ML18057B011
| ML18057B011 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 06/30/1991 |
| From: | Hanglovitis S, Mlynarek M CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9107100264 | |
| Download: ML18057B011 (4) | |
Text
'
- ~;... ' j consumers Power POWERING MICHIGAN"S PROGRESS Palisades Nuclear Plant
- 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 3, 1991 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed i~ a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June, 1991.
If you have any questions or concerns, please feel free to conta~t me at (616) 764-6913,*extension 0113.
Sincerely, MG Mlynarek Reactor Engineer CC:
DPHoffman, P26-117B RMRice, Palisades ABDavis, USNRC JLKuemin, Palisades Resident Inspector, Palisad~s DRHahn, Div of Rad Health Services, Lansing, MI**
BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAl atalo, Pali sad.es HRSnider, P21-129 Administrator, USNRC Document Control, 950*22*35*10/L SMH91*019
'? 107100264 9106:30
~
PDR' ADOCK 05000255 R.
-~
~)
OPERATING DATA REPORT OPERATING STATUS:
- 1.
UNIT NAME Palisades
- 2.
REPORTING PERIOD:
910601-910630
- 3.
LICENSED THERMAL POWER (MWt) 2530.0
- 4.
NAMEPLATE RATING (GROSS MWe) 811. 7
- 5.
DESIGN ELECTRICAL RATING (NET MWe) 805.0
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 770
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe)
- 730
- 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM NUMBERS 3-7) SINCE LAST REPORT, GIVE REASONS:
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR ~ESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENE.RATED (MWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. UNIT FORCED OUTAGE RATE This Month 720.0 720.0 720.0 1818648.0 588640.0 559782.0 100.0%
100.0%
106.5%
96.6%
0.0%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
DOCKET NO 50-255 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 NOTES:
Yr-to-Date Cumulative 4343.0 171206.0 2671.9 92873.0 2550.4 88768.0 5993735.0
. 1867 46180. 0 1936070.0 58572605.0 1833669.0 55131792.0 58.7%
51.8%
58.7%
51.8%
57.8%
48.7%*
52.4%
40.0%
1.6%
32.2%
Forecast Achieved
AVERAGE DAILY UNIT POWER LEVEL MONTH JUNE 1991 DAY AVERAGE DAILY POWER LEVEL (MWe Net)
I.
776
- 2.
775
- 3.
785
- 4.
787
- 5.
789
- 6.
783
- 7.
788
- 8.
784
- 9.
781
- 10.
775
- 11.
775
- 12.
777
- 13.
777
- 14.
771
- 15.
770
- 16.
774 INSTRUCTIONS:
DAY
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
- 26.
- 27.
- 28.
- 29.
- 30.
DOCKET NO 50-255 UNIT Palisades DATE 07/03/91 COMPLETED BY SMHandlovits TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 780 779 779 777 775 784 785 783 781 775 766 767 763 765 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR JUNE 1991 The plant maintained full power for the entire month of June 1991.