Forwards Wind Tunnel Predictions of Control Room Intake Concentrations from Three Sources of Radioactive Materials at Palisades Nuclear Power Plant, (CPP-Project-93-0907)
ML18064A425
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/17/1994
From: Haas K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18064A426 List:
References
NUDOCS 9410260099
Download: ML18064A425 (4)


Text

consumers Power KurtM. Haas Planr Safety and Licensing Director POWERING llAICHIGAll-S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 17, 1994 Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT MHA ANALYSIS - WIND TUNNEL TESTING TO DETERMINE SPECIFIC CONTROL ROOM INTAKE CONCENTRATIONS '

On October 6, 1994, a conference call was held with the NRC to align on the status of our efforts to resolve the final inputs for our MHA analysis. One of those efforts, which we have completed, was to determine site specific atmospheric dispersion factors for the plant site such that more realistic assumptions could be made concerning how radioactive dose concentrations transport to the control room.

The site specific efforts were completed by CERMAK PETERKA PETERSEN, INC.

(CPP), a Wind Engineering Consultant. CPP built a scale model of the Palisades plant and the surrounding area and subjected the model to various wind conditions inside a wind tunnel. Through the use of the wind tunnel and plant modeling to scale, specific conclusions were reached as to how a potential radioactive release might reach the control room ventilation system.

The NRC currently has a consultant under co~tract to review the site specific wind tunnel test results from another utility and has suggested that a timely submittal of our wind tunnel test results would help to ensure a timely review by the NRC.

The CPP report prepared for the Palisades Plant ("Wind Tunnel Predictions.of Control Room Intake Concentrations From Three Sources Of Radioactive Materials at the Palisades Nuclear Power Plant" (CPP Project 93-0907)) is provided for r--- . 94*10260099 I

PDR 941017 ADOCK 05000255

, Aoo\

_e._~_ -**~ PDR \\ \

A*EMs ENERGY COMPANY \

((j

  • 2 your review in Attachment 1. Attachment 2 contains the engineering analysis we used to document how the atmospheric dispersion factors from the wind tunnel tests were used in our MHA analysis.

SUMMARY

OF COMMITMENTS This letter contains no new commitments.

Kurt MHaas Safety and Licensing Director CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment

ATTACHMENT I Consumers Power Company Palisades Plant Docket 50-255 WIND TUNNEL TESTING TO DETERMINE SPECIFIC CONTROL ROOM INTAKE CONCENTRATIONS CPP Project 93-0907