September 9, 1993 EN 93-089 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:
Consumers Power Company (Palisades)
Docket No. 50-255 (EA 93-178)
Subject:
PROPOSED IMPOSITION OF' CIVIL PENALTY - $50,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $50,000 will be issued on or about September 14, 1993, to Consumers Power Company (Palisades Nuclear Plant).
This action is based on a June 15, 1993 event in which the licensee failed to uncouple one control rod* prior to removal of the reactor vessel head.
The violation is.reflected in (1) the failure of a Shift Supervisor *.
to pre~rief the auxiliary operators involved in the control rod uncoupling evolution; (2) failure of the auxiliary operators to conduct a dry run on a mock-up prior to the evolution as required by procedures; (3) the failure*to notify the control room after each control rod drive mechanism was uncoupled, as required by procedures; (4) a failure to retain the working copy of the rod uncoupling procedure; and (5) an inadequate procedure for verifying that the rods were uncoupled during removal of-the reactor vessel head.
Collectively, these failures ~e~res~nt a
- breakdown in the controls that are essential for the safe conduct of the vessel head removal activities.
In this case, the base severity Level III civil penalty of
$5o,ooo*could have* been mitigated by 50 percent (to $25,000) in recognition of the licensee's comprehensive corrective actions following this event.
However, to reflect the level of concern with which the staff viewed the licensee.'s failure to instiil in individuals a proper regard for compliance with procedures and to emphasize the need for careful attention to the control and conduct of the licensed activities involved here, the staff decided to. exercise discretion, pursua.nt *to Section VII.A. i of - - -.
the Enforcement Policy, and to propose a civil penalty in the amount of the base civii penalty,* notwithstanding the application Of the mitigation factors.
Accordingly, a civil penalty in the amount of $50,000 is being proposed.
It should be noted that the licensee has not been specif icaliy informed of the enforcement action.
The schedule for issuance and* notification is:
Mailing of Notice September 14, 1993 Telephone Notification of Licensee September 14, 1993 The State of Michigan will be notified.
9309150371 930909 PDR I&E I
o\\\\
- e
- 33 EN-93-089 PDR
EN 93-089 Page 2 The licensee has thirty days from the date. of the Notice in which to respond.
Following NRC evaluation of the response, the civil penalty may be remitted, mitigated, or impos.ed by Order.
Contact:
.J. Gray, OE, 504-2747 Distribution:
J. Lieberman, OE, 504-2741 OWFN_ ---
Chairman Selin*
Comm. Rogers comm. Remick Comm. de Planque SECY OCA OSP GPA OWFN EDO DEDR DEDS OE
.OI bGC MNBB oc AEOD Op Ctr Regional RI RII __ _
RIII Off ices RIV RV PHIL NL ---
IRM RES MAIL ADM:. Doc. Mgt. Br.
PDR OIG PRELIMINARY INFORMATION -
NOT FOR PUBLIC
- DISCLOSURE UNT~L PUBLICLY ANNOUNCED