Forwards Insp Rept 50-255/94-12 on 940701-0819.One non-cited Violation & Unresolved Item Noted
ML18059B194
Person / Time
Site: Palisades 
Issue date: 09/08/1994
From: Kropp W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18059B195 List:
References
NUDOCS 9409210060
Download: ML18059B194 (5)


See also: IR 05000255/1994012

Text

. ,~,**

-* \\

.

I

I +

I

  • .-***

Consumers Power Company

ATTN:

T. Palmisano

. General Manager

September 8, 1994

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

Dear Mr. Palmisano:

SUBJECT:

NRC INSPECTION REPORT NO. 50-255/94012

This refers to the routine* safety inspection conducted by Messrs .. M. E.

Parker, D. G. Passehl, R;. L. Hague, J. F .* Schapker, C. N. Orsini, and

K. Salehi of this office from July 1 through August 19, 1994.

The inspection

included a revi~w of activities at your Palisades Nuclear Generati~g Facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

Areas.examined during the inspection are identified in the repo~t. Within

these areas, the inspection consisted of a selective examination of pr~cedures

and representative records, interviews with personnel, and observation of

activities in progress.

The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

In addition, a meeting was held at your

Palisades Site on August 3, 1994, to discuss your Palisades Fabrication

Validation Plan to verify the acceptability of multi-assembly sealed baskets

(MSBs) for the dry spent fuel storage system.

There w~s one Unresolved Item identified.during this inspection pertaining to.*

material condition deficiencies of charging pump P-SSA that has led to an

increased out-of-service time to effect repairs.

Your s.taff agreed to respond

in writing within 60 days of receipt of this letter stating the actions you

propose to improve the material condition of the pump to reduce the out-of-

service time and the potential challenge to the Technical"Specification

Limiting Condition for Operations.

Based 6n the results of this insp~ction, certain of your activities fnvolving

sampling of spent fuel pool water for boron concentration during dry cask

loading activities, appeared to be in violation of NRC requirements.

How~ver,

as described in the enclosed inspection report, you identified this violation.

Therefore,* the violation will not be* subject to enforcement action because

your efforts in identifyin*g and correcting the violation* 'met the criteria

specified in Section VIl.B (2) of the "General Statement of Policy and

Procedure for NRC Enforcement Actions," (Enforcement Policy, 10 CFR Part 2,

Appendix C}. *

9409210060 940908

~DR ADOCK 05000255

PDR

~f: .i.

..

Consumers Powet Compahy

2

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. J.-Kropp, Chief

Reactor Projects Section 2A

Docket No. 50-255

License No~ DPR-20

Enclosure:

Inspection Report

No; 50-255/94012(DRP)

\\CC w/encl:

Robert A. Fenech, Vice President,.

Nuclear Operations

David W. Rogers, Safety

and Licensing Director

OC/LFDCB

Resident Inspector, Rill

James R. Padgett, Mi~higan Public

Service Commission

Michigan Departmerit of

Public Health

Department of Attorney General (Ml)

Palisades, LPM, NRR

SRI, Big Rock Point

G. E. *Grant, RI II

IPAS {E-Mail)

.

bee:

"Public"

{See attached concurrence)

\\** .. ,

. \\

! .. *

. ~ \\

DOCUMENT NAME:

R:\\insprpts/oowers/oali/oal94012.nrn

To receive 11 copy of thl* clocument, lndlc11te In the box: "C" ='Copy w~ut 11tt11chmeni78neloeur11 "E" = Copy with 11tt11chment/11ncloaur11 "N" = No copy

OFFICE

NAME

DATE

OFFICE

NAME

Riii

Orsini

09/ /94

{

~ .*

I

,...._ ~ * .....

I

Riii

I

JMc-Barger

09/ /94

Riii

I

Riii

I

Riii

Burgess

Lerch

Pirok

09/ /94

09/ /94

09/ /94

94

09

94

\\

  • , \\ .

I

Consumers Power Company

2

In accordance with 10 CFR 2.790 of the Commission's reg~lations, a copy of.

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning thi.s inspection.

Sincerely,

W. J. Kropp, Chief

. React6r Projects Section 2A

Docket No. 50-255

Litense No.

DPR~20

Enclosure:

Inspection Report

No. 50-255/94012(DRP)

.cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

.

David W. Rogers, Safety

and Licensing Director

OC/LFDCB

Resident Inspector, Riii

James R. Padgett, Michigan Publit

Service Commission

Michigan Department of

Public Health

Department of Attorney General (Ml)

Palisades, LPM, NRR

SRI, 'Big Rock Point

G. E. Grant, Riii

IPAS

(E~Mail)

DOCUMENT NAME:

C:

To receive 11 copy of thla document, Indicate In the box: *c* a Copy

~;~

'

-

\\E. a Copy with ettach~nt/ancloaure "N" = No copy

OFFICE

Riii

i::. RI I I

NAME

DATE

OFFICE

Riii

NAME

DATE

94

09

94

09 .

94

09

94

09

94

p.P. R[Gul

  • .§*':-"-

~/o

'?~,.........

.

~11'.L

"'

v~'.\\*

.. - s!J. ,-

r.

. .....

I)' .. ,..

'

c

.

q

& 1 ..... i. l)J, .

~

  • 'Vi"-£~@)11~-'..: .. :::

'-?."8

    • . y

~

~ r ~' ..

\\

  • ~ <*.~ 5-

V"".1'1'"/

.......... :-

~o ..

..........

Consumers Power Company

ATTN:

T. Palmisano

General Manager

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION Ill

801 WARRENVILLE ROAD

LISLE. ILLINOIS 60532-4351

September 8, 1994

Palisades Nuclear Generating Plant

27780 Blue Star Memorial. Highway

Covert, MI

49043-9530

Dear Mr. Palmisano:

SUBJECT:

NRC INSPECTION REPORT NO.

50~255/94012

This refers to the routine safety inspection conducted by Messrs. M. E.

Parker, D. G. Passehl, R. L.

Hagu~, J. F. S~hapker, c: N. Orsini, and

K. Salehi of this office from July 1 through August 19, 1994.

The inspection

included a review of activities at your Palisades Nuclear Generating Facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. **Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The purpose of the inspection was to determine

whether activities authorized by the license were conducted safely and in

actord~nce with NRC requirements.

In addition, a meeting was held at your

Palisades Site on August 3, 1994, to discuss your Palisades Fabrication

Validation Plan to verify the acceptability of multi~assembly sealed baskets

(MSBs) for the dry spent fuel storage system.

  • There was one Unresolved Item identified during this inspection pertaining to

material condition deficiencies of charging pump P-55A that h~s led to an

increased out-of-service time to effect repairs.

Your staff agreed to respond

. in writing within 60 days of receipt of this letter stating the actions you

propose to improve the material condition of the pump to reduce the out~of

service time and the potential challenge to th-e Technical Specification

Limiting Condition foi Operations.

Based on the results of this inspection, certain of your activities involving

sampling of spent fuel pool ~ater for boron concentration during dry cask

loading activities, appeared to be in violation of NRC requirements.

However,

as described in the enclosed inspection report, you identified this viol~tion.

Therefore, the violation will not be subject to enforcemen~ action because

your efforts in identifying and correcting the violation met the criteria *

specified in Section VII.B (2) of the "General Statement of Policy and

Procedure for NRC Enforcement Actions," (Enforcement Policy, IO CFR Part 2,

Appendix C).

Consumers Power Company

2

In accordance with 10 CFR 2.790 bf the Commissibn's re~ulations, a copy of

. this letter and the enclosed inspection report will be placed in the NRC

. Public Document Room .

. We will gladly discuss any questions you have concerning this inspection.

s~n~ereh{.

W. J~ropp, Chief

Reactor Projects .Se~tion 2A

Docket Nti. 50-255

License No. DPR-20

Enclosure:

Inspection Report

No. 50-255/94012(DRP)

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

David W. Rogers, Safety

and Licensing Director

OC/LFDCB

Resident Inspector, Riii

Jam~s R. Padgett, Michigan Public

Service Commission

Michigan Department of

Public Health

Department of Attorney General (Ml)

Palisades, LPM, NRR

SRI,. Big Rock Point

G,. E. Grant, RI II

IPAS (E-Ma*il)

.....