ML18057B360
| ML18057B360 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/31/1991 |
| From: | Handlovits S, Mlynarek M CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9111120428 | |
| Download: ML18057B360 (4) | |
Text
consumers Power POW ERi Nii MICHlliAN'S PRDliRESS Pa~sade~ Nuclear. Pl.an~: 27780 Blue Star Memorial Highway, Covert, Ml 49043 October 7, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of October, 1991.
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
Sincerely,.
MG Mlynarek Reactor Engineer CC:.
DPHoffman, P26-l l 7B RMRice, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades MALapinski, Pl3-104 Administrator, USNRC Document Control, 950*22*35*10tL SMH91*032 A CMS' ENERGY COMPANY
OPERATING DATA REPORT OPERATING STATUS:
- 1.
UNIT NAME Palisades
- 2.
REPORTING PERIOD:
911001-911031
- 3.
LICENSED THERMAL POWER (MWt) 2530.0
- 4.
NAMEPLATE RATING (GROSS MWe) 811.7
- 5.
DESIGN ELECTRICAL RATING (NET MWe) 805.0
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 770
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730
- 8.
IF CHANGES OCCUR I~ CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS.REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT.AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MOC NET).
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE This Month 745.0 745.0 745.0 1882521. 0 6115BO.O Yr-to-Date 7296.0 5497.1 5354.5 12676208.0 40B8130.0 582057.0 3872940.0 100.0%
73.4%
100.0%
73.4%
107.0%
72.7%
97.1%
65.9%
0.0%
3.5%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
60-0ay Refueling Outage scheduled to begin March 7, 1992
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MOC Net prior to October 1985)
DOCKET NO DATE 50-25~
10-31-91 COMPLETED BY SMHandl ovi ts TELEPHONE (616)764-8913 NOTES:
Cumulative 174159.0 95698.2 91572.1 193428653.0 60724665.0 57171113.0 52.6%
52.6%
49.5%
40.B%
31.6%
Achieved
AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER 1991 DAY AVERAGE DAILY POWER LEVEL (MWe Net)
- 1.
782
- 2.
777
- 3.
781
- 4.
784
- 5.
784
- 6.
7.87
- 7.
789
- 8.
785
- 9.
780
- 10.
788
- 11.
787
- 12.
785
- 13.
788
- 14.
786
- 15.
787
- 16.
789 INSTRUCTIONS:
DAY
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
- 26.
- 27.
- 28.
- 29.
- 30.
- 31.
DOCKET NO
. 50-255 UNIT Palisades DATE 11/07/91 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 785 778 789 789 786 783 768 762 774 773 775 776 771 773 779 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
e e
~..
SUMMARY
OF OPERATING EXPERIENCE FOR OCTOBER 1991 The unit operated at full power for the entire month of October.