ML18057A932
| ML18057A932 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 05/29/1991 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Slade G CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18057A933 | List: |
| References | |
| NUDOCS 9106040086 | |
| Download: ML18057A932 (4) | |
See also: IR 05000255/1991009
Text
( ,, '-* .
Docket No. 50-255
Consumers Power Company
ATTN:
Gerald B. Slade
Plant General Manager
27780 Blue Star Memorial Highway
Covert, MI
49043
Dear Mr. Slade:
This refers to the routine safety inspection conducted by Mr. J. K. Heller
and others of this office during the period of April 6 through May 13,
1991, of activities at the Palisades Nuclear Generating Plant authorized
by NRC Facility Operating License No. DPR-20 and to the discussion of our
findings with you and other members of your staff at the conclusion of the
inspection. This refers also to the routine management meeting conducted with
you and members of your staff, and staff of the Nuclear Regulatory Commission,
Region III, which was held in the Region III office on April 18, 1991.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, an additional example of a violation, previously the
subject of a Notice of Violation issued with Inspection Report 50-255/91006(DRSS),
was identified. The example is documented in Paragraph 3.a~
11Maintenance
11
of
this report and is identified as Open Item 255/91009-0l(DRPJ.
A Notice
of Violation is not being issued for this example.
We will consider this
example in review of your corrective action for the identified problem.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, and the enclosed inspection report will be placed in the NRC
Public Document Room *
91060400:36
ADOCI<
G!
910529
05000255
,*
....
Consumers Power Company
2
We will gladly discuss any questions you have concerning this inspection.
Enclosure:
Inspection Report
No. 50-255/91009(DRP)
cc w/enclosure:
David P. Hoffman, Vice President
Nuclear Operations
P. M. Donnelly, Safety and
Licensing Director
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
Palisades, LPM, NRR
SRI, Big Rock Point
R~~
rrtw~/dp
1J.;/r1
Sincerely,
Brent Clayton, Chief
Projects Branch 2
RIII
Jo~en
~l~f\\
R1tJ111 £1.
~cf~n~~
I';
S--/2.o/t1 (
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION Ill
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60137
Docket No. 50-255
Consumers Power Company
ATTN:
Gerald B. Slade
Plant General Manager
27780 Blue Star Memorial Highway
Covert, MI
49043
Dear Mr. Slade:
This refers to the routine safety inspection conducted by Mr. J. K. Heller
and others of this office during the period of April 6 through May 13,
1991, of activities at the Palisades Nuclear Generating Plant authorized
by NRC Facility Operating license No. DPR-20 and to the discussion of our
findings with you and other members of your staff at the conclusion of the
inspection. This refers also to the routine management meeting conducted with
you and members of your staff, and staff of the Nuclear Regulatory Conunission,
Region III, which was held in the Region III office on April 18, 1991.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, an additional example of a violation, previously the
subject of a Notice of Violation issued with Inspection Report 50-255/91006(DRSS),
was identified. The example is documented in Paragraph 3.a~ "Maintenance" of
this report and is identified as Open Item 255/91009-0l(DRPJ. A Notice
of Violation is not being issued for this example.
We will consider this
example in review of your corrective action for the identified problem.
In accordance with 10 CFR 2.790 of the Conunission's regulations, a copy of
this letter, and the enclosed inspection report will be placed in the NRC
Public Document Room .
MAY :: S b::J1
Consumers Power Company
2
We will gladly discuss any questions you have concerning this inspection.
~;;;-~~
~
Brent Clayton, Chief
~~
Projects Branch 2
Enclosure:
Inspection Report
No. 50-255/91009(DRP)
cc w/enclosure:
David P. Hoffman, Vice President
Nuclear Operations
P. M. Donnelly, Safety and
Licensing Director
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, RIJI
James R. Padgett, Michigan Public
Service Commission
Mic~igan Department of
Public Health
Palisades, LPM, NRR
SRI, Big Rock Point