ML18054B596
| ML18054B596 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 05/09/1990 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hoffman D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML18054B597 | List: |
| References | |
| NUDOCS 9005160262 | |
| Download: ML18054B596 (2) | |
See also: IR 05000255/1990012
Text
,..,
Docket No. 50-255
Consumers Power Company
ATTN:
David P. Hoffman
Vice President
Nuclear Operations
1945 West Parnall Road
Jackson, MI
49201
Gentlemen:
MAY 0 9 1990
This refers to the routine safety inspection conducted by Messrs. E. R. Swanson,
J. K. Heller and J. F. Schapker during the period of March 9 through April* 19,
1990, of activities at the Palisades Nuclear Generating Plant authorized by
NRC Provisional Operating License No. DPR-20 and to the discussion of our
findings with Mr. G. B. Slade and others of your staff at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures arid representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as described in the enclosed Notice.
With respect to
violation Number 1 the inspection showed that action had been taken to correct
th~ identified violation and to prevent recurrence.
Our understanding of your
currective actions are described in Paragraph 2.c of the enclosed inspection
report.
Consequently, no reply tu the violation is required and we have no
further questions regarding this matter at this time.
Regarding the remaining item, a written response is required.
In accordance with 10 CFR 2.790 of the Commission
1 s regulations, a copy of
this letter, and the enclosed inspection report will be placed in the NRC
Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511 .
Consumers Power Company
2
We will gladly discuss any questions you have concerning this inspection.
Enclosures:
1.
2.
Inspection Report
No. 50-255/90012(DRP)
cc w/enclosures:
Mr. Kenneth W. Berry, Director
Nuclear Licensing
Gerald B. Slade, General Manager
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
James R. Padgett, Michigan Public
Service Commission
Michigan Department of
Public Health
B. Holian, LPM, NRR
rurr
Schweibinz/ib
Sincerely,
Brent Clayton, Chief
Reactor Projects Branch 2
RIII {?L.
Clayton
~~/jo