ML18058A351
| ML18058A351 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 04/15/1992 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Slade G CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18058A352 | List: |
| References | |
| NUDOCS 9204220011 | |
| Download: ML18058A351 (2) | |
See also: IR 05000255/1992007
Text
APR 15 '992.
Docket No. 50-255
Consumers Power Company
ATTN:
Mr. Gerald B. Slade
Plant General Manager
27780 Blue Star Memorial Highway
covert, MI
49043
Dear Mr. Slade:.
SUBJECT:
NRC INSPECTION REPORT NO. 50-255/92007(DRS)
This refers to the inspection conducted by Messrs. R.
Langstaf~
and K. Salehi of this office on March_16 through April 13, 1992.
The inspection included a ~eview *of activities authorized for
your Palisades Nuclear Power Generating Station.
Prior to
leaving the site, our preliminary findings and conclusions were
discussed with you, and others of your staff.
The conclusions of
this inspection were discussed with Messrs. R. Gerling and
J. Kuemin of your staff via* telephone on April 13, 1992.
The purpose of this inspection was to f ollowup on issues related
to prior activities concerning your corrective actions and safety
evaluation programs.
Within these areas, the inspection
consisted of selective examinations o~ procedures and
representative records, and interviews with personnel.
Based on the results of this inspection, certain of your
activities appeared to be in violation ofNRC requirements, .as
described in the enclosed Notice.
The inspection showed that
actions had been taken to correct the identified _violation and to
prevent recurrence.
Our understanding of your corrective actions*
is described in Paragraph 2.e. of the enclosed inspection report.
Consequently, no reply to the violation.is required and we have
no further questions regarding this matter at this time.
In accordance with 10 CFR 2.790 of the Commission's regulations,
a copy of this letter and the enc~osures will be placed in the
NRC Public Document Room.
9204220011 920415
ADOCK 05000255
G
.*
Consumers Power Company
2
P.PR . 1 s 1ssz
We will gladly discuss any questions you hav~ concerning this.
inspection.
Sincerely,
i)R\\G!!:IAL SLGNED BY GE.OffREY -.G~ WRISHJ
Geoffrey c~ Wright; Chief
Operations Branch
Enclosures:
2.
Inspection Report
No. .50-255 /92007 (DRS)
cc w/enclosures:
David P. Hoffman, Vice President
Nuclear Operations
P. M. Donnelly, Safety and
Licensing Director
DCD/DCB (RIDS)
OC/LFDCB
.
.
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of Public Heaith
SRI, 'Big Rock Point
B. Holian, LPM, NRR
G. Bagchi, NRR
E. Pawlik, OI
RIII y
RII'I
Rrr@
~Cf/
~£ ~ps
Langstaff/cg
04/14 /92
. 04//y /92
04//y /92
RIII
Rjl?I
---~
01 \\
J~ensen.
- _
f!J
tWr1g9-t
04/14./92
04/ (~ /92