  • Docl<.et No. 50-255 Serial No. PAL-90-014 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201

Dear Mr. Berry:

March ;n, 1990 DISTRIBUTION Docket File NRC & Local PDRs PD31 Reading JZwo l i nski MRShuttleworth ADeAgazio OGC EJordan ACRS(lO)

SUBJECT:

SAFETY-RELATED PIPING REVERIFICATION PROGRAM (TAC NO. 75155)

The staff has reviewed your letter of January 10, 1990, which presented the details of your reverification program for safety-related piping 2-1/2 inches and larger.

The staff finds the subject program plan and schedule acceptable.

However, 152 feet of new pipe, installed during the PORV/Block Valve modification, is excluded from verification by walkdown.

Please provide, not later than April 13, 1990, your justification for this exclusion (considering that one hanger was found to be missing after the modification was completed),

or commit to including this piping in the program.

Your letter of November 21, 1989, committed to completing a root-cause analysis by March 31, 1990.

Although not specifically mentioned in the reverification program, we expect that this analysis will be completed as originally scheduled.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance under PL 96-511 is not required.

cc:

See next page PM/PD3l:~A)D..L£D3l:DRSP ADeAgazio JThQji"{l]

0~7190 03117190 Sincerely, Albert W. De Agazio, Sr. Project Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation

~I

'lo

p UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket No. 50-255 Serial No. PAL-90-014 Mr. Kenneth W. Berry Director, Nuclear Licensing Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201

Dear Mr. Berry:

March 21, 1990

SUBJECT:

SAFETY-RELATED PIPING REVERIFICATION PROGRAM (TAC NO. 75155)

The staff has reviewed your letter of January 10, 1990, which presented the details of your reverification program for safety-related piping 2-1/2 inches and larger.

The staff finds the subject program plan and schedule acceptable.

However, 152 feet of new pipe, installed during the PORV/Block Valve modification, is excluded from verification by walkdown.

Please provide, not later than April 13, 1990, your justification for this exclusion (considering that one hanger was found to be missing after the modification was completed),

or commit to including this piping in the program.

Your letter of November 21, 1989, committed to completing a root-cause analysis by March 31, 1990.

Although not specifically mentioned in the reverification program, we expect that this analysis will be completed as originally scheduled.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance under PL 96-511 is not required.

cc:

See next page Sincerely,

.-,Ai~

Albert. De Agazio, Sr~~;o~e~t Manager Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation

~

~*

Mr. Kenneth W. Berry Consumers Power Company cc:

M. I. Miller, Esquire Sidley & Austin 54th Floor One First National Plaza Chicago, Illinois 60603 Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Regional Administrator, Region III U.S. Nuclear Regulatory Corrrnission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Jerry Sarno Township Supervisor Covert Township 36197 M-140 Highway Covert, Michigan 49043 Office of the Governor Room 1 - Capitol Building Lansing, ~ichigan 48913 Mr. Gerald B. Slade Plant General Manager Palisades Plant 27780 Blue Star Memorial Hwy.

Covert, Michigan 49043 Resident Inspector c/o U.S. Nuclear Regulatory Corrrnission Pa 1 i sades Pl ant 27782 Blue Star Memorial Hwy.

Covert, Michigan 49043 Palisades Plant Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P.O. Box 30035 Lansing, Michigan 48909