Informs That Preliminary Calculations Done by Siemans Power Corp,Indicate That TS Change Increasing Radial Peaking Factors Will Be Necessary for Upcoming Cycle 11 Fuel Cycle. Expected Changes Shown on Encl TS Page
ML18058B173
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/23/1992
From: Donnelly P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Masciantonio A
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18058B174 List:
References
NUDOCS 9210300103
Download: ML18058B173 (1)


Text

consumers Power PDWERIN&

MICHl&AN'S PRD&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 23, 1992 Mr. Armand Masciantonio Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - FORTHCOMING TECHNICAL SPECIFICATIONS CHANGE REQUEST - PEAKING FACTORS Preliminary calculations done by our fuel vendor, Siemans Power Corporation, indicate that a Technical Specifications change increasing our radial peaking factors will be necessary for the upcoming Cycle 11 fuel cycle. Due to the shorter than normal length of the current fuel cycle (Cycle 10), and the terms of our present fuel contract, final calculations to support these changes will not be complete soon enough to allow submittal of a Technical Specifications change request six months prior to the desired effective date.

Cycle 10 will end at the beginning of our next refueling outage, currently scheduled to begin on May 7, 1993. The refueling outage duration is expected.

to be 50 days. Taking. into account startup and physics testing our requested effective date of the Technical Specifications amendment will be about

  • June 15, 1993.

We are writing to allow you to fit review of this expected proposal into your schedule. We expect to submit the change request in January 1993.

The expected changes, indicated as the peaking factor limits for Reload 0, are shown on the attached Technical Specifications page.

diJ~

Patrick M. Donnelly Plant Safety and Licensing Director CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment I .