Enclosure 1
SALP 11
FINAL SALP REPORT.
U.S. NUCLEAR REGULATORY COMMISSION
REGION Ill
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
Inspection Report No. 50 255/92001
Consumers Power Company
Palisades Nuclear Generating Plant
January 1, 1991; through March 31, 1992
. ~gz7osoo92 92070 l
G
ADOCK 05000255
Enclosure 1
Palisades Nuclear Generating Plant
.
'
A.
Summary of Meeting with Consumers Power Company on June 30, 1992
The findings and conclusions of the SALP Board are documented in
Report No. 50-255/92001 and were discus~ed with the licensee on
June jU,
l~~z, at.tne Palisades Plant.
While the meeting was primarily a discussion between the licensee
and NRC, it was open to members of the public as observers.*
The following licensee and NRC personnel were in attendance, as well
as the noted ob~ervers.
Consumers Power Company
F. W. Buckman, President
D. P. Hoffman, Vice President Nuclear Operations
G. B. Slade, Plant General Manager
R. M. Rice, Plant Ope~atiohs Manager
R.' D. Orosz, Nuclear Engineering & Maintena'nce Manager
P~ M. Donnelly, Safety & Licensing Director
- J. L. Hanson, Operations Superintendent
R. B. Kasper, Maintenance Superintendent
K. E. Osborne, System Engineering Superintendent .
C. S. Kozup, Technical Engineer
W. L.
Robert~, Senior Licensing Analyst
R. w: Smedley, Staff Licensing Engine~r
K .. A. Toner, Electrical/I&C/Computer Engineering Manager
T. J. Palmisano~ Outage & Operations Manager
Nuclear Regulatory Commission
C. J. Paperiello, Deputy Regional Administrator
W. D. Shafer, Chief, Reactor Projects Branch 2
.B. L. Jorgensen, Chief, Reactor Projects Section 2A
J. K. Heller, Senior Residerit Inspector
J. R. Roton, Resident Inspector
J. A. Isom, Senior Resident Inspector, D. C. Cook
D. G. Passehl, Resident Inspector, D. C. Cook
D. J. Hartland, Resident Inspector, D. C. Cook
A. S. Masciantonio, NRR Project Manager
M. K. Gamberoni, Project Engineer, NRR
S.
Sanders~ Intern
W. D. Pegg, Intern
D. Hann, Michigan Department of Public Health
Local Area Residents
' ,
2
Enclosure 1
B.
Comments Received from Licensee
Consumers Power Company's response to the Palisades Initial SALP 11
Report dated June 30, 1992, had no comments requiring revision to the
specific content of the report.
Because there is no revision, the