Forwards ...Simulator Four-Yr Test Rept & Schedule...For Next Four-Yr Period, Per 10CFR55.45(b)(5).Rept Describes Simulation Facility Performance Testing Completed During Past Four Yrs.Subj Facility Initially Certified on 900611
ML18059B062
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/13/1994
From: Rogers D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18059B063 List:
References
NUDOCS 9406200175
Download: ML18059B062 (1)


Text

(

POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant:

27780 Blue Star Memorial Highway, Covert, Ml 49043 June 13, 1994 Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555 David W. Rogers Plant Safety and Licensing Director DOCKET 50-255 - LICENSE DPR PALISADES PLANT - FOUR YEAR TEST REPORT FOR THE PALISADES SIMULATION FACILITY 10 CFR 55.45(b}(5}, "Certification of Simulator Facilities," requires simulator facility licensees to submit a report to the Commission which identifies any uncorrect~d performance test failures during the past four year period and a schedule for their correction.

The report must also include, (1) a description of the simulation facility performance testing completed during the past four years, (2) performance tests to be conducted on the facility during the subsequent four years, and (3) a schedule for the conduct of approximately 25% of the performance tests per year during that next four year period.

The attachment to this letter provides the required report.

The Palisades Simulation Facility was initially certified on June 11, 1990.

(l,j__u,~

David W. Rogers Plant Safety and Licensing Director CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment 9406200175 940613 PDR ADOCK 05000255

\\

R PDR A CM5 ENCR6Y COMPANY