Text
- '
Docket No. 50-25~~~
Consumers Power Company
ATTN:
Gerald B. Slade
General Manager
DEC 15 1992
Palisades Nuclear Generating Plant
27780 Blue Star Memorial Highway
Covert, MI 49043
Dear Mr. Slade:
This refers to the routine safety inspection conducted by
Mr. I. T. Yin of this office on November 23-24, 1992.
The
inspection included a review of authorized activities for your
P~lisades Nuclear Generating Plant facility.
At the conclusion
of this inspection, the findings were discussed with
Mr. R. D. Orosz, and others as identified in the enclosed report.
The enclosed copy of our inspection report documents our
evaluation of your Configuration Control Project (CCP) , including
your corrective action for deficiencies identified by the
CCP program.
Based on the results of this inspection, certain of your
activities appeared to be in violation of NRC requirements, as
specified in the enclosed Notice of Violation (Notice) .
The
violation is of concern because a change to a station operations
procedure resulted in the removal of a statement designed to
limit system operational parameters and prevent system
inoperability.
You are required to respond to this letter and should follow ~he
instructions specified in the enclosed Notice when preparing your
response.
In your response, you should document the specific
. actions taken and any additional actions you plan to prevent
recurrence.
After reviewing your response to this Notice,
including your proposed corrective actions and the results of
future inspections, the NRC will determine whether further NRC
enforcement action is necessary to ensure compliance with NRC
regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations,
a copy of this letter, the enclosures and your response(s) to
this letter will be placed in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice
are not subject to the clearance procedures of the Off ice of
Management and Budget as required by the Paperwork Reduction ~ct
of 1980, PL 96-511.
921222<><>23 921215 -
- DR
ADOCK 050002:>5
I lo I
Consumers Power Company
2
DEC 15 1992
- **:* We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
Bruce L. Burgess for
'
Geoffrey c. Wright, Chief
Operations Branch
Enclosures:
1.
2.
Inspection Report
No. 50-255/92026(DRS)
cc w/enclosures:
David P. Hoffman, Vice President
Nuclear Operations
P. M. Donnelly, Safety and
Licensing Director
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Palisades, LPM, NRR
SRI, Big Rock Point
v\\.l;/
dml
Yin/
12/t
/
I
n~!~~
~SS
12/ /Sf 92
RIII
J~nsen
12 Cb/92
~
12/l~/92