ML18058A954

From kanterella
Jump to navigation Jump to search
Final SALP II Rept 50-255/92-01 for Period Jan 1991 - Mar 1992
ML18058A954
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/01/1992
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML18058A951 List:
References
50-255-92-01-01, 50-255-92-1-1, NUDOCS 9207080092
Download: ML18058A954 (3)


See also: IR 05000255/1992001

Text

Enclosure 1

SALP 11

FINAL SALP REPORT.

U.S. NUCLEAR REGULATORY COMMISSION

REGION Ill

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

Inspection Report No. 50 255/92001

Consumers Power Company

Palisades Nuclear Generating Plant

January 1, 1991; through March 31, 1992

. ~gz7osoo92 92070 l

G

ADOCK 05000255

PDR

Enclosure 1

Palisades Nuclear Generating Plant

.

'

A.

Summary of Meeting with Consumers Power Company on June 30, 1992

The findings and conclusions of the SALP Board are documented in

Report No. 50-255/92001 and were discus~ed with the licensee on

June jU,

l~~z, at.tne Palisades Plant.

While the meeting was primarily a discussion between the licensee

and NRC, it was open to members of the public as observers.*

The following licensee and NRC personnel were in attendance, as well

as the noted ob~ervers.

Consumers Power Company

F. W. Buckman, President

D. P. Hoffman, Vice President Nuclear Operations

G. B. Slade, Plant General Manager

R. M. Rice, Plant Ope~atiohs Manager

R.' D. Orosz, Nuclear Engineering & Maintena'nce Manager

P~ M. Donnelly, Safety & Licensing Director

  • J. L. Hanson, Operations Superintendent

R. B. Kasper, Maintenance Superintendent

K. E. Osborne, System Engineering Superintendent .

C. S. Kozup, Technical Engineer

W. L.

Robert~, Senior Licensing Analyst

R. w: Smedley, Staff Licensing Engine~r

K .. A. Toner, Electrical/I&C/Computer Engineering Manager

T. J. Palmisano~ Outage & Operations Manager

Nuclear Regulatory Commission

C. J. Paperiello, Deputy Regional Administrator

W. D. Shafer, Chief, Reactor Projects Branch 2

.B. L. Jorgensen, Chief, Reactor Projects Section 2A

J. K. Heller, Senior Residerit Inspector

J. R. Roton, Resident Inspector

J. A. Isom, Senior Resident Inspector, D. C. Cook

D. G. Passehl, Resident Inspector, D. C. Cook

D. J. Hartland, Resident Inspector, D. C. Cook

A. S. Masciantonio, NRR Project Manager

M. K. Gamberoni, Project Engineer, NRR

S.

Sanders~ Intern

W. D. Pegg, Intern

D. Hann, Michigan Department of Public Health

Local Area Residents

' ,

2

Enclosure 1

B.

Comments Received from Licensee

Consumers Power Company's response to the Palisades Initial SALP 11

Report dated June 30, 1992, had no comments requiring revision to the

specific content of the report.

Because there is no revision, the

Initial SALP Report is considered the Final SALP Report~