Monthly Operating Rept for Mar 1992 for Palisades Nuclear Plant
ML18058A337
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/31/1992
From: Handlovits S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18058A336 List:
References
NUDOCS 9204130273
Download: ML18058A337 (3)


Text

(

I

\\.

OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERICX>:

3.

LICENSED THERMAL POWER CMWt)

4.

NAMEPLATE RATING (GROss* MWe)

5.

DESIGN ELECTRl~L RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

OPERATING DATA REPORT Palisades 920301-920331 2530.0 811.7 805.0

    • no
7.

MAXIMUM DEPENDABLE CAPAC.ITV (NET MWe)

    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY CNET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERICXl
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON*LINE*
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH)
  • 17. GROSS ELECTRICAL ENERGY. GENERATED CMWH)
18. NET. ELECTRICAL ENERGY GENERATED (MWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET) 22 *. UNIT CAPACITY FACTOR (USING DER NET)

. 23. UNIT FORCED OUTAGE RATE This Month Yr*to*Date 744.0 2184.0 0.0 887.3

. 0.0 887.3 0.0 2225112.0 0.0 732040.0 0.0 696849.0 o.ox 40.6X

.O.OX 40.6X o.ox 43.7X o.ox 39.6X o.ox 1.4X

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT*PERICXl, ESTIMATED DATE OF STARTUP:

April 10, 1992

26. UNITS IN TEST STATUS (PRIOR TO COMM.ERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as.MDC Net prior to October 1985) 9204130213
  • 920401
  • r..

PDR ADOCK 05000255 : ;

R ~.

PDR-

\\-'---

Forecast DOCKET NO DATE 50*255 3*31*92 COMPLETED BY SMHandlovits TELEPHONE (616)764*8913 NOTES:

CU11Jlative 1n801.o 97933.9 93798.8 198879n5.o 62510765.0 58868857.0 52.8X 52.8X 49.8X*

41.* 1X 31.2X Achieved

v AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH 1992 DAY AVERAGE DAILY POWER LEVEL (MWe Net) *

1.

0

2.

0

' 3.

0

4.

0

5.

0

6.

0

7.

0

'8.

0

9.

0

10.

0

11.

0

12.

0

13.

0

14.

0

15.

0

16.

0 INSTRUCTIONS:

DAY

17.
18.
19.
20.
21.
22.

' 23.

24.
25.
26.
27.
28.
29.
30.
31.

DOCKET NO -------:::5=0_,-2=5=5 UNIT Palisades DATE __

0.;....4':":/-=0.=..l /-=9=2 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 0 0

0 0

0 0

0 0

0

  • O 0

0 0

0

,0 On this for~at, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

-1.-

SUMMARY

OF OPERATING EXPERIENCE FOR MARCH 1992 The plant remained shutdown for refueling throughout the entire month.