Proposed TS Page 3-82 Consisting of Table 3.17.4 Re Shutdown Cooling
ML18058A565
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/22/1992
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18058A564 List:
References
NUDOCS 9206290005
Download: ML18058A565 (2)


Text

1:..1 9206290005 920622 PDRI ADOCK 05000255 p

PDR ATTACHMENT 1

.Consumers Power Company Palisades Plant Docket 50-255 SHUTDOWN COOLING TECHNICAL SPECIFICATIONS CHANGE REQUEST Revised Technical Specification Change Page June 22, 1992 1 Page

\\~

Table 3.17.4 (Cont'd)

3.
  • Restore the system to OPERABLE status ~t the next scheduled refueling.

(m)

The provisions of Specification 3.0.4 are not applicable.

(n)

With one OPERABLE Pressurizer Wide Range Water Level Channel in lieu of the requirement of 3.17.2, restore the inoperable channel to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(o)

With no OPERABLE Pressurizer Wide Range Water Level Channels in lieu of the requirements of 3.17.2, either restore at least one of the inoperable channels to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(p)

The environmentally qualified core exit thermocouples are used in determining the minimum channels operable requirement.

(q)

With only three OPERABLE Core Exit Thermocouples per core quadrant, in lieu of the requirement of 3.17.2, either restore the inoperable channel to OPERABLE status within 7 days if repairs are feasible*

without shutting down or prepare and submit a Special Report to the Commission within 30 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

(r)

With the number of OPERABLE Core Exit Thermocouples less than three per core quadrant, in lieu of the requirements of 3.17.2, either restore three core exit thermocouples per core quadrant to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, or be in HOT SHUTDOWN or below within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and the reactor shall be placed in a condition where the affected equipment is not required, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

3.18 (Deleted) 3-82 Amendment No.i~, 11~, Ji~