Forwards Insp Rept 50-255/95-11 on 950822-1011 & Notice of Violation
ML18065A278
Person / Time
Site: Palisades 
Issue date: 11/02/1995
From: Kropp W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18065A279 List:
References
NUDOCS 9511160349
Download: ML18065A278 (2)


See also: IR 05000255/1995011

Text

November 2, 1995

Mr. T. Palmisano, General Manager

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

Dear Mr. Palmisano:

SUBJECT:

INTEGRATED INSPECTION REPORT 50-255/95011

Dear Mr. Palmisano:

This refers to the routine safety inspection conducted by M. E. Parker,

P. F. Prescott and others of this office from August 22 through October 11,

1995.

The inspection included a review of activities at your Palisades

Nuclear Generating Facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, we noted that certain of your

activities appeared tri be in violation of NRC requirements, as specified in

the enclosed Notice of Violation (Notice).

The violation is of concern

. because an alternative to the Code vibration acceptance criteria was

implemented prior to NRC approval, and in fact, the relief request was twice

denied because the limits ~stablished did not provide sufficient assurance

that pump testing would detect degradation prior to reaching the vibration

limits.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken* and any additional

actions you plan to prevent recurrence; After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement actions is

necessary to ensure compliance with NRC regulatory requirements.

In addition, you continued to exhibit weakne~ses in foreign material control

and indications of poor plant material conditions.

Cracking of the generator

isophase bus connections, failure of a wire connection on the number two

governor valve linear variable differential transformer (LVDT), and failure of

the motor operated switchyard disconnects, led to two plant shutdowns and a

power reduction.

-: r" ~, 1 ,

-'l...v~**'i*u

'-' '- \\.J

9511160349 951102

PDR

ADOCK 05000255

G

PDR

T. Palmisano

-2-

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures and your response to this letter will be placed in

the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning th1s inspection.

Sincerely,

/s/I. N. Jackiw for

Wayne J. Kropp, Chief

Reactor Projects Branch 3

Docket No. 50-255

License No. DPR-20

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-255/950ll(DRP)

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

R. W. Smedley, Manager, Licensing Dept.

James R. Padgett, Michigan Public

Service Commission

Michigan Department of

Pobl ic Health

Department of Attorney General (Ml)

Distribution:

Docket File w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

SRI Palisades, Big Rock w/encl

Project Manager, NRR w/encl

Document:

R:\\insprpts\\powers\\pali\\pal95011.drp

DRP w/encl .

Riii PRR w/encl

G. E. Grant, Rill w/encl

IPAS (E-Mail) w/encl

To receive e copy of thia document, indicate in the box *c* * Copy without attach/encl *£* * Copy with attach/encl

  • N* *

Ho co

OFFICE

tJ

RII I

,

NAME

Caniano

g/Creed/Haus+n

Ul

~~ /Cameron

DATE

/o .. ~}e

~l \\ ~

OFFICIAL RECORD COPY