C[]llSmml~~~
PDJW~W PDWERINli MICHlliAN'S PRDliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 August 2, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of July, 1989.
George Goralski Reactor Engineer CC: DPHoffman, P26-117B KMHaas, Palisades ABDavis, USNRC KWBerry/RRFrisch, P24-614B CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 DRHahn, Div of Rad Health Services, Lansing, MI SLHall, Michigan Dept of Labor, Lansing, MI RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LLBumb, P21-135 GBSzczotka, P-21-135A HRSnider, P-21-129 Administrator, USNRC Document Control, 950*22*35*10/L MGM89*021 r 8908-140015 89673f. ----
PDR ADOCK 05000255 R
PNU OC0185-0001A-OP03 A CMS ENERGY COMPANY
OPERATING DATA REPORT DOCKET NO 50-255 DATE 08-02-89 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 OPERATING STATUS NOTES
- 1.
Unit Name: Palisades
~-:-~~~~~~~~~~~~~~~~~
- 2.
Reporting Period:
890701-890731
- 3.
Licensed Thermal Power (MWt):
2530
- 4.
Nameplate Rating (Gross MWe):
811.7
- 5.
Design Electrical Rating (Net MWe):
805
- 6.
Maximum Dependable Capacity (Gross MWe): "k-k770
- 7.
Maximum Dependable Capacity (Net MWe):
- 730
- 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
- 9.
Power Level to Which Restricted, if any (Net MWe):
623 (80%)
- 10.
Reasons for Restrictions, if any:
80% power limitation implemented based upon administrative guidelines with intent to improve steam generator reliability (not based upon regulatory requirements).
Hours In Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)
Gross Electrical Energy Generated (MWH)
Net Electrical Energy Generated (MWH)
Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate This Month 744.0 744.0 744.0 1 2510 2872 480 2290 450 2552 100.0 100.0 83.0 75.2 o.o Yr-to-Date 5 2087.0 4 2371.9 4 2355.0 8 2766 2456 2 2824 2000 2 2649 2988 85.6 85.6 71.4 64.7 14.4 Cumulative 154 2430.0 83 2379.3 79 2477.1 167 2317,461 52 2368 2485 49 2302 2237 51.5 51.5
- 48.9 39.7 34.2
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
22.'
- 23.
- 24.
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
45 day scheduled maintenance outage for steam generator repair to start
- 25.
- 26.
October 1 1989.
If Shut Down at End of Report Period, Estimated Date of Start Up:
Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure Forecast
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
OC0185-0001B-OP03 Achieved
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO ---"--50_-_2_5_5 UNIT Palisades DATE 08-02-89 COMPLETED BY MGMlynarek TELEPHONE (616)764-8913 MONTH ~~~-J_U_L_Y~_l9~8~9'--~~
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 612 17 610 2
604 18 606 3
616 19 606 4
603 20 610 5
601 21 612 6
605 22 605 7
608 23 603 8
609 24 604 9
598 25 599 10 593 26 594 11 602 27 596 12 606 28 602 13 610 29 610 14 612 30 605 15 613 31 605 16 611 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
OC0185-0001C-OP03
SUMMARY
OF OPERATING EXPERIENCE FOR JULY, 1989 Power was maintained at 80% for the entire month of the July at Palisades.
OC0185-0001E-OP03