERCENT TOTAL PERCENT COMPLETE COMPLETE 0
300X 0
o.ox 0
0 100X 0
o.ox 0
0 100X 0
o.ox 0
0 0
0 0
100X 0
o.ox 6
0 100X 0
o.ox 0
100X 0
o.ox 0
100X 0
o.ox 0
0 100X 0
o.ox 0
0 100X 0
a.ox 0
100X 0
o.ox Note: All totals based on Active records.
Period totals ITl.lst also be Code Credit "Y".
Page number 7
EXAM ITEM CATEGORY NUMBER C-A CATEGORY TOTAL:
C-B C2.21 C2.21R C2.22 CATEGORY TOTAL:
c-c C3.10 C3.20 CATEGORY TOTAL:
c-c#
CC#-NA c-c*
CC*-NA Report: i3it1J1X>p File: sch_item TOTAL ACTIVE 17 12 4
6 22 12 S1 63 11 S6 Index: key/Exam Category INT 3 SCH ED 9
8 2
6 16 6
S1 S7 0
0 PALI SAD THIRD INTERVA PERCENT PERIOD 1 PERIOD 1 PERIOD 1 TOTAL POP SCHEDULED COMPLETE PERCENT 2
0
- 66. 7%
0 13X so.ox 2
0 100X 100.0X 0
17'%
4 0
so.ox 0
0 OX 100.0X 11 0
22X 11*
0 o.ox 0
0 o.ox 0
0
- OX OGRAM PLAN 06/13/96 M NUMBER
SUMMARY
PERIOD 2 PERIOD 2 PERIOD 1+2 PERIOD 3 PERIOO 3 PERIOD 1-3 TOTAL PERCENT SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE 4
0 3
0 0
4 0
63X 3*
0 100X 0
o.ox 0
0 100X 0
0 100X 0
o.ox 2
0 SOX 3
0 100X 0
o.ox 6
0 6
0 0
0 0
6 0
1oox 0
o.ox 2S 0
71X 1S 0
100X 0
o.ox 2S 0
21 0
0 0
0 ox 0
0 ox 0
o.ox 0
0 ox 0
0 ox 0
o.ox Note: All totals based on Active records.
Period totals nust also be Code Credit 11Y11
- Page number 8
PALI SAD OGRAM PLAN 06/13/96 THIRD INTERVA M NUMBER
SUMMARY
EXAM ITEM TOTAL INT 3 PERCENT PERIOD 1 PERIOD 1 PERIOD 1 PERIOD 2 PERIOD 2 PERIOD 1+2 PERIOD 3 PERIOD 3 PERIOD 1-3 TOTAL PERCENT CATEGORY NUMBER ACTIVE SCH ED TOTAL POP SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE C-F-1 CS.11 186 116 62.4X 38 0
33X 30 0
59X.
48 0
100X 0
o.ox CS.12 0
0
. o.ox 0
0 ox 0
0 ox 0
0 ox 0
o.ox C5.12R 31 6
19.4X 0
0 ox 6
.0 100X 0
0 100X 0
o.ox CS.21 94 30 31.9X 12 0
40X 9
0 70X 9
0 100X 0
o.ox CS.30 64 30 46.9X
~o 0
33X 12 0
73X 8
0 100X 0
o.ox CS.41 39 33 84.6X 8
0 24X 12 0
61X 13 0
100X 0
o.ox CATEGORY TOTAL:
414 215 68 0
69 0
78 0
0 C-F-1#
CF1#-NA 4
0 o.ox 0
0 ox 0
0 ox 0
0 ox 0
o.ox C-F-1*
CF1*-NA 1272 0
o.ox 0
0 ox 0
0 ox 0
0 ox 0
o.ox C-F-2 CS.51 69 32 46.4X 8
0 25X 7
0 47X 17 0
100X 0
o.ox
- cs.s2 0
0 o.ox 0
0 ox 0
0 ox 0
0 ox 0
o.ox C5.52R 72 26
.36.1X 3
0 12X 12 0
sax 11 0
100X 0
o.ox CS.81 33 28 84.8X 5
0 18X 8
0 46X 15 0
100X.
0 o.ox Report: i3itq><>p Note: All totals based on Active records.
Fi le: sch_,;item.
Period totals must also be Code Credit 11Y11
- Index: key/Exam Category Page number 9
PALISAD.OGRAM PLAN 06/13/96 THIRD INTERVA M NUMBER
SUMMARY
EXAM ITEM TOTAL INT 3 PERCENT PERIOD 1 PERIOD 1 PERIOD 1 PERIOD 2 PERIOD*2 PERIOD 1+2 PERIOD 3 PERIOD 3 PERIOD 1-3 TOTAL PERCENT CATEGORY NUMBER ACTIVE SCH ED TOTAL POP SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE C-F-2 CATEGORY TOTAL:
174 86 16 0
27 0
43 0
0 C-F-2#
CF2#-NA 24 0
a.ox 0
0 OX 0
0 ox 0
0 ox 0
a.ox C-F-2*
CF2*-NA 136 0
a.ox 0
0 OX 0
0 ox 0
0 ox 0
a.ox D-B D2.20 53 53 100.0X 12 0
23X 21 0
62X 20 0
100X 0
a.ox D2.40 3
3 100.0X 0
33X 0
0 33X 2
0 100X 0
a.ox CATEGORY TOTAL:
56 56 13 0
21 0
22 0
0 F-A F1.10A 102 28 27.5X 11 0
39X 8
0 68X 9
0 100X 0
a.ox F1.10B 23 7
30.4X 3
0 43X 2
0 71X 2
0 100X 0
a.ox F1.10C 26 9
34.6X 5
0 56X 0
67X 3
0 100X 0
a.ox F1.20A 140 28 20.0X 11 0
39X 9
0 71X 8
0 100X 0
a.ox Report:. i3itqx>p Note: ALL totals based on Active records.
Fi Le: sch_ item Period totals rust also be Code. Credit "Y".
Index: key/Exam Category Page nuri>er 10
EXAM ITEM TOTAL CATEGORY NUMBER ACTIVE F-A F1.20A*
12 F1.20B 100 F1.20B*
21 F1.20C 129 F1.20C*
15 F1.30A 144 F1.30B 102 F1.30C 37 F1.40A 25 F1.40B 12 CATEGORY TOTAL:
888 N/A D-PAL 0
N/A 578 CATEGORY TOTAL:
578 Report: i3it~p Fi le: sch_ item Index: key/Exam Category INT 3 PERCENT SCH ED TOTAL POP 0
o.ox 20 20.0X 0
o.ox 25 19.4X 0
o.ox 60 41.7X 15 14.7X 12 32.4X 19 76.0X 6
50.0%
229 0
o.ox 0
o.ox 0
PALISAD~OGRAM PLAN THIRD INTERVA M NUMBER
SUMMARY
PERIOD 1
- PERIOO 1 PERIOO 1 PERIOO 2 PERIOO 2 SCHEDULED COMPLETE PERCENT SCHEDULED COMPLETE 0
0 OX 0
0' 7
0 35X 5
0 0
0 OX 0
0 6
0 24X 11 0
0 0
OX 0
0 13 0
22X 26 0
4 0
27X 7
0 5
0 42X 2
0 2
0 11X 3
0 0
0 0%
0 0
67 0
74 0
0 0
OX 0
0 0
0 OX 0
0 0
0 0
0 06/13/96 PERIOD 1+2 PERIOD 3 PERIOD 3 PERIOO 1-3 TOTAL PERCENT PERCENT SCHEDULED COMPLETE PERCENT COMPLETE COMPLETE ox 0
0 ox 0
o.ox 60X 8
0 100X 0
o.ox ox 0
0 ox 0
o.ox 68X 8
0 100X 0
o.ox ox 0
0 ox 0
o.ox 65X 21 0
100X 0
o.ox 73X 4
0 100X 0
o.ox 58X 5
0 100X 0
o.ox 26X 14 0
100X 0
o.ox ox 6
0 100%
0 0.0%
88 0
0 ox 0
0 ox 0
o.ox ox 0
0 ox 0
o.ox 0
0 0
Note: All totals based on Active records.
Period totals must also be Code Credit "Y".
Page number 11
EXAM ITEM TOTAL INT 3 CATEGORY NUMBER ACTIVE SCHED GRAND TOTAL:
5274 Report: i3it~p Fi Le: sch_ item Index: key/Exam Category 1403 PERCENT TOTAL POP PALIS
. THIRD INTERVA PERIOD 1 PERIOD 1 PERIOD 1 SCHEDULED COMPLETE PERCENT 381 a
OGRAM PLAN M NUMBER
SUMMARY
PERICO 2 PERIOD 2 PERIOD 1+2 SCHEDULED COMPLETE PERCENT 435 a
PERIOD 3 PERICO 3 PERICO 1-3 SCHEDULED COMPLETE PERCENT 545 a
06/13/96 TOTAL PERCENT COMPLETE COMPLETE a
Note: ALL totals based on Active records.
Period totals lll.ISt also be Code Credit "Y".
Page number 12
ATTACHMENT 3 CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION INSERVICE INSPECTION PROGRAM REVISED SECTION 8
ATTACHMENT: - Page(s) 1-49 SECTION 8 INTERVAL 3, ISi PROGRAM CATEGORY/ITEM NUMBER SCHEDULED EXAMINATIONS BY PERIOD 55
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID AUG MP-4.0 10 10 OVERLAY 2
2 RG-1.14 4
4 T8-4.12 28 28 eport: piir_ 3 File: sch item Index: key-=-Exam Cat FWS-3-AWS-lSl-PIPE FWS-3-AW8-181-258 FW8-3-AW8-181-259 FWS-3-AW8-181-260 FWS-3-AW8-281-PIPE FWS-3-AW8-281-253 FWS-3-AW8-281-254 FW8-3-AW8-281-255 FW8-4-AW8-181-257 FWS-4-AWS-281-252 Period Totals:
E8S-24-8I8-8Hl-207 E8S-24-SI8-8H2-207 Period Totals:
PCS-72-RCL-lA PC8-72-RCL-1B PC8-72-RCL-2A PCS-72-RCL-2B Period Totals:
FW8-18-FWL-181-241 FW8-18-FWL-181-242 FWS-18-FWL-181-244 FWS-18-FWL-181-245 FWS-18-FWL-281-242 FW8-18-FWL-281-243 FWS-18-FWL-2Sl-244 M88-36-M8L-281-218LU M88-36-M8L-281-218LDI M88-36-M8L-281-218LDO M8S-36-M.8L-281-219LUI Page 1 Pl 1
1 1
1 1
1 1
1 1
1 10 1
1 2
1 1
1 1
4 --
1 1
P2 2
2 2
2 2
2 2
2 2
2 10 --
2 2
2 2
2 2
2 --
4 --
2 2
2 P3 3
3 3
3 3
3 3
3 3
3 10 --
3 3
2 3
3 3
3 4 --
3 3
3 3
3 3
PIIR Rev. 1
ATEGORY ITEM NO AUG TS-4.12
-A Bl.11 Bl.1~
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE 28 28 3
3 9
9 REFERENCE ID MSS-36-MSL-2Sl-219LUO MSS-36-MSL-2S1-219LD M88-36-M8L-1Sl-216 M88-36-M8L-181-217 M88-36-M8L-281-218 M88-36-M8L-281-219 M88-6-RVR-1S4-203 M88-6'-RVR-284-203 M88-6-RVR-286-203 MS8-8-M8V-181-209 M88-8-M8V-181-212 M88-36-M8L-181-216LU M88-36-M8L-181-216LDI M88-36-M8L-181-216LDO M88-36-M8L-181-217LUI M88-36-M8L-1Sl-217LUO M88-36-M8L-181-217LD 10:-112 8-112 9-112 l-112A 1-112B 1-112C 2-112A 2-112B 2-112C 3-112A 3-112B 3-112C Period Totals:
Period Totals:
Period *Totals:
eport: piir 3 File: sch Item Index: key~Exam Cat Page 2 Pl 1
1 1
1 1
7 --
1 1
1 3
1 1
1 1
1 1
1 1
1 9 --
P2 P3 2
2 3
3 2
3 3
3 3
3 3
3 6
15 0
0 0
0 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY B-A POPULATION ITEM NO INT BASE Bl.21 1
Bl. 21R 0
Bl. 22 6
Bl.22R 6
Bl. 30 1
eport: piir 3 File: sch Item Index: key~Exam Cat 1
1 6
6 1
REFERENCE ID 4-113 l-118A l-118B l-118C l-118D l-118E l-118F l-113A l-113B 1-113~
l-113D l-113E l-113F 7-112 Page 3 Period Totals:
Period Totals:
Period Totals:
Period Totals:
Period Totals:
Pl 1
1 0
0 1
1 1
1 1
.1 6
1 1
P2
- o 0
0 0
0 P3 0
0 3
3 3
3 3
3 6
0 0
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE B-A Bl.40 0
Bl.40R 1
B-B B2.ll 0
B2.11R 2
B2.12 2
B2.21 eport: piir 3 File: sch Item Index: key~Exam Cat 0
1 0
2 4
1 REFERENCE ID 6-118A 3-982 5-988 2-982A 2-982C 2-983 Page 4 Period Totals:
Period Totals:
Period Totals:
Period Totals:
Period Totals:
Period Totals:
Pl P2 P3 0
0 0
1 2
3 1
1 1
0 0
0 1
2 1
1
' 0 3
2 0
1 1
3 0
0 1
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD ATEGORY B-B POPULATION ITEM NO' INT BASE B2.21R 0
B2.22 0
B2.22R 8
B2.31 2
B2.32 1
eport: piir 3 File: sch Item Index: key~Exam Cat 1
0 8
4 10 REFERENCE ID l-983A l-983B l-983C 1-9830 l-984A l-984B l-984C 1-9840 1-1404-271 1-101-251 l:-101-254A Page 5 Period Totals:
Period Totals:
Period Totals:
Period Totals:
Period Totals:
Pl 0
0 1
1 1
1 4 --
0 1
1 P2 0
0 2
2 2
2 4 --
o*
0 P3 0
0 0 --
3 3
2 0
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
~.ATEGORY POPULATION ITEM NO INT BASE REFERENCE ID B2.40 1
B2.51 2
B2.80 2
B-D B3.100 6
B3.110 0
B3.110R 6
.eport: piir_3 File: sch item Index: key-=-Exam Cat 2
2 6
0 6
1-1402-271 E-56A-04 E-56B-04 E-56A-03 E-56B:-03 5-114A-IRS 5-114B-IRS 5-114C-IRS 5..:.114D.,.IRS 5-114E"'-IRS 5-114F-IRS 1-986 Page 6 Period Totals:
Period Totals:
Period Totals:
Period Totals:
Period Totals:
Pl 0
1 1
2 1
1 2
1 1
1 1
1 1
6 0
P2 0
0 0
0 0
2 PIIR P3 3
1 3
3 2
3 3
2 0
0 Rev. 1
ATEGORY B-D ITEM NO B3.110R B3.120 B3.130 PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE REFERENCE ID 6
6 3-985 8-986 8-986A 8-986B 8-986C Period Totals:
6 6
1-986-IRS 3-985-IRS 8-986-IRS 8-986A-IRS 8-986B-IRS 8-986c.:.IRS Period Totals:
0 0
Period Totals:
B3.130R 6
6 1-104-251 1-102-251A 1-102-251B 2-104-351 2-102-351A 2-102-351B Pl 1
1 --
1 1 --
0 1
1 1
Period Totals:
3 P2 2
2 2
2 5 --
2 2
2 2
2 5 --
0 0
P3 0
0 --
0 3
3 3
3
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY POPULATION ITEM NO INT BASE REFERENCE ID B-D B3.140 6
B3.150 0
B3.150R 4
B3.160 0
B3.160R 2
B3.90 6
eport: piir_ 3
'File: sch item Index: key-=-Exam Cat 6
0 4
0 2
6 l-102-251B-IRS 2-104-351-IRS 2-102-351A-IRS 2-102-351B-IRS Period Totals:
Period Totals:
E-S6A-05 E-56A-07 E-56B-05 E-56B-07 Period Totals:
Period Totals:
E-56A-05-IRS E-56B-05-IRS Period Totals:
5-114A Page 8 Pl 1
1 1 --
3 --
0 0
0 0
1 P2 2
2 --
0 2
2 2
0 0
P3 1 --
0.
3 3
2 0
3 3
2 PIIR Rev. 1
ATEGORY ITEM NO B-D B3.90 B-F B5.130 B5.140 eport: piir_ 3 File: sch item PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE REFERENCE ID 6
6 5-114B 5-114C 5-114D 5-114E 5-114F Period Totals:
23 23 PCS-12-PSL-lHl-2 PCS-12-PSL-lHl-7 PCS-12-PSL-lHl-8 PCS-12-SCS-2Hl-l PCS-12-SCS-2Hl-2 PCS-12-SIS-lAl-ll PCS-12-SIS-lAl-12 PCS-12-SIS-lBl-15 PCS-12-SIS-lBl-16 PCS-12-SIS-2Al-14 PCS-12-SIS-2Al-15 PCS-12-SIS-2Bl-14 PCS-12-SIS-2Bl-15 PCS-30-RCL-lA-7 PCS-30-RCL-lA-9 PCS-30-RCL-lB-7 PCS-30-RCL-lB-9 PCS-30-RCL-2A-10 PCS-30-RCL-2A-8 PCS-30-RCL-2B-7 PCS-30-RCL-2B-9 PCS-4-PRS-lPl-lA PCS-4-PSS-lPl-20 Period Totals:.
13 13 CVC-2-CHL-lAl-17 PCS-2-CHL-2Al-48 PCS-3-PSS-lBl-l PCS-3-PSS-2Al-l PCS-30-RCL-lA-ll/2 PCS-30-RCL-lA-5/2 Index: key:-Exam Cat Page 9 Pl P2 P3 1
1 1
1 1
6 0
0 1
2 3
1 2
3 1
2 3
1 2
3 1
2 3
2 2
1
.1 3
3 2
2 3
3 2
2 3
3 3
3 2
l 2
3 8
13 14 1
3 1
1 1
3 PIIR Rev. 1
ATEGORY ITEM NO B-F B5.140 B5.150 B5.40 B-G-1 B6.10 eport: piir_3 File:* sch item PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE 13 13 5
5 6
6 54 54 REFERENCE ID PCS-30-RCL-lB-10/3 PCS-30-RCL-lB-5/2 PCS-30-RCL-2A-11/2 PCS-30-RCL-2A-11/3 PCS-30-RCL-2A-5/2 PCS-30-RCL-2B-5/2 PCS-42-RCL-lH-3/2 Period Totals:
PCS-2-DRL-lAl-l PCS-2-DRL-lBl-l PCS-2-DRL-lHl-l PCS-2-DRL-2Al-l PCS-2-LDL-2Bl-l Period Totals:
PCS-12-PSL-lHl-1 PCS-4-PRS-lPl-l'
.PCS-4 -PSS-lPl-21 PCS-6,.PRS-lAl-1 PCS-6-PRS-lBl-1 PCS-6-PRS-lCl-l Period Totals:
RPVCH S/N 01 NUT RPVCH S/N 10 NUT RPVCH S/N 11 NUT RPVCH S/N 12 NUT RPVCH S/N 13 NUT RPVCH S/N 14 NUT RPVCH S/N 15 NUT RPVCH S/N* 16 NUT RPVCH S/N 17 NUT Index: key-=-Exam Cat Page 10 Pl 1
1 1
7 --
0 1
1 2 --
1 1
1 1
1 1
1 1
1 P2 0
0 2
2 2
2 2
2 6 --
P3 3
3 3
3 6 --
3.
3 3
3 3
5 3
3 2 --
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT B-G-1 B6.10 54 eport: piir 3 File: sch Item Index: key~Exam Cat BASE 54 REFERENCE RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N Page 11 ID 18 NUT 19 NUT 02 NUT 20 NUT 21 NUT 22 NUT 23 NUT 24 NUT 25 NUT 26 NUT 27 NUT 28 NUT 29 NUT 03 NUT 30 NUT 31 NUT 32 NUT 33 NUT 34 NUT 35 NUT 36 NUT 37 NUT 38 NUT 39 NUT 04 NUT 40 NUT 41 NUT 42 NUT 43 NUT 44 NUT 45 NUT 46 NUT 47 NUT 48 NUT 05 NUT 5P NUT 51 NUT 52 NUT 53 NUT 54 NUT 06 NUT 07 NUT 08.NUT 09 NUT 49 NUT Pl P2 P3 1
2 1
2 2
2 2
2 2
2 2
2 2
1 2
2 2
2 2
2
- 2.
3 3
3 1
3 3
3 3
3 3
3 3
3 1
3 3
3 3
3 1
1 1
1 3
PIIR Rev. 1
.ATEGORY B-G-1 B-G-1 ITEM NO B6.10 B6.180 B6.190 B6.200 B6.30
.eport: piir_3 File: sch item PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE 4
4 0
4 4
4 54 54 REFERENCE ID Period Totals:
lA-lBT-S-1-16-0N lB-lBT-S-1-16-0N 2A-1BT-S-1-16-0N 2B-1BT-S-l-16-0N Period Totals:
Period Totals:
lA-lBT-N-1-16-0N lB-lBT-N-1-16-0N 2A-1BT~N-1~16-0N 2B-1BT-N-1-16-0N Period Totals:
RPVCH S/N 01 STUD RPVCH S/N 10 STUD RPVCH S/N 11 STUD RPVCH S/N 12 STUD RPVCH S/N 13 STUD RPVCH S/N 14 STUD RPVCH S/N 15 STUD RPVCH S/N 16 STUD RPVCH S/N 17 STUD RPVCH S/N 18 STUD Index: key:-Exam Cat Page 12 Pl P2 P3 18 18 18 3
3 1
2 1
1 2
0 0
0 3
3 1
2 1
1 2
1 1
1 1
1 1
1 1
1 1
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT B-G-1 B6.30 54 eport: piir 3 File: sch Item Index: key~Exarn Cat BASE 54 REFERENCE RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N
.RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N RPVCH S/N Page 13 ID 19 STUD 02 STUD 20 STUD 21 STUD 22 STUD 23 STUD 24 STUD 25 STUD 26 STUD 27 STUD 28 STUD 29 STUD.
03 STUD 30 STUD 31 STUD 32 STUD 33 STUD 34.STUD 35 STUD 36 STUD 37 STUD 38 STUD 39 STUD 04 STUD 40 STUD 41 STUD 42 STUD 43 STUD 44 STUD 45 STUD 46 STUD 47 STUD 48 STUD 05 STUD so STUD 51 STUD 52 STUD 53 STUD 54 STUD 06 STUD 07 STUD 08 STUD 09 STUD 49 STUD Pl P2 P3 2
1 2
2 2
2 2
2 2
2 2
2 1
2 2
2 2
2 2
2 3
3 3
1 3
3 3
3 3
- 3 3
3 3
1 3
3 3
3 3
1 1
1 1
3 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID B-G-1 B6.30 Period Totals:
B-G-1 B6.40 1
1 RPV-LIGAMENTS Period Totals:
B6.50 54 54 RPVCH S/N 03 WASHER RPVCH S/N 01 WASHER RPVCH S/N 10 WASHER RPVCH S/N 11 WASHER RPVCH S/N J,.2 WASHER RPVCH S/N 13 WASHER RPVCH S/N 14 WASHER RPVCH S/N 15 WASHER RPVCH S/N 16 WASHER RPVCH S/N 17 WASHER RPVCH S/N 18 WASHER RPVCH S/N 19 WASHER RPVCH S/N 02 WASHER RPVCH S/N 20 WASHER RPVCH S/N 21 WASHER RPVCH S/N 22 WASHER RPVCH S/N 23 WASHER RPVCH S/N 24 WASHER RPVCH S/N 25 WASHER RPVCH S/N 26 WASHER RPVCH S/N 27 WASHER RPVCH S/N 28 WASHER RPVCH S/N 29 WASHER RPVCH S/N 30 WASHER RPVCH S/N 31 WASHER RPVCH S/N 32 WASHER RPVCH S/N 33 WASHER RPVCH S/N 34 WASHER RPVCH S/N 35 WASHER RPVCH S/N 36 WASHER
- RPVCH S/N 37 WASHER RPVCH S/N 38 WASHER
.eport: piir_3 File: sch item Index: key-:-Exam Cat Page 14 Pl P2 P3 18 18 18 1
1 0
0 1
1 1
1 1
1 1
1 1
1 1
2 1
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 3
3 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPuLATION ATEGORY ITEM NO INT B-G-1 B6.50 54 B-G-2 B7.10 16 eport: piir 3 File: sch Item Index: key~Exam Cat BASE 54 16 REFERENCE ID RPVCH S/N 39 WASHER RPVCH S/N 04 WASHER RPVCH S/N 40 WASHER RPVCH S/N 41 WASHER RPVCH S/N 42 WASHER RPVCH S/N 43 WASHER RPVCH S/N 44 WASHER RPVCH S/N 45 WASHER RPVCH S/N 46 WASHER RPVCH S/N 47 WASHER RPVCH S/N 48 WASHER RPVCH S/N 49 WASHER RPVCH S/N 05 WASHER RPVCH S/N 50 WASHER RPVCH S/N 51 WASHER RPVCH S/N 52 WASHER RPVCH S/N 53 WASHER RPVCH S/N 54 WASHER RPVCH S/N 06 WASHER RPVCH S/N 07 WASHER*
RPVCH S/N 08 WASHER RPVCH S/N 09 WASHER Period Totals:
RPVCH PENT NO 46 BLT RPVCH PENT NO 46 NUT RPVCH PENT NO 47 BLT RPVCH PENT NO 47 NUT RPVCH PENT NO 48 BLT RPVCH PENT NO 48 NUT RPVCH PENT NO 49 BLT RPVCH PENT NO 49 NUT RPVCH PENT NO 50 BLT RPVCH PENT NO 50 NUT RPVCH PENT NO 51 BLT RPVCH PENT NO 51 NUT RPVCH PENT NO 52 BLT RPVCH PENT NO 52 NUT RPVCH PENT NO 53 BLT RPVCH PENT NO 53 NUT Page 15 Pl P2 P3 3
1 3
3 3
3 3
3 3
3 3
3 1
3 3
3 3
3 1
1 1
1 18 18 18 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID B-G-2 B7.10 B-G-2 B7.20 2
B7.30 4
B7.50
.5 B7.60 8
.eport: piir_ 3 File: sch item Index: key:-Exam Cat 2
4 5
8 Period Totals:
T-72 S/N 1-20N T-72 S/N 1-20S Period Totals:
PRIMARY MANWAY #1 STUDS PRIMARY MANWAY #2 STUDS PRIMARY MANWAY # 1 PRIMARY MANWAY # 2 Period Totals:
PCS-4-PRS-1P2-3BT PCS-4-PRS-1P3-8BT PCS-6-PRS-lAl-lBT PCS-6-PRS-lBl-lBT PCS-6-PRS-lCl-lBT Period Totals:
1A-2BT-B-l-16 1A-2BT-W-1-16 1B-2BT-B-1-16 1B-2BT-W-l-16 2A-2BT-B-l-16 2A-2BT-W-1-16 2B-2BT-B-1-16 2B-2BT-W-1-16 Page 16 Pl 0
1 1
2 0
0 f 2 16 0
P3 0
0 3
3 3
3 0
4 0
2 2
2 2
3 3
3 3
3 5
3 3
3 3
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOB POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID B-G-2 B7.60 8
8 Period Totals:
B-G-2 B7.70 27 27 MV-2198-BT MV-2225-BT CV2113-BT CV2001-BT CV2002-BT CV2115-BT CV2117-BT CK3101-BT CK3102-BT CK3103-BT CK3116-BT CK3117-BT CK3118-BT CK3131-BT CK3132'-BT CK3133-BT CK3146-BT CK3147-BT CK3148-BT M03015-BT M03016-BT MV-1172-BT MV-1173-BT MV-1174-BT MV-1175-BT CV1057-BT CV1059-BT Period Totals:
B7.80 90 90 CRDM NO. 01 CRDM NO. OlN CRDM NO. 10 CRDM NO. lON CRDM NO. 11 CRDM NO. llN
.eport: piir_3 File: sch item Index: key-=-Exam Cat Page 17 Pl P2 P3 0
4
- 4 2
2 2
2 2
2 2
2 1
2 2
3 3
.3 1
1 1
1 1
.1 3
2 2
2 2
2 2
7 16 4
3 3
3 3
3 3
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY POPULATION ITEM NO INT BASE REFERENCE ID Pl P2 P3 B-G-2 B7.80 90 90 CRDM NO. 12 3
CRDM NO. 12N 3
CRDM NO. 13 1
CRDM NO. 13N 1
CRDM NO. 14 1
CRDM NO. 14N 1
CRDM NO. 15 1
CRDM NO. 15N 1
CRDM NO. 16 1
CRDM NO. 16N 1
CRDM NO. 17 1
CRDM NO. 17N 1
CRDM NO. 18 1
CRDM NO. 18N 1
CRDM NO. 19 1
CRDM NO. 19N 1
CRDM NO. 02 3
CRDM NO. 02N 3
CRDM NO. 20 1
CRDM NO. 20N 1
. CRDM NO. 21 1
CRDM NO. 21N
- 1 CRDM NO. 22 1
CRDM NO. 22N 1
CRDM NO. 23 1
CRDM NO. 23N 1
CRDM NO. 24 1
CRDM NO. 24N 1
CRDM NO. 25 3
CRDM NO. 25N 3
CRDM NO. 26 3
CRDM NO. 26N 3
CRDM NO. 27 3
CRDM NO. 27N 3
CRDM NO. 28 3
CRDM NO. 28N 3
CRDM NO. 29 3
CRDM NO. 29N 3
CRDM NO. 03.
3 CRDM NO. 03N 3
CRDM NO. 30 3
CRDM NO. 30N 3
CRDM NO. 31 3
CRDM NO. 31N 3
CRDM NO. 32 3
CRDM NO. 32N 3
CRDM NO. 33 3
CRDM NO. 33N 3
.eport: piir_3 File: sch item Index: key-=-Exam Cat Page 18 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY POPULATION ITEM NO INT B-G-2 B7.80 90 B-H B8.10 0
eport: piir 3 File: sch Item Index: key~Exam Cat BASE 90 3
REFERENCE ID CRDM NO. 34 CRDM NO. 34N CRDM NO. 35 CRDM NO. 35N CRDM NO. 36 CRDM NO. 36N CRDM NO. 37 CRDM NO. 37N CRDM NO. 38 CRDM NO. 38N CRDM NO. 39 CRDM NO. 39N CRDM NO. 04 CRDM NO. 04N CRDM NO. 40 CRDM NO. 40N CRDM NO. 41 CRDM NO. 41N CRDM NO. 42 CRDM NO. 42N CRDM NO. 43 CRDM NO. 43N CRDM NO. 44 CRDM NO. 44N CRDM NO. 45 CRDM NO. 45N CRDM NO. 05 CRDM NO. 05N CRDM NO. 06 CRDM NO. 06N CRDM NO. 07 CRDM NO. 07N CRDM NO. 08 CRDM NO. 08N CRDM NO. 09 CRDM NO. 09N Period Totals:
Page 19 Pl, P2 P3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 1
1 1
1 1
1 1
1 3
3 3
3 3
3
- 3 3
3 3
32 0
58 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID B-H B8.10 B-H B8.20 0
1 BB. 30 2
2 B-J B9.11 so 190
.eport: piir_}
File: sch item Index: key-=-Exam Cat 1-110-251 2-110-351 Period Totals:
Period Totals:
Period Tot.als:
ESS-12-SIS-2Al-12 ESS-6~SIS-1Al-ll ESS-6-SIS-lAl-12 ESS-6-SIS-lAl-13
. ESS-6-SIS-lBl-12 ESS-6-SIS-lBl-14 ESS-6-SIS-lBl-4 ESS-6-SIS-lBl-9 ESS-6-SIS-2Al-12 ESS-6-SIS-2Al-16 ESS-6-SIS-2Al-21 ESS-6-SIS-2Al-5 ESS-6-SIS-2Bl-10 ESS-6-SIS-2Bl-17 ESS-6-SIS-2Bl-22 ESS-6-SIS-2Bl-25 ESS-6-SIS-2Bl-27 ESS-6-SIS-2Bl-5 ESS-6-SIS-2Bl-6 PCS-12-PSL-lHl-3 PCS-12-SCS-2Hl-ll PCS-12-SCS-2Hl-6 Page 20 Pl P2 P3 0
0 0
0 0
0 3
1 1
0 1
3 2
2 2
- 3.
3 2
3 3
3 3
1 2
1 2
2 2
1 1
1*
2 3
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE B-J B9.11 50 190 B9.11R 10
- 10 eport: piir 3 File: sch Item Index: key-Exam Cat REFERENCE ID PCS-12-SCS-2Hl-7 PCS-12-SCS-2Hl-8 PCS-30-RCL-lA-1 PCS-30-RCL-lA-8 PCS-30-RCL-lB-1 PCS-30-RCL-lB-6 PCS-30-RCL-lB-8 PCS-30-RCL-2A-1 PCS-30-RCL-2A-2 PCS-30-RCL-2A-9 PCS-3 O-RCL-2B-1*
PCS-30-RCL-2B-4 PCS-30-RCL-2B-8 PCS-4-PRS-lPl-3 PCS-4-PRS-lPl-4 PCS-4-PRS-1P2-2 PCS-4-PRS-1P2-3 PCS-4-PRS-1P3-1 PCS-4-PRS-1P3-2 PCS-4-PRS-1P3-3 PCS-4-PSS-lPl-1 PCS-4-PSS-iPl-12 PCS-4-PSS-lPl-15 PCS-42-RCL-lH-2 PCS-42-RCL-lH-6 PCS-42.-RCL-2H-2 PCS-42-RCL-2H-4 PCS-42-RCL-2H-6 Period PCS-30-RCL-lA-15 PCS-30-RCL-lA-16 PCS-30-RCL-lB-13 PCS-30-RCL-lB-14 PCS-30-RCL-2A-14 PCS-30-RCL-2A-15 PCS-30-RCL-2B-14 PCS-30-RCL-2B-15 PCS-42-RCL-lH-1 PCS-42-RCL-2H-1 Page 21 Total$:
Pl 1
1 1
1 1
1 11 --
P2 2
2 2
2 2
2
- 15 P3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3, 24 --
3 3
3 3
3 3
3 3
3 3
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE B-J B9. llR B-J B9.12 0
B9.12R 25 eport: piir 3 File: sch Item Index: key~Exam Cat 0
118 REFERENCE ID Period Totals:
Period Totals:
PCS-30-RCL-lA-lSLDl PCS-30-RCL-1A-15LD2 PCS-30-RCL-1A-16LU1 PCS-30-RCL-1A-16LU2 PCS-30-RCL-1B-13LD1 PCS-30-RCL-1B-13LD2 PCS-30-RCL-1B-14LU1 PCS-30-RCL-1B-14LU2 PCS-30-RCL-1B-6LU PCS-30-RCL-2A-14LD1 PCS-30-RCL-2A-14LD2 PCS-30-RCL-2A-15LU1 PCS-30-RCL-2A-15LU2 PCS-30-RCL-2A-2LD1 PCS-30-RCL-2A-2LD2 PCS-30-RCL-2B-14LD1 PCS-30-RCL-2B-14LD2 PCS-30-RCL-2B-15LU1 PCS-30-RCL-2B-15LU2 PCS-30-RCL-2B-4LD1 PCS-30-RCL-2B-4LD2 PCS-30-RCL-2B-4LU PCS-42-RCL-2H-4LD1 PCS~42-RCL-2H-4LD2 PCS-42-RCL-2H-4LU Period Totals:
Page 22 Pl P2 P3 0
0 10 0
0 0
3 3
3 3
3 3
3 3
2 3
3 3
3 1
1 3
3 3
3 2
2 2
3 3
3 2
4 19 PIIR Rev. 1
ATEGORY ITEM NO B9.21 B9.31 B9.32 PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE 19 66 6
6 5
6 REFERENCE ID CVC-2-PSS-1Pl-22A ESS-2.5-SIS-lBl-18 ESS-2.5-SIS-2Al-17 ESS-2.5-SIS-2Bl-17 ESS-2.5-SIS-2Bl-18 ESS-2-LTC-lB-19 PCS-3-PSS-1Bl-14A PCS-3-PSS-lBl-18 PCS-3-PSS-iBl-21 PCS-3-PSS-lBl-3 PCS-3-PSS-lBl-7 PCS-3-PSS-lBl-8 PCS-3-PSS-2Al-13 PCS-3-PSS-2Al-14 PCS-3-PSS-2Al-19 PCS-3-PSS-2Al-20 PCS-3-PSS-2A1..:.22 PCS-3-PSS-2Al-5A PCS-3-PSS-2Al-5B Period Totals:.
PCS-30-RCL-lA-11/12 PCS-30-RCL-lB-10/12 PCS-30-RCL-2A-11/12 PCS-30-RCL-2B~I0/12 PCS-42-RCL-lH-3/12 PCS-42-RCL-2H-3/12 Period Totals:
ESS-6-SIS-lAl-3/2 ESS-6-SIS-lBl-3/2 ESS-6-SIS-2Al-4/2 ESS-6-SIS-2Bl-4/2 PCS-4-PSS-lPl/2
- eport: piir 3 File: sch Item Index: key~Exam Cat Page 23 Pl 1
1 1
1 1
1 6 --
1 1
2 --
P2 2
2 2
2 2
2 6 --
2 2
2 3 --
2 2
2 2
2 P3
- 3 3
3 3
3 3
j --
7 --
3 1 --
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID B-J B9.32 Period Totals:
B-J B9.40 102 352 CVC-2-CHL-lAl-13 CVC-2-CHL-lAl-4 CVC-2-CHL-lAl-5 CVC-2-CHL-lAl-9 CVC-2-CHL-1A2-1B.
CVC-2-CHL-1A2-4 CVC-2-CHL-2Al-1 CVC-2-CHL-2Al-10 CVC-2-CHL-2Al-12 CVC-2-CHL-2Al-14 CVC-2-CHL-2Al-2 CVC-2-CHL-2Al-20 CVC-2-CHL-2Al-23 CVC-2-CHL-2Al-3 CVC-2-CHL-2Al-43 CVC-2-CHL-2Al-46 CVC-2-LDL-2Bl-23 CVC-2-LDL-2Bl-24 CVC-2-LDL-2Bl-25 CVC-2-LDL-2Bl-26 CVC-2-LDL-2Bl-29 CVC-2-LDL-2Bl-30 CVC-2-LDL-2Bl-31 CVC-2-LDL-2Bl-32 CVC-2-LDL-2Bl-33 CVC-2-LDL-2B2-10 CVC-2-LDL-2B2-17 CVC-2-LDL-2B2-18 CVC-2-LDL-2B2-23 CVC-2-LDL-2B2-24 CVC-2-LDL-2B2-28 CVC-2-LDL-2B2-29 CVC-2-LDL-2B2-35 CVC-2-LDL-2B2-36 CVC-2-LDL-2B2-9 CVC-2-LDL-2B3-2 CVC-2-LDL-2B4-2 CVC-2-LDL-2B5-2 CVC-2-PSS-lPl-1 eport: piir_ 3 File: sch item Index: key-=-Exam Cat Page 24 Pl P2 P3 0
5 0
2 2
2 2
2 2
1 2
2 2
1 2
2 1
3 3
3 3
3
- 3 1
1 1
2 2
2 2
2 3
3 3
3 2
2 2
2 2
2 3
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID Pl P2 P3 B-J B9.40 102 352 CVC-2-PSS-lPl-10 3
CVC-2-PSS-lPl-14 3
CVC-2-PSS-lPl-19 1
CVC-2-PSS-lPl-2 2
CVC-2-PSS-lPl-20 1
CVC-2-PSS-lPl-23 3
CVC-2-PSS-lPl-25 2
CVC-2-PSS-lPl-28 3
CVC-2-PSS-lPl-3 2
CVC-2-PSS-lPl-30 3
CVC-2-PSS-lPl-4 2
CVC-2-PSS-lPl-45 2
CVC-2-PSS-lPl-49 2
CVC-2-PSS-lPl-6 3
PCS-2-CHL-2Al-47 3
ESS-2.5-SIS-lAl-19 3
ESS-2.5-SI$-1Bl-15 2
ESS-2-LTC-lA-'18 2
ESS-2-LTC-lA-21 2
ESS-2-LTC-lB-16 1
ESS-2-LTC-lB-20 1
ESS-2-LTC-iB-28 2
ESS-2-LTC-lB-32 2
ESS-2-LTC-lB-33 2
ESS-2-LTC-lB-35 3
ESS-2-LTC-lB-36 3
ESS-2-LTC-lB-40 3
ESS-2-SIS-lAl-15 3
ESS-2-SIS-lAl-4 2
ESS-2-SIS-lAl-6 2
ESS-2.-SIS-lAl-7 2
r ESS-2-SIS-1A2-4 3
ESS-2-SIS-lBl-ll 1
ESS-2-SIS-lBl-12 1
ESS-2-SIS-lBl-14 3
ESS-2-SIS-lBl-7 3
ESS-2-SIS-2Al-ll 2
ESS-2-SIS-2Al-19 3
ESS-2-SIS-2Al-5 3
ESS-2-SIS-2Al-9 2
ESS-2-SIS-2Bl-14 3
ESS-2-SIS-2Bi-15 3
ESS-2-SIS-2Bl-5 1
PCS-2-DRL-lAl-4 2
PCS-2-DRL-lAl-7 3
PCS-2-DRL-lAl-8 3
PCS-2-DRL-lBl-5 3
PCS-2-DRL-lBl-7 3
eport: piir_3 File: sch item Index: key-=-Exam Cat Page 25 PIIR Rev. 1
.ATEGORY ITEM NO B-J B9.40
-K-1 Bl0.10 Bl0.20 B-L-1 B12.10 B-L-2 B12.20 eport: piir_ 3 File: sch item PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE REFERENCE ID 102 352 PCS-2-DRL-lHl-3 PCS-2-DRL-lHl-5 PCS-2-DRL-2Al-5 PCS-2-DRL-2Al-7 PCS-2-DRL-2Bl-1 PCS-2-DRL-2Bl-2 PCS-2-DRL-2Bl-4 PCS-2-LDL-2Bl-15 PCS-2-LDL-2Bl-17 PCS-2-LDL-2Bl-3 PCS-2-LDL-2Bl-4 PCS-2-PSS-lPl-54 PCS-2-PSS-lPl-55 RWS-2-DRL-lHl-11 RWS-2-DRL-lHl-16 Period Totals:
0 4
Period Totals:
0 16 Period Totals:
1 4
lA-02 Period Totals:
0 4
Index: key-:=-Exam Cat Page 26 Pl P2 P3 2
2 2
2 2
2 2
1 1
3 3
1 3
1 3
2 2
17 49 38 0
0 0
0 0
0 2
0 1
0 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY B-L-2 B-M-1 B-M-2 B-N-1
. B-N-2 POPULATION ITEM NO INT BASE B12.20 B12.40 1
2 B12.50 0
- .. 14 B13.10 1
1 B13.50 1
1 B13.60 1
1 eport: piir 3 File: sch Item Index: key~Exam Cat REFERENCE ID Period Totals:
M03016-WELD Period Totals:
Period Totals:
RPV-VESSEL INTERIOR Period Totals:
RPV WELDED Period Totals:
RPV-WELD ATTACHMENT Period Totals:
Page 27 Pl P2 P3 0
0 0
3 0
0 1
0 0
0 1
2 3
1 1
- 1.
1 1
0 0
1 1
0
- o.
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE B-N-3 B13.70 1
B-0 B14.10.
6
-A Cl.10 2
Cl.lOR 2
Cl.20 3
eport: piir.3 File: sch Item Index: key~Exam Cat 1
233 3
4 6
REFERENCE ID RPV-CORE SUP STRUC W 119-38-A 119-38-B 119-38-C 119-38-D 119-38-E 119-46-A 1-102-221 1-201-246 E-60B-01 1-101-221 E-56A-01 E-56A-02 1-1401-271 Page 28 Period Totals:
Period Totals:
Period Totals:
Period Totals:
Pl 1
1 0
0 0
1 1
P2 0
0 2
1 2
1 2
P3 0
3 3
3 3
3 3
6 3.
1 3
1 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3.
CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID C-A Cl. 20 Period Totals:
- c-A Cl.30 1
2 1-101-241 Pl 2
Period Totals:
- O Cl.30R 1
C-B C2.21 8
C2.21R 2
eport: piir 3 File: sch Item Index: key~Exam Cat 2
12 4
E-60B-02 1-103-221 1-105-201 1-104-221 1-1510-371 2-103-221 2-105-201 2-104-221 2-1510-371 E-60B-03 E-60B-04 Page 29 Period Totals:
Period Totals:
0 1
1 --
1 1
P2 P3 1
0 2
1 0
3 0
1 3
2 2
3 3
2 2
4 3
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID C-B C2.21R C-B C2.22 6
c-c C3.10 6
C3.20 51 eport: piir_3 File: sch item Index: key:-Exam Cat 6
12 51 Period Totals:
1-104-221-lRS 1-103-221-lRS 1-105-201-lRS 2-104-221-IRS 2-103-221-IRS 2-105-201-IRS 1-A 1-B 1-C 1-D 1-E 1-F Period Totals:
Period Totals:
ESS-12-SIS-1Al-3PL1 ESS-12-SIS-1Al-3PL2 ESS-12-SIS-1Al-3PL3 ESS-12-SIS-1Al-3PL4 ESS-12-SIS-1Bl-7PL1 ESS-12-SIS-1Bl-7PL2 ESS-12-SIS-1Bl-7PL3 ESS-12-SIS-1Bl-7PL4 ESS-12-SIS-2Bl-9PL1 ESS-12-SIS-2Bl-9PL2 ESS-12-SIS-2Bl-9PL3 ESS-12-SIS-2Bl-9PL4 ESS-6-LTC-1A-203PL1 ESS-6-LTC-1A-203PL2 Page 30 Pl 2
1 1 --
0 1
1 1
1 P2 0
2 2
2 --
0 2
2 2
2 P3 0
3 3
3 3 --
3 3
3 3
3 3
6 3
3 3
3 3
3 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT c-c C3.20 51 C-C#
CC#-NA 0
eport: piir 3 File: sch Item Index: key~Exam Cat BASE 51 11 REFERENCE ID ESS-6-LTC-1A-203PL3 ESS-6-LTC-1A-203PL4 ESS-6-LTC-1A-218PL1-4 ESS-6-SIS-1HP-208PL5 ESS-6-SIS-1HP-208PL6 ESS-6-SIS-1HP-208PL7 ESS-6-SIS-1HP-208PL8 ESS-6-SIS-2HP-216PL1 ESS-6-SIS-2HP-216PL2 ESS-6-SIS-2HP-216PL3 ESS-6-SIS-2HP-216PL4 ESS-6-SIS-2HP-216PL5 ESS-6-SIS-2HP-216PL6 ESS-6-SIS-2HP-216PL7 ESS-6-SIS-2HP-216PL8 FWS-18-FWL-1Sl-256PL1 FWS-18-FWL-1Sl-256PL2 FWS-18-FWL-1Sl-256PL3 FWS-18-FWL-1Sl-256PL4 FWS-18-FWL-2Sl-257PL1 FWS-18-FWL-2Sl-257PL2 FWS-18-FWL-2Sl-257PL3 FWS-18-FWL-2Sl-257PL4 FWS-18-FWL-2Sl-259PL1-6 FWS-18-FWL-2Sl-259PL7-12 MSS-36-MSL-1Sl-207PS MSS-36-MSL-1Sl-210PL MSS-36-MSL-1Sl-206PL1 MSS-36-MSL-1Sl-206PL2 MSS-36-MSL-1Sl-206PL3 "MSS-36-MSL~1Sl-206PL4 MSS-36-MSL-2Sl~207PS MSS-36-MSL-2Sl-212PL MSS-36-MSL-2Sl-206PL1 MSS-36-MSL-2Sl-206PL2 MSS-36-MSL-2Sl-206PL3 MSS-36-MSL-2Sl-206PL4 Period Totals:
Page 31 Pl P2 P3 3
3 3
2 2
2 2
3 3
3 3
1 1
1 1
2 2
2 2
2 2
2 2
1 1
1 3
2 2
2 2
2 3
2 2
2 2
11
- 25 15 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID C-C#
CC#-NA Period Totals:
CC*-NA 0
56 Period Totals:
C-F-1 C5.11 116 186
- ESS-12-SIS-lAl-2 ESS-12-SIS-lAl-3 ESS-12-SIS-lAl-4 ESS-12-SIS-lAl-5 ESS-12-SIS-lAl-6 ESS-12-SIS-1A1~7 ESS-12-SIS-lBl-12 ESS-12-SIS-lBl-2 ESS-12-SIS-lBl-3 ESS-12-SIS-lBl-4 ESS-12~SIS~1Bl-5 ESS-12-SIS-lBl-6 Ess~12~sis-1B1~1 ESS-12-SIS-2Al-10 ESS-12-SIS-2Al-7 ESS-12-SIS-2Al-8 ESS-12-SIS-2Al-9 ESS-12..,SIS-2Bl-1 ESS-l2-SIS-2Bl-2 ESS-12-SIS-2Bl-3 ESS-12-SIS-2Bl-4 ESS-12-SIS-2Bl-5 ESS-12-SIS-2Bl-6 ESS-12-SIS-2Bl-7 ESS-12-SIS-2Bl-8 ESS-12-SIS-2Bl-9 ESS-24-SIS-SH2-208 ESS-24-SIS-SH2-209 ESS-24-SIS-SH2-211 ESS-6-LTC-lA-201 ESS-6-LTC-lA-202 eport: piir_3.
File: sch item Index: key-: Exam Cat Page 32 Pl P2 P3 0
0 0
0 0
0 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 3
3 2
2 2
2 2
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD ATEGORY POPULATION ITEM NO INT BASE REFERENCE ID Pl.
P2 P3 C-F-1 C5.11 116 186 ESS-6-LTC-lA-203 2
ESS-6-LTC-lA-204 2
ESS-6-LTC-lA-205 2
ESS-6-LTC-lA-206 3
ESS-6-LTC-lA-207 3
ESS-6-LTC-lA-208 3
ESS-6-LTC-lA-209 3
ESS-6-LTC-lA-210 3
ESS-6-LTC-lA-211 3
ESS-6-LTC-lA-212 3
ESS-6-LTC-lA-213 3
ESS-6-LTC-lA-214 3
ESS-6-LTC-lA-215 3
ESS-6-LTC-lA-218 3
ESS-6-LTC-lA-219 2
ESS-6-LTC-lA-220 2
ESS-6-LTC-lA-221 2
ESS-6-LTC-lA-222 2
ESS-6-LTC-lA-223 2
ESS-6-LTC-lA-224 2
ESS-6-LTC-lA-225 2
ESS-6-LTC-lA-226 2
ESS-6-LTC-1A~227 2
ESS-6-LTC-lA-228 2
ESS-6-LTC-lB-201 1
ESS-6-LTC-lB-202 1
ESS-6-LTC-lB-203 1
ESS-6-LTC-lB-204 1
ESS-6-LTC-lB-205 1
ESS~9-LTC-1B-208.
1 ESS-6-LTC-lB-20~
1 ESS-6-LTC-lB-210 1
ESS-6-LTC-lB-211 1
ESS-6-LTC-lB-212 1
ESS-6-SIS-CRH-216 2
ESS-6-SIS-CRH-217 2
ESS-6-SIS-CRH-218 2
ESS-6-SIS-lHP-203 1
ESS-6-SIS-lHP-204 1
ESS-6-SIS-lHP-205 2
ESS-6-SIS-lHP-206 2
ESS-6-SIS-lHP-207 2
ESS-6-SIS-lHP-208 2
ESS-6-SIS-lHP-209 1
ESS-6-SIS-lHP-210 1
ESS-6-SIS-lHP-213 1
ESS-6-SIS-lHP-214 1
ESS-6-SIS-1HP-214A 1
eport: piir_3 File: sch item Index: key-=-Exam Cat Page 33 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY POPULATION ITEM NO INT C-F-1 CS.11 116 CS.12 0
eport: piir 3 File: sch Item Index: key~Exam Cat BASE 186 0
REFERENCE ID ESS-6-SIS-lHP-215 ESS-6-SIS-lHP-216 ESS-6-SIS-lHP-217 ESS-6-SIS-lHP-218 ESS-6-SIS-lHP-219 ESS-6-SIS-lHP-220 ESS-6-SIS-lHP-221 ESS-6-SIS-lHP-222 ESS-6-SIS-lHP-223 ESS-6-SIS-1HP-223A ESS-6-SIS-lHP-226 ESS-6-SIS-lHP-227 ESS-6-SIS-2HP-209 ESS-6-SIS-2HP-210 ESS-6-SIS-2HP-212 ESS-6-SIS-2HP-214 ESS-6-SIS-2HP-215 ESS-6-SIS-2HP-217 ESS-6-SIS-2HP-218 ESS-6-SIS-2HP-221 ESS-6-SIS-2HP-224 ESS-6-SIS~2HP-225 ESS-6-SIS-2HP-226 ESS-6-SIS-2HP-226A ESS-6-SIS-2HP-226B ESS-6-SIS-2HP-227 ESS-6-SIS-2HP-228 ESS-6-SIS-2HP-229 ESS-6-SIS-2HP-230
.ESS-6-SIS-2HP-231 ESS-6-SIS-2HP-232 ESS-6-SIS-2HP-232A ESS-6-SIS-2HP-232B ESS-6-SIS-2HP-233 ESS-6-SIS-2HP-233A ESS-6-SIS-2HP-234A ESS-6-SIS-2HP-236 Period Totals:
Page 34 Pl P2 P3 1
1 1
1 1
1 1
3 3
3 2
2 3
3 2
2 2
1 1
1 I
1 1
1 3
3 1
1 1
1 1..
1 1
1 3
3 3
3 38 30*
48 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID C-F-1 C5.12 C-F-1 C5.12R 6
31 Period Totals:
ESS-24-SIS-SH2-208LU ESS-24-SIS-SH2-209LU ESS-24-SIS-SH2-208LD ESS-24-SIS-SH2-209LD ESS-24-SIS-SH2-211LD ESS-24-SIS-SH2-211LU Pl 0
Period Totals*:.
O C5.21 30 94 ESS-3-SIS-HPA-223 1
ESS-3-SIS-HPA-224B 1
ESS-3-SIS-HPA-224C 1
ESS-3-SIS-HPA-228 1
ESS-3-SIS-HPA-229 1
ESS-3-SIS-HPA-230 1
ESS-3-SIS-HPA-234 1
ESS-3-SIS-HPA-235 1
ESS-3-SIS-HPA-239 1
ESS-3-SIS-3HP-203 1
ESS-4-SIS-HPB-201 ESS-4-SIS-HPB-202 ESS-4-SIS-HPB-203 ESS-4-SIS-HPB-204
~
. ESS-4-SIS-HPB-214 ESS-4~SIS-HPB-215 ESS-4-SIS-2HP-202 ESS-4-SIS-2HP-203 ESS-4-SIS-2HP-204 ESS-3-SIS-LRA-202 ESS-3-SIS-LRA-203 ESS-3-SIS-LRA-204 ESS-3-SIS-CRA-213 ESS-3-SIS-CRA-214 ESS-3-SIS-CRA-215 eport: piir_ 3 File: sch item Index: key-=-Exam Cat Page 35 P2 0
2 2
2 2
2 2
6 2
2 2
2 2
2 P3 0
0 3
3 3
3 3'
3 3
3 3
PIIR Rev. 1
ATEGORY ITEM NO C-F-1 CS.21 CS.30 PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE REFERENCE ID 30 94 ESS-4-SIS-CRH-219 ESS-4-SIS-CRH-220 ESS-3-SIS-HPB-202 ESS-3-SIS-HPB-204E ESS-3-SIS-HPB-208 Period Totals:
30 64 ESS-2-SIS-HRA-208
.ESS-2-SIS-HRA-208A ESS-2-SIS-HRA-208B ESS-2-SIS-HRA-208C ESS-2-,SIS-HRA-20.8D ESS-2-SIS-HRA-209 ESS-2-SIS-HRB-201 ESS-2-SIS-HRB-202 ESS-2-SIS-HRB-203 ESS-2-SIS-HRB-206 ESS-2-SIS-HRB-214A ESS-2-SIS-HRB-214B ESS-2-SIS-HRB-214D ESS-2-SIS-HRB-219 ESS-2-SIS-lAl-1 ESS-2-SIS-.lAl-2.
ESS-2-SIS-1A2-1 ESS-2-SIS-1A2-2 ESS-2-SIS-1B2-1 ESS-2-SIS-1B2-2 ESS-2-SIS-lBl-1 ESS-2-SIS-lBl-2 ESS-2-SIS-2Al-1 ESS-2-SIS-2Al-2 ESS-2-SIS-2A2-1 ESS-2-SIS-2A2-2 ESS-2-SIS-2Bl-1 ESS-2-SIS-2Bl-2 ESS-2-srs..:2B2~1 ESS.-2-SIS-2B2-2 eport: piir 3 File: sch Item Index: key~Exam Cat Page 36 Pl P2 P3 1
1 2
2 2
12 9
9 1
1 1
- 1 1
1 2
2 2
2 2
2 2
2 3
3 3
3 3
3 3
- 3.
2 2
2 2
1 1
1 1
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE C-F-1 C5.30 C-F-1 C5.41 33 eport: piir 3 File: sch Item Index: key~Exam Cat 39 REFERENCE ID Period Totals:
ESS-14-SIS-HPA-207/6 ESS-18-SIS-SHl-210/3 ESS-18-SIS-SHl-233/2 ESS-18-SIS-SH2-240/2 ESS-24-SIS-SHl-209/2 ESS-24-SIS-SH2-211/8 ESS-6-CSS-lPA-210/2 ESS-6-LTC-lA-213/2 ESS-6-LTC-lB-205/2 ESS-6-SIS-lHP-227/2 ESS-6-SIS-1HP-227/2A ESS-6-SIS-1HP-227/2B ESS-6-SIS-1HP-227/2C ESS-6-SIS-2HP-216/2 ESS-6-SIS-2HP-236/2A ESS-6-SIS-2HP-236/2B ESS-6-SIS-2HP-236/2C ESS-6-SIS-2HP~236/2D ESS-8-CSS-SLA-244/4A ESS-8-CSS-SLA-244/4B ESS-8-CSS-SLA-246/3A ESS-8-CSS-SLA-246/3B ESS-8-CSS-SLA-246/3C ESS-8-CSS-SLA-248/3A ESS-8-CSS-SLA-248/3B ESS-8-CSS-SLB-253/3A ESS-8-CSS-SLB-253/3B ESS-8-CSS-SLB-253/3C ESS-8-CSS-lPB-215/2 ESS-8-CSS-lPC-218/2 ESS-8-SIS-LPA-217/3 ESS-4-SIS-CRH-216/2 ESS-18-SIS-SH1-210A/3 Period Totals:
Page 37 Pl P2 P3 10 12 8
2 2
2 1
2 1
3 3
1 2
2 2
2 1
3 3
3 3
1 1
2 2
2 3
3 3
- 3.
3 3
3 1
1 2
8 12 13 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION.
ATEGORY ITEM NO INT BASE REFERENCE ID C-F-1#
CFl#-NA 0
4 Period Totals:
C-F-1*
CFl*-NA 0
1272 Period Totals:
C-F-2 C5.51 32 69 FWS-18-FWL-lSl-246 FWS-18-FWL~lsl-250 FWS-18-FWL-lSl-251 FWS-18-FWL-lSl-255 FWS-18-FWL-lSl-256 FWS-18-FWL-lSl-257 FWS-18-FWL-lSl-258 FWS-18-FWL-lSl-259 FWS-18-FWL-lSl-260 FWS-18-FWL-lSl-261 FWS-18-FWL-2Sl-245 FWS-.18-FWL-2Sl-256 FWS-18-FWL-2Sl-257 FWS-18-FWL-2Sl-258 FWS-18-FWL-2Sl-259 FWS-18-FWL-2Sl-260 FWS-18-FWL-2Sl-261 FWS-18-FWL-2Sl-262 MSS-36-MSL-lSl-201 MSS-36-MSL-lSl-202 MSS-36-MSL-lSl-208 MSS-36-MSL-lSl-210 MSS-36-MSL-lSl-211 MSS-36-MSL-lSl-212 MSS-36-MSL-2Sl-208 MSS-36-MSL-2Sl-212 MSS-36-MSL-2Sl-213 SWS-16-CRS-RHl-204 SWS-16-CRS-RHl-201 SWS-16-CRS-RHl-202 SWS-16-CRS~SHl-201 VAS-12-CPU-SL2~201
.eport: piir_3 File: sch item Index: key-:-Exam Cat Page 38 Pl P2 P3 0
0 0
0 0
0 3
3 3
2 2
1 2
1 2
1 2
1 2
1 2
1 3
3 3
3 3
3 1
2 3
3 1
2 2
3 2
2 3
3 3
3 3
2 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY C-F-2 POPULATION ITEM NO INT BASE C5.51 32 C5.52 0
C5.52R 26 eport: piir 3 File: sch Item Index: key~Exam Cat 69 0
72 REFERENCE ID Period Totals:
Period Totals:
MSS-36-MSL-1Sl-202LD MSS-36-MSL-1Sl-201LDI MSS-36-MSL-1Sl-201LDO MSS-36-MSL~1S1-202LUI MSS-36-MSL-1Sl-202LUO MSS-36-MSL-1Sl-208LUI MSS-36-MSL-1Sl-208LUO MSS-36-MSL-1Sl-208LD MSS-36-MSL-1Sl-210LU MSS-36-MSL-1Sl-210LDI MSS-36-MSL-1Sl-210LDO MSS-36-MSL-1Sl-211LUI MSS-36-MSL~1Sl-211LUO MSS-36-MSL~1Sl~211LD MSS-36-MSL-1Sl-212LU MSS-36-MSL-1Sl-212LDI MSS-36-MSL-1Sl-212LDO MSS-36-MSL-2Sl-208LUI MSS-36-MSL-2Sl-208LUO MSS-36-MSL-2Sl-208LD MSS-36-MSL-2Sl-212LU MSS-36~MSL-2Sl-212LDI MSS-36-MSL-2Sl-212LDO MSS-36-MSL-2Sl-213LUI MSS-36-MSL-2Sl-213LUO MSS-36-MSL-2Sl-213LD Period Totals:
Page 39 Pl P2 P3 8
13 17 0
0 0
3 3
3 3
3 1
1 1
2 2
2 2
- 2.
2 3
3 3
2 2
2 2
2 2
3 3
3 3
12 11 PIIR Rev. 1
I PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY POPULATION ITEM NO INT CS.81 28 C-F-2#
CF2#-NA 0
C-F-2*
CF2*-NA 0
eport: piir 3 File: sch Item Index: key~Exam Cat BASE 33 24 136 REFERENCE ID FWS-18-FWL-1Sl-246A/6 FWS-18-FWL-2Sl-247/6 MSS-36-MSL-lSl-212/3 MSS-36-MSL-1Sl-209/8A MSS-36-MSL-1Sl-209/8B MSS-36-MSL-1Sl-211/6A MSS-36-MSL-1Sl-211/6B MSS-36-MSL-1Sl-211/6C MSS-36-MSL-1Sl-211/6D MSS-36-MSL-1Sl-211/6E MSS-36-MSL-1Sl-211/6F MSS-36-MSL-2Sl-214/3 MSS-36-MSL-2Sl-210/8A MSS-36-MSL-2Sl-210/8B MSS-36-MSL-2Sl-213/6A MSS-36-MSL-2Sl-213/6B MSS-36-MSL-1Sl-211A/6G MSS-36-MSL-1Sl-211A/6H MSS-36-MSL-1Sl-211A/6I MSS~36-MSL-1Sl-211A/6J MSS-36~MSL~1Sl-211A/6K MSS-36-MSL-1Sl-211A/6L MSS-36-MSL-2Sl-213A/6G MSS-36-MSL-2Sl-213A/6H MSS-36-MSL~2Sl-213A/6I MSS-36-MSL-2Sl-213A/6J MSS-36-MSL-2Sl-213A/6K MSS-36-MSL-2Sl-213A/6L Period Totals:
Period Totals:
Page 40 Pl P2 P3 2
1 3
1 1
3 3
2 2
2 2
2 1
1 2
2 3
3 3
3 3
3 3
3 3
3 3
3 5
8 15 0
0 0
PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID C-F-2*
CF2*-NA Period Totals:
D-B D2.20 53 53 CCS-16-CPU-lPA-PS CCS-16-CPU-lPC-PS CCS-20-CHX-RLB-PS CCS-20-CPU-lPA-PS CCS-20-CPU-lPC-PS CCS-20-SCH-lPl-PS FWS-6-AWS-lSl-PR-DB FWS-6-AWS-lSl-PS FWS-6-AWS-SLC-PS SWS-10-CRS-RLl-PS SWS-10-CRS-RLl-PSl SWS-10-CRS-RL3-PS1 SWS-10-CRS-RL3-PS4 SWS-10-CRS-RL3-PS5 SWS-10-CRS-RL4-PR1-DB SWS-10-CRS-RL4-PS4 SWS-10-CRS-RL4-PS5 SWS-10-CRS-SLl-PS SWS-10-CRS-SL3-PS2 SWS-10-CRS-SL3-PS3 SWS-10-CRS-SL3-PS4 SWS-10-CRS-SL3-PS5 SWS-10-CRS-SL3-PS6 SWS-10-CRS-SL4-PR4~DB SWS-16-SWP-OLA-PS SWS-24-CCS-RLH-PRl-DB SWS-24-CCS-RLH-PR2-DB SWS-24-CSW-SH1-PS2 SWS-24-CSW-SHl-PSl SWS-6-CRS-2Sl-PS SWS-6-CRS-282-PSl SWS-6-CRS-2S2-PS2 SWS-6-CRS-282-PS3 SWS-6-CRS-3Rl-PS1 SWS-6-CRS-3R2-PS1 SWS-6-CRS-3R2-PS2 SWS-6-CRS-3R2-PS3 SWS-6-CRS-381-PSl SWS-6-CRS-3Sl-PS2 SWS-6-CRS-3S2-PS1 eport: piir_3 File: sch item Index: key:-Exam Cat Page 41 Pl P2 P3 0
0 0
3 2
1 3
2 2
2 2
3 3
3 2
1 3
3 2
2 1
2 2
3 3
3 1
3*
1 2
1 1
3 3
3 1
1 2
2 2
3 2
2 PIIR Rev. 1
.ATEGORY ITEM NO D-B D2.20 D2.40 F-A Fl. lOA eport: piir_3 File: sch item PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE REFERENCE ID 53 53 SWS-6-CRS-4Rl-PS1 SWS-6-CRS-4R2-PS1 SWS-6-CRS-4R2-PS2 SWS-6-CRS-4R2-PS3 SWS-6-CRS-4Sl-PS1 SWS-6-CRS-4S2-PS1 SWS-6-CRS-4S2-PS2 SWS-6-CRS-4S2-PS3 SWS-6-EPS-SLA-PR9-DB SWS-6-EPS-SLA-PS SWS-6-EPS-SLB-PR3B-DB SWS-6-EPS-SLB-PS SWS-8-CRS-RL2~PS2 Period Totals:
3 3
CCS-10-RWS-lPl-PRl-DB CCS-18-RHC-1Pl-PR3-DB SWS-16~CRS-SH1-PR-DB Period Totals:.
28 102 CVC-2-CHL-1Al-3PRA CVC-2-CHL-1A2-1APR CVC-2-CHL-2Al-15PR CVC-2-CHL-2Al-23PRC eve CHL-2Al - 3 9.PRl CVC-2-LDL-2B2-11PR CVC-2-LDL-2B2-21PR CVC-2-LDL-2B2-31PR CVC-2-PSS-1Pl-12PRA CVC-2-PSS-1Pl-20PRB CVC-2-PSS-1Pl-26PR CVC-2-PSS-1Pl-32PRB CVC-2-PSS-1Pl-32PRE cvc~2-PSS-1Pl-4PRB CVC-2-PSS-1Pl-44PRB CVC-2-PSS-1Pl-52PRB CVC-2-PSS-1Pl-6PRB Index: key-:-Exam Cat Page 42 Pl P2 P3 2
1 1
3 3
3 2
2 2
1 3
2 3
12 21 20 3
1 3
1 0
2 1
3 1
1 3
1 3
1 2
2 2
1 3
2 2
3 1
PIIR Rev. 1
.ATEGORY ITEM NO F-A Fl.lOA Fl.lOB Fl. lOC PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE REFERENCE ID 28 102 ESS-2-SIS-1Bl-7PR ESS-2-SIS-2Al-7PS1 ESS-6-SIS-1Al-3PR ESS-6-SIS-1Bl-7PR ESS-6-SIS-2Bl-20PR PCS-12-SCS-2Hl-10PRB PCS-2-DRL-lAl-lOPR PCS-2-LDL-2Bl-14PRB PCS-3-PSS-1Bl-4PRB PCS-4-PSS-lPl-lPR PCS-4-PSS-lPl-SPR Period Totals:
7 23 CVC-2-CHL-2Al-1PR CVC-2-CHL-2Al-7PRA ESS-2-LTC-1B-20PR ESS-6-SIS-2Bl-16PR PCS-3-PSS-1Bl-14PRB PCS-4-PSS-lPl-lOPRA PCS-4-PSS-1Pl-8PR Period Totals:
9 26 CVC-2-CHL-1Al-13PR CVC-2-LDL-2Bl-20PR ESS-2-LTC-1B-26PR ESS-6-SIS-lAl-SPR ESS-6-SIS-2Al-5PR
.PCS-12-PSL-lHl-SPRA PCS-3-PSS-1Bl-14BPR PCS-3-PSS-2Al-5PRA PCS-4-PRS-1Pl-8PR Period Totals:
eport: piir 3 File: sch Item Index: key~Exam Cat Page 43 Pl P2 P3 2
1 3
1 3
2 1
1 3
2 3
11 8
9 2
3 1
3 1
2 1
3 2
2 1
3 3
1 1
3 1
2 1
5 1
3 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY POPULATION ITEM NO INT BASE REFERENCE ID Pl P2 P3 Fl. 20A 28 140 ESS-10-SDC-XC0-205PSS 1
ESS-10-SIS-LPA-231PR 3
ESS-12-SIS-1LP-233PR 1
ESS-12-SIS-2Al-4PRB 2
ESS-14-SCS-2Hl-204SS 1
ESS-14-SDC-LPC-203PR 2
ESS-14-SIS-HPA-207PR1 3
ESS-18-SIS-SH1-216PR 2
ESS-18-SIS-SH1-230PR 2
ESS-24~SIS-SH2-211PR2 2
ESS-6-SIS-1HP-227PSS 1
ESS-6-SIS-2HP-226BPR2 1
ESS-8-CSS-SLA-235PR 3
ESS-8-CSS-1PA-218PR 3
ESS-8-SIS-1A6-202PSS 3
ESS-8-SIS-1B6-202PSS 1
ESS-10-SDC-XIA-202PR 3
ESS-3-SIS~HPA-231PR1 1
ESS-4-SIS-CRH-217PR 1
ESS-4-SIS-CRH-221PRC 1
ESS-3-SIS-HPB-214PR 2
FWS-18-FWL-1Sl-248PR 1
FWS-18-FWL-1Sl-256APR 3
FWS-6-AWS-2Sl-211PR1 2
MSS-36-MSL-1Sl-207SS 1
MSS-36-MSL-1Sl-211PRB 2
SWS-16-CRS-RH1-204PR1A 2
VAS-8-CPU-RL1-205PR
- 3 Period Totals:
11 9
8 Fl. 20A*
0 12 Period Totals:
0 0
0
. Fl. 20B 20 100 ESS-12-SIS-1LP-219PR 3
ESS-14-SDC-LPD-214PR 1
ESS-14-SDC-LPD-204PR1 2
.eport: piir_ 3 File: sch item Index: key-=-Exam Cat Page 44 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION ATEGORY ITEM NO INT BASE REFERENCE ID F-A Fl.20B 20 100 ESS-14-SDC-LPD-213PRA ESS-14-SIS-HPA-207PR2 ESS-18-SIS-SH2-237PR ESS-6-LTC-1A-213PSS ESS-6-SIS-HPB-218PR ESS-6-SIS-lBl-lPSS ESS-6-SIS-2HP-236PR4 ESS-8-CSS-SLA-231PR1 ESS-8-CSS-SLA-234PR1 Ess~a-CS$-1PA-216PR ESS-3-SIS-HPA-227PR ESS-2-SIS-HRA-213PRB ESS-2-SIS-HRB-209PR ESS-3-SIS-HPB-207PR ESS-3-SIS-3HP-201PR MSS-8-MSV-2S2-208PR3 ESS-6-SIS-2HP-216PRA Period Totals*:
Fl.20B*
0 21 Period Totals:
Fl. 20C.
25 129 ESS-1~-SDC-XIB-204PR ESS-10-SIS-LPA-230PR ESS-10-SIS-LPA-224PR1 ESS-12-SIS-lBl-lPRA ESS-12-SIS-1Bl-7PR ESS-12-SIS-1LP-241PR ESS-14-CSS-1PA-204PR1 ESS-18-SIS-SH1-224PR ESS-18-SIS-SH2-214PR ESS-24-SIS-SHl~203PR ESS-24-SIS-SH1-209PR1 ESS-6-SIS-lBl-lPRl ESS-6-SIS-2HP-232PR ESS-8-CSS-SLA-240PR2 eport: piir_ 3 File: sch item Index: key-=-Exam Cat Page 45 Pl P2 P3 1
3 3
1 2
. 1 2
3 3
3 1
1 1
2 2
3 3
7 5
8 0
0 0
2 3
1 2
2 1
.2 2
2 3
3 1
1 3
PIIR*Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY.PERI°OD
.ATEGORY POPULATION ITEM NO INT BASE REFERENCE ID F-A Fl.20C 25 129 ESS-8-CSS-1PA-212PR2 ESS-8-SIS-HPB-207PR ESS-4~SIS-HPB-204PR ESS-4-SIS-HPB-212PR ESS-3-SIS-LRA-205PR FWS-18-FWL-1Sl-249PR FWS-18-FWL-2Sl-252PR MSS-36-MSL-1Sl-202PR MSS-36-MSL-1Sl-204PR MSS-8-MSV-1Sl-208PR SWS-16-CRS-RH1-204PR1 Period Totals:
Fl.20C*
0 15 Period Totals:
Fl. 30A 60 144 CCS-14-ARH-1Pl-PR3 CCS-20-CPU-lPA-PSS CCS-20-CPU-lPC-PSS CCS-20-SCH-1P2-PR DMW-6-CST-AFS-PRl FWS-1.5-AWS-OLA-PR FWS-1.5-AWS-OLB-PR FWS-2-AWS-OLC-PR4 FWS-6-AWS-lSl-PSS FWS-6-AWS-SLC-PSS FWS-6-AWS-ISI-PR SFP-12-SFX-SLl-PRl SFP-14-FPF-RLl-PRl SWS-10-CRS-RLl-PSS SWS-10-CRS-RLl-PSSl SWS-10-CRS-RL3-PSS1 SWS-10-CRS-RL3-PSS4 SWS-10-CRS-RL3-PSS5 SWS-10-CRS-RL4-PR2 SWS-10-CRS-RL4-PSS4 eport: piir_3 File: sch item Index: key-=-Exam Cat Page 46 Pl P2 P3 3
3 2
2 3
2 1
3 1
2 2
6 11 8
0 0
0 2
3 2
1 1
2 2
2 2
3 2
3 2
3 3
2 1
3 3
2 PIIR Rev. 1
PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD
.ATEGORY POPULATION ITEM NO INT BASE REFERENCE ID Pl P2 P3 F-A Fl. 30A 60 144 SWS-10-CRS-RL4-PSS5 2
I SWS-10-CRS-SLl-PSS 1
SWS-10-CRS-SL3-PSS2 2
SWS-10-CRS-SL3-PSS3 2
SWS-10-CRS-SL3-PSS4 3
SWS-10-CRS-SL3-PSS5 3
SWS-10-CRS-SL3-PSS6 3
SWS-16-CRS-RHl-PR 2
SWS-16-CRS-SHl-PRA 1
SWS-16-SWP-OLA~PSS 3
SWS-24-CSW-SH1-PSS2 1
SWS-24-CSW-SHl-PSSl 1
SWS-6-CRS-2R2-PSS1 3
SWS-6-CRS-2Sl-PSS 3
SWS-6-CRS-2S2-PSS1 3
SWS-6-CRS-2S2-PSS2 3
SWS-6-CRS-2S2-PSS3 1
SWS-6-CRS-3Rl-PSS1 1
SWS-6-CRS-3R2-PSS1 2
SWS-6-CRS-3R2-PSS2 2
SWS-6-CRS-3R2-PSS3 2
SWS-6-CRS-3Sl-PSS1 3
SWS-6-CRS-3Sl-PSS2 2
SWS-6-CRS-3S2-PSS1 2
SWS-6-CRS-4Rl-PSS1 2
SWS-6~CRS-4R2-PSS1 1
SWS-6-CRS-4R2-PSS2 1
SWS-6-CRS-4R2-PSS3 3
SWS-6-CRS-4Sl-PSS1 3
sws~6-CRS-4S2-PSS1 3
SWS-6-CRS-4S2-PSS2 2
SWS-6-CRS-4S2-PSS3 2
SWS-6-EPS-SLA-PR9A 2
SWS-6-EPS-SLA-PSS 1
SWS-6-EPS-SLB-PSS 2
SWS-8-CRS-RL2-PSS2 3
SWS-10-CRS-SL4-PR4 1
SWS-24-CCS-RLH-PR2 2
SWS-6-EPS-SLA-PR9 2
SWS-6-EPS-SLB-PR3B 3
(
Period Totals:
. 13 26 21 Fl.30B 15 102 eport: piir_ 3 File: sch item Index: key-: Exam Cat Page 47 PIIR Rev. 1
ATEGORY ITEM NO F-A Fl.30B Fl. 30C Fl.40A eport: piir_ 3 File: sch item PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE REFERENCE ID 15 102 CCS-14-ASH-1Pl-PR2 CCS-20-CPU-lPB-PSS DMW-6-CST-AWS-PSSl FWS-12-CMU-SH3-PSS1 FWS-4-AWS-1S3-PR1 FWS-6-AWS-OLC-PR2 SFP-10-FPP-1PB-PR2 SFP-8-FPP-1PB-PR2 SWS-12-CRS-SH2-PSS SWS-16-SWP-OLC-PR SWS-24-CSW-SH2-PR1 SWS-6-CRS-1S2-PSS SWS-6-EPS-RLB-PR2 SWS-10-CRS-RL4-PR1 SWS-2~-CCS-RLH-PRl Period Totals:
12 37 CCS-10-ASH-lPl-PRlA CCS-16-CPU-lPA-PSS CCS-16-CPU-lPC-PSS CCS-20-CHX-RLB-PSS CCS-20-SCH-lPl~PSS CCS-24-CPU-lPA-PRA CCS-10-RWS-lPl-PRl CCS-18-RHC-1Pl-PR3 FWS-6-AWS-0LA-PR3 SFP-10-FPP-lPA-PRl SWS-24-CSW-HCL-PR SWS-16-CRS-SHl-PR Period Totals:
19 25 P-56A-02 P-55A-02 P-55B-02 P-55C-02 P-54A-02 Index: key:-Exam Cat Page 48 Pl P2 P3 3
2 2
1 2
3 3
2 1
2 2
2 1
3 1
4 7
4 3
3 2
1 2
1 3
1 1
3 1
3 5
2 5
3 3
3 3
3 PIIR Rev. 1
.ATEGORY ITEM NO F-A Fl.40A Fl. 40B N/A D-PAL N/A PALISADES INSERVICE INSPECTION REFERENCE INTERVAL 3 CATEGORY/ITEM SCHEDULE BY PERIOD POPULATION INT BASE 19 25
- 6.
12 0
0 0
578 REFERENCE ID P-54B-02 P-54C-02
, P-66B-02 P-67A-02 P-67B-02 lB-SS 2B-SS 4-984/5-984-SS E-56A-S-01 E-56A-S-02 E-56A-S-03 E-56B-S-01 1-SK-SS 2-SK-SS 1-A-SS 1-B-SS 1-C-SS 1-D-SS 1-E-SS 1-F-SS Period Totals:
Period Totals:
Period Totals:
Period Totals:
eport: piir 3 File: sch Item Index: key~Exam Cat Page 49 Pl 1
1 2 --
0 0
0 P2 2
2 2
3 --
0 0
0 P3 3
3 3
3 3
3 3
3 3
14 --
3 3
3
- 3.
3 3
6 0
0 PIIR Rev. 1
ATTACHMENT 4 CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION INSERVICE INSPECTiON PROGRAM SECTION 9 REVISED PAGES
PALISADES NUCLEAR PLANT INTERVAL 3 -
POPULATION
SUMMARY
Class 1 Components Class 2 Components Class 3 Components B-A components B-B components B-D components B-E components B-F components B-G-1 components B-G-2 components B-H components B-J components B-K-1 components B-L-1 components B-L-2 components B-M-1 components B-M-2 components B-N-1 components B-N-2 components B-N-3 components B-0 components B-Q components Report: int3_pop File: dcprogma reject: int3_pop
=
27
=
21
=
42
=
0
=
47
= 171
= 152
=
2
= 217
=
0
=
1 0
=
1
=
0
=
1
=
2
=
1
=
6
=
0 C-A components =
9 D-A components =
0 C-B components =
16 D-B components =
56 c-c components =
57
- D-C components =
O*
C-F-1 components = 215 C-F-2 components =
86 Component Supports Non-Sec. XI Components F-A components = 229 N/A components =. 44 Inservice Inspection - Interval 3 Totals Total Class 1 Components
= 691 Total Class 2 Components
= 383 Total Class 3 Components
=
56 Total Component Supports
229 Non-Section XI Components
44 Interval 3 Total: 1403 06/13/96
.SYS ITEM REFERENCE ID ESS OVERLAY ESS-24-SIS-SH1-207 ESS OVERLAY ESS-24-SIS-SH2-207 FWS MP-4.0 FWS-3-AWS-1S1-258 FWS MP-4.0 FWS-3-AWS-1S1-259 FWS MP-4.0 FWS-3-AWS-151-260
'Q FWS MP-4.0 FWS-3-AWS-151-PIPE FWS MP-4.0 FWS-3-AWS-2S1-253 FWS MP-4.0 FWS-3-AWS-2S1-254 FWS MP-4.0 FWS-3-AWS-251-255 FWS MP-4.0 FWS-3-AWS-2S1-PIPE FWS MP-4.0 FWS-4-AWS,1S1-257 FWS MP-4.0 FWS-4-AWS-2S1-252 Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat PALISADES NUCLEAR PLANT INTERVAL 3 ISi PROGRAM PLAN EXAMINATION CATEGORY AUG PERIOO(S)
"t" 1989 1,2,3*
24.00 96N98NOON02N03N05N 0.375 1989 1,2,3 24.00 96N98NOON02N03N05N 0.375 1989 1,2,3 3.00 96NOON03N 0.300 1989 1,2,3 3.00 96NOON03N 0.300 1989 1,2,3 3.00 96NOON03N 0.300 1989 1,2,3 3.00 96NOON03N.
0.300 1989 1,2,3 3.00 96NOON03N 0.300 1989 1,2,3 3.00 96NOON03N 0.300 1989 1,2,3 3.00 96NOON03N 0.300 i989 1,2,3 3.00 96NOON03N 0.300 1989 1,2,3 4.00 96NOON03N 0.337 1989 1,2,3 4.00 96NOON03N 0.337 06/13/96 REVISION:
CHANGE: 0 DRAWING/
EXAM PROCEDURE STRESS ISO UT 8-27 PT NDT-PT-01 03319 SH.1 UT 8-28 PT NDT-PT-01 03319 SH.4 UT NDT-UT-01 8-26A PT NDT~PT-01 2937 UT NDT-UT-01 8-26A PT NDT-PT-01 2937 UT NDT-UT-01 8-26A PT NDT-PT-01 2937 UT NDT-UT-02 8-26A 2937 UT NDT-UT-01 8-268 PT NDT-PT-01.
2938 UT NDT-UT-01 8-268 PT NDT-PT-01 2938 UT NDT-UT-01 8-268 PT NDT-PT-01 2938 UT NDT-UT-02 8-268 2938 UT NDT-UT-01 8-26A PT NDT-PT-01 2937 UT NDT-UT-01 8-268 PT NDT-PT-01 2938 Page number 1
SYS ITEM REFERENCE ID FWS TS-4.12 FWS-18-FWL-1S1-241 FWS TS-4.12 FWS-18-FWL-1S1-242 FWS TS-4.12 FWS-18-FWL-1S1-244 FWS TS-4.12 FWS-18-FWL-1S1-245 FWS TS-4.12 FWS-18-FWL-2S1-242 FWS TS-4.12 FWS-18-FWL-2S1-243
.,., TS-4.12 FWS-18-FWL-2S1-244
- -.MSS. __ TS-4.12. MSS-36-MSL:-1S1.~2.16 MSS TS-4.12 MSS-36-MSL-1S1-216LDI MSS TS-4.12 MSS-36-MSL-1S1-216LDO MSS TS-4.12 MSS-36-MSL-1S1-216LU MSS TS-4.12 MSS-36-MSL-1S1-217 Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat PALISADES NUCLEAR PLANT INTERVAL 3 ISi PROGRAM PLAN EXAMINATION CATEGORY AUG PERIOO(S)
"t" 1989 3
18.00 05N 0.750 1989 18.00 98N 0.740 1989 2
18.00 02N 0.740 1989 3
18.00 05N 0.750 1989 18.00 98N 0.750 1989 2
18.00 02N 0.750 1989 3
18.00 05N 0.750 1989 -
3 36.00 05N 1.010 1989 3
36.00 05N 1.250 1989 3
36.00 05N 1.250 1989 3
36.00 05N 1.250 1989 36.00 98N 1.000 06/13/96 REVISION:
CHANGE: 0 DRAWING/
EXAM PROCEDURE STRESS ISO UT B-144 MT 03379 SH 2 UT B-144 MT 03379 SH 2 UT
. B-144
.MT 03379 SH 2 UT g,144 MT 03379 SH 2 UT B-145 MT 03379 SH 4
- B-20A.
- PT 03341 SH 3 UT B-20A MT 03341 SH 3 UT B-20A MT 03341 SH 3 UT B-20A MT 03341 SH 3 MT B-20A RT 03341 SH 3 Page number 2
.SYS ITEM REFERENCE ID MSS TS-4.12 MSS-36-MSL-1S1-217LD MSS TS-4.12 MSS-36-MSL-1S1-217LUI MSS TS-4.12 MSS-36-MSL-1S1-217LUO MSS TS-4.12 MSS-36-MSL-2S1-218 MSS TS-4.12 MSS-36-MSL-2S1-218LDI MSS TS-4.12 MSS-36-MSL-2S1-218LDO MSS TS-4.12 MSS-36-MSL-2S1-218LU MSS TS-4.12 MSS-.36.-MSL-2S1-219 MSS TS-4.12 MSS-36-MSL-2S1-219LD MSS TS-4.12 MSS-36-MSL-2S1-219LUI MSS TS-4.12 MSS-36-MSL-2S1-219LUO MSS TS-4.12 MSS-6-RVR-1S4-203 Report:' plan_ cat File: dcprogma Index: intrvl_3/s-plan_cat PALISADES NUCLEAR PLANT 06/13/96 INTERVAL 3 ISi PROGRAM PLAN REVISION:
EXAMINATION CATEGORY AUG CHANGE: 0 PERIOO(S)
NPS DRAWING/
CODE YR OUTAGE(S) lltll EXAM PROCEDURE STRESS ISO 1989 36.00 UT 8-20A 98N 1.250 MT 03341 SH 3 1989 36.00 UT 8-20A 98N 1.250 MT 03341 SH 3 1989 36.00 UT 8-20A 98N 1.250 MT 03341 SH 3 1989 3
36.00 UT 8-208 05N 1.010 MT 03341 SH 1989 3
36.00 UT 8-208 05N 1.125 MT M-205/207,03341SH1 1989 3
36.00 UT 8-208 05N 1.125 MT M-205/207,03341SH1 1989 3
36.00 UT 8-208 05N 1.125 MT M-205/207,03341SH1 1989 2
- 36.00 UT 8-208 02N 1.000 MT 03341 SH 1989 2
36.00 UT 8-208 02N 1.125 MT M-205/207,03341SH1 1989 2
36.00 UT 8-208 02N 1.125 MT M-205/207,03341SH1 1989 2
36.00 UT 8-208 02N 1.125 MT M-205/207,03341SH1 1989 3
6.00 UT 8-20A 05N 0.280 MT 03341 SH 3 Page nunber 3
.SYS ITEM REFERENCE ID MSS TS-4.12 MSS-6-RVR-2S4-203 MSS TS-4.12 MSS-6-RVR-2S6-203 MSS TS-4.12 MSS-8-MSV-1S1-209 MSS TS-4.12 MSS-8-MSV-1S1-212 PCS RG-1.14 PCs-n-RCL-1A PCS RG-1.14 PCS-n-RCL-18 cs RG-1.14. PCS-72-RCL-2A
.PCS RG-1.14 PCS-n-RCL,28 Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat PALISADES NUCLEAR PLANT INTERVAL 3 ISi PROGRAM PLAN EXAMINATION CATEGORY AUG PERIOO(S)
NPS CODE YR OUTAGE CS) lltll 1989 3
6.00 05N 0.280 1989 3
6.00 05N 0.280 1989 8.00 96N 0.322 1989 3
8.00 05N 0.322 1989 1,2,3 72.00 96N98NOON02N03N05N 7.000 1989 1,2,3 72.00 96N98NOON02N03N05N 7.000 1989 1,2,3 72.00 96N98NOON02N03N05N 7.000 1989 1,2,3.
. 72.00-.
96N98NOON02N03N05N 7.000 06/13/96 REVISION:
CHANGE: 0 DRAWING/
EXAM PROCEDURE STRESS ISO 8-208 03341 SH 1 8-208 03341 SH 1 UT NDT-UT-01 8-21 PT NDT-PT-01 03358 SH 3*
UT 8-21.
MT 03358 SH 3 UT NDT-UT-08 A-32 Cross Ref.
UT NDT-UT-08 A-32 Cross Ref.
UT NDT-UT-08 A-32 Cross Ref.
.UT NDT-UT-08
. A-32. Cross Ref
- Page number 4
.SYS ITEM REFERENCE RPV 81.11 1D-112 RPV 81.11 8-112 RPV 81.11 9-112 RPV 81.12 1-112A.,..
RPV 81.12 1-1128 RPV 81.12 1-112C
.... 81.12 2-112A RPV 81.12 2-1128 RPV 81.12 2-112C RPV 81.12 3-112A RPV 81.12 3-1128 RPV 81.12 3-112C Report: plan_cat Fi le: dcprogma ID Index: intrvl_3/s-plan_cat PALISADES NUCLEAR PLANT 06/13/96 INTERVAL 3 ISi PROGRAM PLAN REVISION:
EXAMINATION CATEGORY 8-A CHANGE: 0 PERIOD(S)
NPS DRAWING/
CODE YR OUTAGE(S)
"t" EXAM PROCEDURE STRESS ISO 1989 182.DD UT-M A-1.8 98Y 1989 190.10 UT-M A-1.8 98Y CE-E-232-112 1989 190.10 UT-M A-1.8 98Y 8.875 CE-E-232-112 1989 UT-M A-1 98Y
- 11. 750 CE-E-232-112 1989 UT-M A-1 98Y
- 11. 750 CE-E-232-112 1989 UT-M A"1 98Y
- 11. 750 CE~E-232-112 1989 UT-M A-1.8 98Y 8.875 CE-E-232-112 1989
. 1 UT-M A-1.8-98Y 8.875 CE-E-232-112 1989 UT-M A-1.8 98Y 8.875 CE-E-232-112 1989 UT-M A-1.8 98Y 8.875 CE-E-232-112 1989 UT-M A-1.8 98Y 8.875 CE-E-232-112 1989 UT-M A-1.8 98Y 8.875 CE-E-232-112 Page number 5
PALISADES NUCLEAR PLANT 06/13/96 INTERVAL 3 ISi PROGRAM PLAN REVISION:
EXAMINATION CATEGORY 8-A CHANGE: 0
.SY~
PERIOOCS)
NPS DRAWING/
ITEM REFERENCE ID CODE YR OUTAGE CS)
"t" EXAM PROCEDURE STRESS ISO RPV 81.21 4-113 1989 UT-M A-1.10 98Y 5.375 CE-E-232-113-6 RPV 81.22R 1-113A 1989 UT-M A-1.10 RELIEF REQUEST: RR-11 98Y 5.375 CE-E-232-112 RPV 81.22R 1-1138 1989 UT-M A-1.10 RELIEF REQUEST: RR-11 98Y 5.375 CE-E-232-112 RPV 81.22R 1-113C 1989 UT-M A-1.10 RELIEF REQUEST : RR-11 98Y 5.375 CE-E-232-112 RPV 81.22R 1-1130 1989 UT-M A-1.10 RELIEF REQUEST: RR-11 98Y 5.375 CE-E-232-112 RPV 81.22R 1-113E 1989 UT-M A-1.10 RELIEF REQUEST: RR-11 98Y 5.375 CE-E-232-112
.... 81.22R 1-113F 1989 UT-M A-1.10 RELIEF REQUEST: RR-11 98Y 5.375 CE-E-232-112 RPV.
81.30.
7-112 1989 UT-M A-1.8 98Y 11.000 CE-E-232-112 RVH 81.22 1-118A 1989 3
UT A-1.2 05Y 8.625 CE-E-232-112 RVH 81.22 1-1188.
1989 3
UT A-1.2 05Y 8.625 CE-E-232-112 RVH 81.22 1-118C 1989 3
UT A-1.2 05Y 8.625 CE-E-232-112 RVH 81.22 1-1180 1989 3
UT A-1.2 05Y 8.625 CE-E-232-112
.Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat Page number 6
.SYS ITEM REFERENCE ID RVH 81.22 1-118E RVH 81.22 1-118F RVH 81.40R 6-118A RELIEF REQUEST:
Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat RR-2 PALISADES NUCLEAR PLANT 06/13/96 INTERVAL 3 ISi PROGRAM PLAN REVISION:
EXAMINATION CATEGORY 8-A CHANGE: 0 PERIOO(S)
NPS DRAWING/
COOE YR OUTAGE(S)
"t" EXAM PROCEDURE STRESS ISO 1989 3
UT A-1.2 05Y 8.625 CE-E-232-112 1989 3
UT A-1.2 05Y 8.625 CE-E-232-112 1989 1,2,3 186.00 UT A-1.2 98N02N05Y 9.000 MT CE-E-232-118-9 Page number 7
SYS ITEM REFERENCE ID PR 82.11R 3-982 RELIEF REQUEST : RR-6 PR 82.11R 5-988 RELIEF REQUEST: RR-6 PR 82.12 2-982A PR 82.12 2-982C PR 82.21 2-983 PR 82.22R 1-983A RELIEF REQUEST: RR-6
... 82.22R 1-9838 RELi EF REQUEST: RR-6 PR 8,?.22R 1-983C
- RELIEF REQUEST: RR-6 PR 82.22R. 1-983D RELi E F REQUEST: RR-6 PR 82.22R 1-984A RELi E F REQUEST: RR-6*
PR 82.22R 1-9848 RELIEF REQUEST: RR-6 PR 82.22R 1-984C RELi E F REQUEST:
Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat RR-6 PALISADES NUCLEAR PLANT 06/13/96 INTERVAL 3 ISi PROGRAM PLAN REVISION:
EXAMINATION CATEGORY 8-8 CHANGE: 0 PERIOD(S)
NPS DRAWING/
CODE YR OUTAGE(S) lltll EXAM PROCEDURE STRESS ISO 1989 119.50 UT NDT-UT-11 A-2 Cross Ref.
96Y 4.800 CE-E-231-502 1989 2
119.50 UT A-2 02Y 4.800 CE-E-231-501 1989 3
UT A-2 Cross Ref.
05Y 5.938 CE-E-231-502 1989 2
UT A-2 Cross Ref.
02Y 5.800 CE-E-231-502 1989 3
UT A-2.1 03Y 5.000 CE-E-231-983 1989 2
UT A-2.1 OOY 4.900 CE-E-231-982 1989 2
UT A-2.1 OOY 4.519 CE-E-231-982 1989 2
UT -
A-2.1 OOY 4.900 CE-E-231-982 1989 2
UT A-2.1 OOY 4.800 CE-E-231-982 1989 UT NDT-UT-11 A-2 Cross Ref.
96Y 4.800 CE-E-231-984 1989 UT NDT-UT-11 A-2 Cross Ref.
96Y 4.800 CE-E-231-984 1989 UT NDT-UT-11 A-2 Cross Ref.
96Y 4.800 CE-E-231-984 Page number 8
Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat Page number 9
SYS ITEM REFERENCE ID PR 83.110R 1-986 RELIEF REQUEST:
PR 83.110R 3-985 RELIEF REQUEST:
PR 83.110R 8-986 RELIEF REQUEST:
PR 83.110R 8-986A RELIEF REQUEST:
PR 83.110R 8-9868 RELIEF REQUEST:
PR 83.110R 8-986C RELIEF REQUEST:
.PR 83. 120 1-986-IRS PR 83 *. 120
,3-985-IRS PR 83.120 8-986A-IRS PR 83.120 8-9868-IRS PR 83.120 8-986C-IRS PR 83.120 8-986-IRS Re~rt: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat RR-6 RR-6 RR-6 RR-6 RR-6 RR-6.
PALISADES NUCLEAR PLANT 06/13/96 INTERVAL 3 ISi PROGRAM PLAN REVISION:
EXAMINATION CATEGORY 8-D CHANGE: 0 PERIOD(S)
NPS DRAWING/
CODE YR OUTAGE(S)
"t" EXAM PROCEDURE STRESS ISO 1989 2
13.62 UT A-2 02Y 5.000 CE-E-231-983 1989 24.62 UT NDT-UT-12 A-2 Cross Ref.
96Y 4.800 CE-E-231-983 1989 2
10.62 UT A-2.5 02Y 4.900 CE-E-231-986 1989 2
10.62 UT A-2 02Y 4.600
. CE-E-231-983 1989 2
10.62 UT A-2.5 02Y 5.000 CE-E-231-986 1989 2
10.62 UT A-2.5 02Y 4.800 CE-E-231-986 1989 2
4.06 UT A-2 02Y 5.000 CE-E-231-983
,1989
_1
- 11.37. "UT NDT-UT--12
.-
- A-2, Cross -Ref...
' 4:800 96Y CE-E-231-983 1989 2
3.00 UT A-2 02Y 2.563 CE-E-231-983 1989 2
3.00 UT A-2.5 02Y 2.563 CE-E-231-986 1989 2
3.00 UT A-2.5 02Y 2.563 CE-E-231-986 1989 2
3.00 UT A-2.5 02Y 2.563 CE-E-231-986 Page number 10
PALISADES NUCLEAR PLANT 06/13/96 INTERVAL 3 ISi PROGRAM PLAN REVISION:
EXAMINATION CATEGORY 8-D CHANGE: 0 PERIOD(S)
- NPS DRAWING/
SYS ITEM REFERENCE ID CODE YR OUTAGE(S)
"t" EXAM PROCEDURE STRESS ISO RGA 83.150R E-56A-05 1989 3
6.00 UT A-34 RELi E F REQUEST: RR-5 03Y 0.840 ATLAS D-1733 RGA 83.150R E-56A-07 1989 2
2.88 UT A-34 RELIEF REQUEST: RR-5 02Y 0.600 ATLAS D-1733 RGA 83.160R E-56A-05-IRS 1989 3
1.85 UT A-34 RELIEF REQUEST: RR-5 03Y ATLAS D-1733 RG8 83.150R E-568-05 1989 3
6.00 UT A-34 RELi E F REQUEST: RR-5 03Y 0.760 ATLAS D-1733 RG8 83.150R E-568-07 1989 2
2.88 UT A-34 RELi E F REQUEST: RR-5 02Y 0.600 ATCAS D-1733 RG8 83.160R E-568-05-IRS 1989 3
1.85 UT NDT-UT-01 A-34 RELi E F REQUEST: RR-5 03Y ATLAS D-1733
.RPV 83.100 5-114A-IRS 1989 35.12 UT-M A-1.11 98Y 10.500 CE-E-232-116 RPV 83.100 5-1148-IRS
- 1989,
- 1 35.12 UT-M A-1. 11 98Y 10.500 CE-E-233-116 RPV 83.100 5-114C-IRS 1989 35.12 UT-M A-1.11 98Y 10.500 CE-E-233-116 RPV 83.100 5-114D-IRS 1989 35.12 UT-M A-1. 11 98Y 10.500 CE-E-233-116 RPV 83.100 5-114E-IRS 1989 48.00 UT-M A-1.11 98Y 11.000 CE-E-233-116 RPV 83.100 5-114F~IRS 1989 48.00 UT-M A-1.11 98Y 11.000 CE-E-233-116
.Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat Page nunber 11
.SYS ITEM REFERENCE ID RPV 83.90 5-114A RPV 83.90 5-1148
'RPV 83.90 5-114C RPV 83.90 5-114D RPV 83.90 5-114E RPV 83.90 5-114F SG1 83.130R 1-102-251A RELIEF REQUEST:
SG1 83.130R 1-102-2518 RELIEF REQUEST:
SG1 83.130R 1-104-251 RELIEF REQUEST:
SG1 83.140 1-102-251A-IRS SG1 83.140 1-102-2518-IRS SG1 83.140 1-104-251-IRS Re~rt: plan_cat Fi le: dcprogma Index: intrvl_3/s-plan_cat RR-4 RR-4 RR-4 PALISADES NUCLEAR PLANT 06/13/96 INTERVAL 3 ISi PROGRAM PLAN REVISION:
EXAMINATION CATEGORY 8-D CHANGE: 0 PERIOD(S)
NPS DRAWING/
CODE YR OUTAGE CS)
"t" EXAM PROCEDURE STRESS ISO 1989 59.12 UT-M A-1.11 98Y 11.000 CE-E-232-116 1989 59.12 UT-M A-1.11 98Y 11.000 CE-E-233-116 1989 59.12 UT-M A-1.11 98Y 11.000 CE-E-233-116 1989 59.12 UT-M A-1.11 98Y 11.000 CE-E-233-116 1989 73.06 UT-M A-1.11 98Y 11.000 CE-E-233-116 1989 73.06 UT-M A-1.11 98Y 11.000 CE-E-233-116 1989 3
UT A-3 03Y 7.500 1989 3
UT A-3 03Y 7.600 1989 3
UT A-3 03Y 7.500 1989 2
UT A-3 02Y 8.000 1989 2
UT A-3 02Y 7.600 1989 3
UT A-3 03Y 7.500 Page number 12
I SYS ITEM REFERENCE ID SG2 83.130R 2-102-351A RELIEF REQUEST:
SG2 83.130R 2-102-3518 RELIEF REQUEST:
SG2 83.130R 2-104-351 RELIEF REQUEST:
SG2 83.140 2-102-351A-IRS SG2 83.140 2-102-3518-IRS SG2 83.140 2-104-351-IRS Report: plan_cat File: dcprogma Index: intrvl_3/s-plan_cat RR-4 RR*4 RR-4 PALISADES NUCLEAR PLANT INTERVAL 3 ISi PROGRAM PLAN CODE YR 1989 1989 1989 1989 1989 1989 EXAMINATION CATEGORY 8-D PERIOD(S)
OUTAGE CS) 98Y 98Y 98Y 98Y 98Y 98Y I.
\\
NPS lltll 06/13/96 REVISION:
CHANGE: 0 DRAWING/
EXAM PROCEDURE STRESS ISO UT A-3 UT A-3 UT A-3 UT A-3 UT A-3 UT A-3 Page nllllber 13
ATTACHMENT 5 CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION INSERVICE INSPECTION PROGRAM REVISED RELIEF REQUEST RR-4
RELIEF REQUEST NUMBER - RR-4 COMPONENT IDENTIFICATION Code Class 1
Code Reference IW8-2500 Table IW8-2500-1 Examination Category 8-0 Item Number 83.130 Component Description Steam Generator Nozzle to Shell Welds,*
1-104-251, 1-102-251A, 1-102-2518, 2-104-351, 2-102-351A, 2-102-3518 Reference Drawings RSG90-C251-001 and RSG90-C251-003 Figure IW8-2500-7(A)
CODE REQUIREMENT Section XI, Table IW8-2500-1 requires all nozzle to vessel welds to be volumetrically examined once during each inspection interval.
BASIS FOR RELIEF
-For purposes of discussion, Figure IW8-2500-7(a) (attached) will be used to describe the 4 required weld volumes. With the exception of the nozzle inner radius section, this figure is the closest configuration to our actual nozzles.
- CPCO working with EPRI have developed the attached package. The attached information is an excerpt from the EPRI report and is intended to identify the exam volumes within the areas of Umitations. The final EPRI report will identify exam volumes within the area.~. of limitations (attached information), exam volumes where no limitations exiSt* and the composite exam volumes. The final composite exam volumes will be slightly higher since this will include the areas where no limitations exist.
However, the code required exam volume will not be achieved and this relief request is necessary.
The attached package includes:
- 1)
Figure defining exam volumes.
- 2)
Inlet nozzle inner radius coverage table followed by supporting figure.
- 3)
Inlet nozzle-to-shell weld exam volume.
- 4)
Axial scan coverage table for inlet nozzle-to-shell weld followed by supporting figures.
- 5)
Transverse scan (no probe skewing) coverage table for inlet nozzle-to-shell weld followed by supporting figures.
- 6)
Transverse scan (+/-20° probe skewing) coverage table for inlet nozzle-to-shell weld followed by supporting figures.
- 7)
Outlet nozzle inner radius coverage table followed by supporting figure.
- 8)
Outlet nozzle-to-shell weld exam volume.
. 9)
Axial scan coverage table for outlet nozzle-to-shell weld followed by supporting figures.
- 10)
Transverse scan (no probe skewing) coverage table for outlet nozzle-to-shell weld followed by supporting figures.
- 11)
Transverse scan (+/-20° probe skewing) coverage table for outlet nozzle-to-shell weld followed by supporting figures.
There are 2 acronyms used in the EPRI report for identification, they are Consumers Power - Steam Generator Project Inlet Nozzle (CP-SGPIN) and Consumers Power -
Steam Generator Project Outlet Nozzles (CP-SGPON).
The computer based modeling was performed on one steam generator and this is intended to address all primary head nozzle welds in both steam generators. The steam generators are identical in design.
The probe skew angle for the axial exams are identified as 0° and 180° within the coverage tables. The probe skew angle for the transverse exams were modeled using a 90° and then offset using a 70°and 110° skew to increase exam volume coverages.
In* summary, the examination volumes are limited and the maximum achievable volumes within the areas of limitations are accurately identified. A relief request from the code required examination.volumes is necessary. The final EPRI report will be on file at CPCO upon completion.
- PROPOSED ALTERNATIVE EXAMINATION All accessible weld volumes will be examined once per interval in lieu of the 100%
volumetric examination requirements.
/
/
I I
I REQUIREMENTS FOR CLASS 1 COMPONENTS Fig. IWB-2500-7(a) tn1
- tn2 *nozzle wall thickneu t1 *shell (or head) thickness r; "nozzle inside corner radius
' \\
\\
I I
Cl.
I
~o E I
"'z
)(
I UJ :!
ir--j
'I I
- I I
'I
'1,--,
I I
0 E
I I
J Exam. vol.
A - B - C - D - E - F -G - H-I Cladding where present Corner flaw EXAMINATION REGION !Note (111 Shell (or head) adjoining region Attachment weld region Noule cylinder region N~le inside corner region
\\~. *.
NOTES:
EXAMINATION VOLUME )Note (211 C*D*E*F B-C*F*G A*B*G*H*I M-N-0-P (1) Examination regions are identified for the purpose of differentiating the acceptance standards in IWB-3512.
(2) Examination volumes may be determined either by direct measurements *on the component or by measurements based on design drawings.
FIG. IWB-2500-7Ca> NOZZLE IN SHELL OR HEAD
<Examination Zones in Barrel Type Nozzles Joined by Full Penetration Comer Welds) 89
Coveraqe Table (CP-SGPIN)
I Probe Angle I
35 Probe Skew I
90 Probe Location Blend*
Examination Volume M-N-0-P 100%
I
- Contoured Wedge I
82 I I I
81 I -,
I
! i _I 80 i
I 79 I -,
I I
I 78 *-'
I 77 *-1 76 _I
- -1 72
-I 71 SGIN4555.XLS Chart 5 Palisades SG Inlet Nozzle: Combined Coverage N '_-_,-6 I
I M
38/11 O (boss) 35/90 (blend)
,,' ~*,','
.. -~~*~~~-~~~-~~-***
Class I Inner Radius Exam Volume M-N-0-P 70 69 -I f
8 l
20 21 22 23 24 25 26 27 28 29 30 31 32
85 -
84 83 82 81 80 -
79 78 77 76 -
75 74 -
73 -
72 71 70 69 68 67 66 -
65 64 -
63 62 61 I
Examination Volume (CP-SGPIN)
I I
I I
I I
60 ---t-1--1-1--~---l--l-t-l--J--1--t-t-~l---l-J-j--j--+--1---1-1--1---1----+---1----1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Coverage Table (CP-SGPIN)
I I
I I
I Probe Angle I 45 I 45 I 60 60 Probe Skew i
0 I 100 I 0 180 Probe Location
- I Shell I Boss I Shell Boss I
I I
Examination Volume C-0-E-F I 100%i 0% I 93%
0%
Examination Volume 8-C-F-G.
I 87% I 0% I 90%
0%
Examination Volume A-8-G-H-I I 53% I 0% I 63% I 12%
Total Weld Examination Volume A-8-C-D-E-F-G-H-I I 79% i 0% I 81% I 5%
.1*.
z 85 84 -
83 82 81 80 79 78 -
77 76 75 74 73 -
72 71.
70 69 68 67 66 65 64 -
63 62 61 Coverage For Probe Angle=45 Deg; Probe Skew=O Deg (CP-SGPIN) 60 -
I -~-l-l-l-1-l-l-~l-~1-l-l-~l-l--l-l-+--1--1-l*-l-l-l-l-*-I 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
85 84 83 82 81 80 79 78 -
77 76 75 74 73 -
z 72 71 70 69 68 67 66 65 64 63 62 61 60 -
Coverage For Probe Angle=45 Deg; Probe Skew=180 Deg (CP-SGPIN)
-l--l-l-l-~l-l-l--1--'--l--l-I-* l--+--+--~l--f-1-1-f-f-f-l-l-f--I 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R.
z 85 84 83 82 81 80 -
79 78 77 76 75 74 73 72 71 70 69 68 67 66 -
65 64 63 62 61 -
Coverage For Probe Angle=60 Deg; Probe Skew=O Deg (CP-SGPIN) 60 -
l--l-l--l-l--l-/---l-l-l-l-l-l--i-l-l-l-~--1--1--1---1----1-----1--1----+--+----1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
z 85 -
84 -
83 82 81 80 79 78 -
77 76 75 74 73 72 71 70 69 68 -
67 66 65 64 63 62 61 Coverage For Probe Angle=60 Deg; Probe Skew=180 Deg (CP-SGPIN) 60 -t->------+--1-1-1-1-f-l-l-1---f-H-I I 1-1-1-1-* +-l-l-l-1-1-1---l--1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
z
- 85.
84 83 -
82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 -
65 64 63 62 61
'I Combined Coverage (CP-SGPIN) 60 -l-l---ll-1-1-1-1-l*--'--l-1'"--. ~1-1-1-1--1--1-1-1-1-1-1-1-1--1-1----1--1 20 21 22 23 24 25 26 27 28 29 30,* 31 32. 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
/
j Coverage Table (CP*SGPIN) i I
I I
Probe Angle I 45 I 45 I 60 I 60 I
Probe Skew l 90 I 90 I *go I 90
\\
Probe Location I Shell I Boss. Shell i Boss I
I I
Examination Volume C*D*E*F I 100%/ 0%
92% ! 0%
Examination Volume B*C*F*G I 58% I 0%
0% I 0%
Examination Volume A-B~G-H-1 I 0% I 0% I 0% I 0%
Total Weld Examination Volume A*B*C*D*E*F*G*H*I i 54% I 0% / 42% I 0%
85 -
84 83 82 81 Coverage For Probe Angle=45 Deg; Probe Skew=90 Deg (CP-SGPIN)
. 80 z
79 -
78 -
77 76 75 74 73 72 71 70 69 68 67 66 65 64 -
63 62 61 60 -t-+--ll-H-1-1-1-1-H*-t---t--t 1-1-1-1-1-1--1-1--1-1-1-1-1--1-1 20 21 22 23 24 25 26 27 28 29 30 31 32. 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 A
z 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 -
62 -
61 Coverage For Probe Angle=45 Deg; Probe Skew=90 Deg (CP-SGPIN)
I I
I I
60 --1-1-1-1-1-. 1-1-1-. I 1----f---l. I 1--1 *-t-1 -t--f-l*-l---~l--1--1*--l---+-*1--+-+---1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 A
z 85 84 -
83 82 -
81 80 79 78 77 76 75 74 73 -
72 71 70 69 68 67 66 65 64 63 62 61 60 Coverage For Probe Angle=60 Deg; Probe Skew=90 Deg (CP-SGPIN) 1--+-1--1--1-J-l-l-/-l_,_-l-l-I 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
z Coverage For Probe Angle=60 Deg; Probe Skew=90 Deg (CP-SGPIN) 85 84 83 82 81 80 79 78 I
77 I
76 I
75 74 I
73 72 71 -
70 -
69 68 67 66 65 64 63 62 61 60 - --1-1--1--1--1--1-+-l-f-l-l-l---l-l-l-l-l-l-l-l-l--l-l-l-l--l--l---1 20 21 22 23 24 25 26 27 28 29 30 31
- 32. 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
z Combined Co~erage (CP-SGPIN) 85 84 83 82 81 80
~
79 78 77 76 -
75 74 73 72 71 70 -
69 -
68 67 66 65 64 63 62 61 60 -
f-----l-H 1-. -l-f---l--l--+--1-~-1-1-. ~-. I-+-!-*
l-~-1-1-1---1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
Coveraqe Table (CP-SGPIN) i I
I I
I i
Probe Angle i 45 I 45 ! 60 I 60 I
Probe Skew I 70 I 110 I 70 I 110 Probe Location I Shell I Boss i Shell i Boss I
I 1*
I Examination Volume C-0-E-F I 100%1 0% I 100%1 0%
Examination Volume B-C-F-G I 78% I 0% I 76% I 0%
. Examination Volume A-B-G-H-1
/ 19% I 0% I 16% ! 0%
Total Weld Examination Volume A-B-C-0-E-F-G-H-I I 64% I 0% ! 63% I 0%
z 85 84 -
83 82 81 80 -
79 78 77 76 75 74 -
73 72 71 70 69 68 67 66 65 64 63 62 61 Coverage For Probe A:~gle=45 Deg; Probe Skew=70 Deg (CP-SGPIN) 60 -t-+-*l--.-+~-1'--'-<----r--i--I * --t-~I l-1-* l-l-l---1----1----l-f--l----l-l--l*--l----I 20 21 22 23 24 25 26 27 28 29 30 :31 32 *33 34 35 36 37 38 39. 40 41 42 43 44 45 46 47 48
~
R
z 85 84 83 82 81 80 79 78 77 76 -
75 74 73 -
72 71 70 69 68 67 66 65 64 63 62 61 Coverage For Probe Angle=45 Deg; Probe Skew=11 O Deg (CP-SGPIN) 60 f-------l-1-1-1--11-1---'l--l-1---1H-l-l-l-1--. l - -1-~-1-1-1-1-1-1-1-1 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
z Coverage For Probe Angle=60 Deg; Probe Skew=70 Deg (CP-SGPIN) 85 84 83 82 81 80 79 78 77 76 -
75 74 -
73 72 71 70 69 68 67 66 65 64 63 62 61 60 - -l---l-l-1--l-l-l-l-l-l-1--1-_ l-l-l-l-H--+---l---l-l--l---l-+--1--1-----I 20 21 22 23 24 25 26 27 28 29 '30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
z 85 -
84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 -
64 63 62 61 Coverage For Probe Angle=60 Deg; Probe Skew=11 O Deg (CP-SGPIN)
I I
I 60 --H-1-1 l-l---+--11-l-l-1-1-1-l-l-l--l-l-I 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3.7 38 39 40 41 42 43 44 45 46 47 48 R
z 85 84 83 -
82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 -
62 61 Combined Coverage (CP-SGPIN) 60 -
1--1--1---1-1-~1-1-1-~1-1-1-1-1-~1-1-+-1--1---1--+------1--1----1---1 20 21 22 23 24 25 26 27 28 29 :30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 R
Coverage Table (CP-SGPON)
I Probe Angle I
35 Probe Skew I
90 Probe Location I Blend*
I Examination Volume M-N-0-P I 100%
I I
- Contoured Wedoe I
SGOT3885.XLS Chart 4 Palisades SG Outlet Nozzle: Combined Coverge 84 T 83 I 82 81 80 79 78
- T 75 74 73 I
i -
. 1-----
N -
72 _&lass I Inner Radius Exam Volume M-N-0-P I
71 _I 14 15 16 17 18.
19 38/11 O (boss)
.~
I I
I I
I I
I I
20 21 22 23 24
~
- Examination Volume (CP-SGPON) 85 84 83
- A 82 I
81 I
I 80 I
- 79 I
78 I.
I 77 I
76 75 74 73 72 71 70 69 68 67 66 65 r
l-1-1-1-1-1 14 15 16 17 18 19
- 20. 21 22 23 24 25 26 27 28 29 30 31 32
Coverage Table (CP-SGPON)
I Probe Angle 45 45 60 60 Probe Skew 0
180 0
180 Probe Location Shell Boss Shell Boss I !
Examination Volume C-D-E-F 86% I 0%
57%
0%
Examination Volume 8-C-F-G 87% I 0%
67%
0%
Examination Volume A-B*G*H-1 48% i 0%
46% 10%
Total Weld Examination Volume A*B*C*D-E*F*G*H-1 71% I 0%
54%
4%
85 84 83 82 81 80 79 78 77 76 z 75 74 73 72 71 70 69 68 67 66 Coverage For Probe Angle=45 Deg; Probe Skew=O Deg (CP-
-- SGPON)
I 65 - --l-l--l--l-l-l-1-1-1-l-l-l--l-l-l-l-l--I 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
85 -..
84 - -
83 82 81 80 79 -
78 77 76 Z75 -
74 73 72 71 -
70 -
69 68 67 66
- coverage For Probe Angle=45 Deg; Probe Skew=180 Deg (CP-SGPON) 65 --1-1-1-1 1---.1-.1-1-1-1--1-1-1-1--1--1-1-1 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
85 84 83 82 81 80 79 78 -
77 76 z 75 74 73 -
72 71 70 69 -
68 67 66 65 14 15 Coverage For Probe Angle=60 Deg; Probe Skew=O Deg (CP-
. SGPON)
I 1-1 l-1--1-1--1-1-I 1-1-1-1 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
85 84 83 82 -
81 80 79 78 -
77 76 Z75 74 73 72 71 70 -
69
. 68 67 66
_,i *
- Coverage For Prol:je Angle=60 Deg; Probe Skew=180 Deg (CP-SGPON)
I I
I I
I I
I I
I I
I I
I I
I I
I
.. i,..
I I
I I
I I
I 65 --1---1-1. -1 -1-1-1-. 1.. ------'----1-1-1-1-1-1 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29' 30 31 32 R
85 -
84 83 82 81 80 79 78 77 76 z 75 74 73 -
72 71 70 69 68 -
67 -
66 Combined Coverage (CP-SGPON) 65 -
l-l-f-f-l-l-1-l-1-l-l-1--1-1-l-l-l---I 14 15 16 17 18 19'20 21 22 23 24 25 26 27 28 29 30 31 32 R
Coveraqe Table (CP-SGPON)
Probe Anqle 45 45 60 60 Probe Skew 90 90 90 90 Probe Location Shell Boss Shell Boss I
Examination Volume C-0-E-F 100% 0%
60%
0%
Examination Volume B-C-F-G 14%
0%
0%
0%
Examination Volume A-B-G-H-1 0%
0%
0%
0%
Total Weld Examination Volume A-B-C-D-E-F-G-H-1 39%
0%
22%
0%
85 84 83 82 81 Coverage For erol>e Angle=45 Deg; Probe Skew=90 Deg (CP-SGPON)
I 80 -
79 78 77 76 Z75 74 73 72 71 70 69 68 67 66 65 -+----+----+----+----+----l--l--J-.--i---i--+---1-1-f-j-1--1--11-J 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
85 84 83 82 81 80 79 78 77 76 Z75 74 73 72 71 70 69 68 67 66 65 14 15 Coverage For Probe Angle=45 Deg; Probe Skew=90 Deg (CP-SGPON)
I.,
I I
I I
I I
I i-:-1-1 1-1-1-1-1-1 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
.R
85 84 83 82 81 80 79 78 77 76 z 75 74 73 72 71 70 69
.68 67 66 65 14 15 Coverage For Probe Angle=60 Deg; Probe Skew=90 Deg (CP-SGPON)
I 1..
1-1--i 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 R
31 32
85 84 83 82 81 80 79 78 77 76 Coverage For Probe Angle=60 Deg; Probe Skew=90 Deg (CP-SGPON)
I I
I I
I Z75 74 73 72 71 -
70 69 68 67 66 65 -f--t---t---t---t---t--t--+---t--+---1--1---1-j-j-j-j-j-j 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
Combined Coverage (CP-SGPON) 85 84 83 f
82 I
81 I
80 I
79 I
I I
78 I
I 77 I
I I
76 I
I I
Z75 I
I I
74 I
I I
73 I
72 71 70 69 68 67 66 65 1-1 1-1-1 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
Coverage Table (CP-SGPON)
I Probe Angle 45 45 I 60 I 60, Probe Skew 70 110 10 I 110 Probe Location Shell Boss Shell I Boss I
Examination Volume C-D-E-F 100% 0%
1 ooo/o I 0%
Examination Volume 8-C-F-G 80%
0%
59% I 0%
Examination Volume A-8-G-H-1 8%
0%
0% I 0%
Total Weld Examination Volume A-B-C-D-E~F-G-H-1 54%
0%
47% I 0%
85 84 83 82 81 80 79 78 77 76 Z75 74 73
- 72 71 70 69 68 67 66 65 Coverage For Probe Angle=45 Deg; Probe Skew=70 Deg (CP-SGPON)
-t--i--t---t--t---t---t---f--t--t--f--f---f~--+--1-1-1-1~
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
85 84 83 82 81 80 79 78 77 76 Z75 74 73 72 71 70 69 68 67 66 "65 Coverage For Probe Angle=45 Deg; Probe Skew=11 O Deg (CP-SGPON).
14 15 16 17 18 1~ 20 21 22 23 24 25 26 27 28 29 30 31 32 R
85 84 83 82 81 80 79' 78 77 76 Z75 74 73 72 71 70 69 68 67 66 65 14 15 Coverage For Probe Angle=60 Deg; Probe Skew=70 Deg (CP-SGPON)
/ -
I I
- I 1-1 16 17 18 *19 20 21 22 23 24 25 26 27 28 29 30 R
31 32
85 84 83 82 81 80 79 78 77 76
. Z75 74 73 72 71 70 69 68 67 66 65 Coverage For Probe Angle=60 Deg; Probe Skew=11 O Deg (CP-SGPON) 14.15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
85 84 83 82 81 80 79 78 77 76 Z75 74 73 72 71 70 69 68 67 66 65 Combined Coverage (CP-SGPON)
I
-l--l--l--1--l---1---t---t--+---i--l--l--1----1---ll-\\--l-l-l-l 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R
ATTACHMENT 6 CONSUMERS POWER COMPANY PALISADES PLANT DOCKET 50-255 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION INSERVICE INSPECTION PROGRAM PALISADES PRESSURE TESTING PROGRAM EM-09-13