ML18065A791

From kanterella
Jump to navigation Jump to search

Forwards SE Re ISI Program Relief Requests for Snubber Insps for Plant.Proposed Alternative Provides Acceptable Level of Quality & Safety. Program Plan
ML18065A791
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/28/1996
From: Reinhart M
NRC (Affiliation Not Assigned)
To: Smedley R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18065A792 List:
References
TAC-M94524, NUDOCS 9607010282
Download: ML18065A791 (3)


Text

.

~*~)

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Richard W. Smedley Manager, Licensing Palhades Plant 27780 Blue Star Memorial Highway Covert, MI 49043 June 28, 1996

SUBJECT:

SAFETY EVALUATION OF THE INSERVICE INSPECTION PROGRAM RELIEF REQUESTS FOR SNUBBER INSPECTIONS FOR THE CONSUMERS POWER COMPANY PALISADES NUCLEAR PLANT (TAC NO. M94524)

Dear Mr. Smedley:

By letter dated January 17, 1996, Consumers Power Company (CPCo) submitted a request for approval of a snubber examination program alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, requirements for the Palisades Nuclear Plant, Second IO-Year Interval Inservice Inspection (ISi) Program Plan.

The Code of Federal Regulations, 10 CFR 50.55a, generally requires that ISi of certain ASME Code Class I, 2, and 3 components be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code applicable Edition and Addenda.

However, proposed alternatives may be approved by the staff pursuant to paragraphs (a)(3)(i) and {a)(3)(ii) of IO CFR 50.55a.

The staff has reviewed and evaJ,uated the information concerning the ISi program request for approval of an alternative test program submitted for the CPCo Palisades Nuclear Plant. The staff's evaluations and conclusions are contained in the enclosed safety evaluation.

The staff concludes that CPCo's proposal to perform the ISi program snubber inservice visual inspections in accordance with Palisades Technical Specification 4.16.l in conjunction with the visual examination acceptance criteria of OMa-1988, Part 4 is acceptable as an alternate method to the inservice examination requirements of the ASHE Boiler and Pressure Vessel Code, Subsection XI, Subarticle IWF 5300, paragraph (a). The staff has *

provides an acceptable level of quality and safety.

9607010282 960628 PDR ADOCK 05000255 P

. PDR

Mr. Richard W. Smedley Consumers Power Company cc:

Mr. Thomas J. Palmisano Plant General Manager Palisades Plant 27780 Blue Star Memorial Highway Covert, Michigan 49043 Mr. Robert A. Fenech Vice President, Nuclear Operations Palisades Plant 27780 Blue Star Memorial Highway Covert, Michigan 49043 M. I. Miller, Esquire Sidley & Austin 54th Floor One First National Plaza Chicago, Illinois 60603 Mr. Thomas A. McNish Vice President & Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Jerry Sarno Township Supervisor Covert Township 36197 M-140 Highway Covert, Michigan 49043 Office of the Governor Room 1 - Capitol Building Lansing, Michigan 48913 U.S. Nuclear Regulatory Commission Resident Inspector's Office Palisades Plant 27782 Blue Star Memorial Highway Covert, Michigan 49043 Pa 1 i sades Pl ant Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P. 0. Box 30630 CPH Mailroom Lansing, Michigan 48909-8130 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.

Washington DC 20037 Michigan Department of Attorney General Special Litigation Division 630 Law Building P.O. Box 30212 Lansing, Michigan 48909 June 1996

Mr. R. Jun(';): 28:,1996

  • If you have any questions regarding this review, please contact Marsha Gamberoni at (301) 415-3024.

Docket No.:

50-255 Sincerely,.

Original Signed By: (c{.r:!.<JYlll0>>-0'-fri lt *-?<

Mark Reinhart, Acting Director Project Directorate III-1 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation w/att cc w/encl:

See next page DISTRIBUTION:

Docket File PUBLIC FGrubelich PDIII-1 R/F JRoe SEDB OGC GHill (2)

TMcLellan ACRS BMcCabe, ED0/017G21 TPolich, RIII DOCUMENT NAME: G:\\WPDOCS\\PALISADE\\PAL94524.SE To receive a copy of this document, indicate in the box C=Copy w/o attachment/enclosure E=Copy with attachment/enclosure N = No copy OFFICE LA: PD31 E

PM:PD31 E

NAME CJamerson DATE 06f z<flg5 06/ZSf96 06/2?/96 OFFICIAL RECORD COPY