Text

,,

consumers Power General Offices: 1945 West Parnall Road, Jackson, Ml 49201 * (517) 788-0550 February 28, 1990 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

1989 ANNUAL OPERATING REPORT -

OCCUPATIONAL EXPOSURE The annual report covering occupational exposure during 1989 as required by Palisades Technical Specification 6.9.1.b is attached.

Brj_an D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment 900:;: 12062:;:

PDR ADOCk.

R

3*~112:31 05000255 F'DC OC0290-0018-NL02 A CMS' ENERGY COMPANY

\\;

OC0290-0018-NL02 ATTACHMENT Consumers Power Company Palisades Plant Docket 50-255 1989 ANNUAL OPERATING REPORT OCCUPATIONAL EXPOSURE February 28, 1990 2 Pages

1989 Occupational Radiation Exposure The attached table sunmarizes personnel radiation exposure by job function, workgroup and employer for the year 1989.

The attached table and the method by which it was prepared meet the reporting requirements of Section 6.9.1.b of the Palisades Plant Technical Specifica-tions.

The exposures were derived from Direct Reading Dosimeter (ORD) data and were then adjusted by a factor which corrects the DRD exposure so that it is nearly equal to the thermoluminescent dosimeter exposure used in compiling the legal radiation exposure record for each individual. This correction factor is applied to each job function/workgroup/employer category on the attached table.

Special maintenance activities for the year 1989 include replacing PORV's, hangers and associated piping; replacing PCS cold leg drain valves; miscellaneous hanger work; steam generator replacement project preparation; shield cooling system repair and service water modifications

  • c IC0290-0042A-HP01 1

PALISADES NUCLEAR PLANT REGULATORY GUIDE 1.16.APPENDIX A ANNUAL REPORT I

Number of Personnel () 100 area>

Total Han-Ren I


~--------\\

Job Function I

I I

Contract I

I Contract Work Group I

Station I

Utility I

& Other Station I

Utility I

& Other


-------------- --------------1-------------- ---------------- -------------- ----*----------

Routine Operations & Surv.

I Maintenance Personnel 18 1

I 16 4.630 0.531 7.286 Operation~ Personnel 49 0

4 16.678 0.034 2.148 Health Phys'ics Personnel 26 0

37 10.847 0.000 14.500 Supervisqr~ PeLSonnel 11 0

3 3.351 0.092 0.787 Enqineerinq Per-. onnel 2

0 3

1.463 0.333 2.530 Routine Maintenance Maintenance Per~onnel 79 21 135 35.009 16.191

55. 718 Operations Pe~sonnel 5

0 2

2.096 0.009 0.379 Health Physics Pers.onnel 22 0

25 7.509 0.000 7.927 Supervisory Personnel 4

2 10 1.506 1.565 6.03-Enqineerinq Personnel 4

3 29 1.661 1.382 12.209 Inservice Inspection Maintenance Personnel 0

1 0

0.074 0.158 0.003 Operations Personnel 0

0 0

0.000 0.000 o.ooo Health Physics Personnel 1

0 7

0.437 o.ooo 1.623 Supervisory Personnel 0

0 0

0.011 0.000 0.000 Enqineerinq Personnel 0

0 24 0.026 0.141

17. 929 Special Maintenance Maintenance Personnel 2

0 120 1.442 0.011 43.989 Operations Personnel 1

0 3

0.490 0.000 1.150 Health Physics Personnel 0

0 4

0.496 0.000

1. 329 Supervisory Personnel 0

0 2

0.087 0.028 0.753 Enqineerinq Personnel 0

2 5

0.141 0.481 1.655 Haste Processing Maintenance Personnel 0

0 2

0.030 0.000 0.318 Operations Pe~sonnel 0

0 0

0.200 0.000 0.019 Health Physics Personnel 9

0 0

6.905 0.000 0.007 Supervisory Personnel 0

0 0

0.007 0.000 0.000 Enqineerinq Personnel 0

0 0

0.002 0.000 0.005-Refuelinq Maintenance Personnel 0

0 0

0.000 0.000 o.ooo Operations Personnel 0

0 0

0.000 0.000 0.000 Health Physics Personnel 0

0 0

0.000 0.000 0.000 Supervisory Personnel 0

0 0

0.000 0.000 0.000 Enqineerinq Personnel 0

0 0

0.000 0.000 0.000


--------------1-------------- -------------- -------------- -------------- --------------

TOTAL I

Maintenance Personnel 99 I

23 273 41.185 16.891 107.314 Operations Personnel 55 I

0 9

19.464 0.043 3.696 Health Physics Personnel 58 I

0 73 26.194 0.000 25.386 Supervisory Personnel 15 I

2 15 4.962 1.685 7.575 Enqineerinq Personnel 6

I 5

61 3.293 2.337 34.328 I


--------------1-------------- -------------- -------------- -------------- --;------------1 GRAND TOTAL 233 I

30 431 95.098 20.956 178.299 I